Submittal Register (Attachment 2).xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Pike Island and Allegheny Hydraulic Cylinders
- Solicitation number
- W911WN25R9000
About this file
This document is a Submittal Register (Attachment 2) related to a federal contract opportunity for the purchase of Gate Operating Hydraulic Cylinders at the Pike Island L/D and Allegheny River 2 L/D facilities.
The Submittal Register lists various required submittals from the contractor, including qualifications of welding inspectors and welders, schematic and drawings, red-line revisions of shop drawings, welding procedure specifications, operations and maintenance data, and product data and test reports for the materials, welds, and shop assembly and testing. The contractor is required to submit these items for review and approval at various milestones throughout the project. The related federal contract opportunity is Solicitation Number W911WN-25-R-9000, issued by the Department of the Army Corps of Engineers Engineering District Pittsburgh, for the procurement of the Gate Operating Hydraulic Cylinders.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | TITLE AND LOCATION Pike Island L/D & Allegheny River 2 L/D - Gate Operating Hydraulic Cylinders Purchase | ||||||||||||||
| CONTRACTOR | CONTRACT NUMBER | ||||||||||||||
| ACTIVITY | |||||||||||||||
| No. | TRANS- MITTAL | ||||||||||||||
| No. | ITEM | ||||||||||||||
| No. | SPEC PARAGRAPH | ||||||||||||||
| No. | DESCRIPTION OF SUBMITTAL | TYPE OF SUBMITTAL | CLASSI- FICATION | CONTRACTOR REVIEWER | CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | GOVERNMENT ACTION | ||||||||
| RO or DO | SUBMIT NEEDED BY | APPROVAL NEEDED BY | MATERIAL NEEDED BY | CODE | CORPS RECEIVED DATE | CODE | CORPS RETURNED DATE | ||||||||
| 1. GENERAL | |||||||||||||||
| 1 | 1.6 | Qualifications of Welding Inspectors | PRECON SUBMTL | G RO | |||||||||||
| 2 | 1.6 | Qualifications of Welders and Welding Operators | PRECON SUBMTL | G RO | |||||||||||
| 3 | 1.6 | Schematic and Drawings | SHOP DRAWINGS | G DO | |||||||||||
| 4 | 1.6 | Red-Line Revisions of Shop Drawings | CLOSEOUT SUBMTL | G DO | |||||||||||
| 5 | 1.6 | Thermal Stress Relief | PRECON SUBMTL | G DO | |||||||||||
| 6 | 1.6 | Welding Procedure Specifications | SHOP DRAWINGS | G DO | |||||||||||
| 7 | 1.9 | Operations and Maintenance | OPERATION AND MAINTENANCE DATA | G DO | |||||||||||
| 8 | 1.13 | Project Schedule | PRECON SUBMTL | G RO |
| 2. PRODUCTS | |||||
| 1 | 2.1 | Materials and Mechanical Equipment | PRODUCT DATA | G DO | |
| 2 | 2.1 | Materials | TEST REPORTS | G DO | |
| 3 | 2.1.2 | Welds | TEST REPORTS | G DO | |
| 4 | 2.2 | Shop Assembly and Testing | PRODUCT DATA | G DO | |
| 5 | 2.2 | Shop Tests | TEST REPORTS | G DO |