Paint Coating Form (Attachment 3).pdf

PDF 274 KB Posted

Attached to
Pike Island and Allegheny Hydraulic Cylinders
Solicitation number
W911WN25R9000
Issued by

About this file

The document provided is a Paint Coating Form, which appears to be an attachment related to a federal contract opportunity. This form is used to record various inspection and monitoring activities associated with the application of paint coatings, including surface preparation, coating application, and final inspection.

The related federal contract opportunity is for the procurement of Gate Operating Hydraulic Cylinders at Pike Island and Allegheny, Pennsylvania. The solicitation number is W911WN-25-R-9000, and it is being issued by the Department of the Army Corps of Engineers Engineering District Pittsburgh as a request for proposal (RFP) for commercial products. The responses should be emailed to the specified points of contact and should include the solicitation number and title in the subject line.

View the file

Other files

File Type Posted
W911WN25R9000.pdf PDF
Hydraulic Cylinders - Location Drawings (Attachment 4).pdf PDF
Submittal Register (Attachment 2).xlsx XLSX spreadsheet
Reference Drawings (Attachment 1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: / / M T W Th F S Su

Project #:

Inspector:

QC Mgr Owner

Project/Client: Contr

Location:

Description: DFT Sheet NCR/CAR

Requirements:

Contractor: Spec # Revision #

1 Pre Surface Pep/Condition & Cleanliness 2 Surface Preparation Monitoring 3 Post Surface Preparation/Cleanliness & Profile 4 Pre Application Prep/Surface Cleanliness 5 Application Monitoring/Wet Film Thickness (WFT) 6 Post Application/Application Defects 7 Post Cure/Dry Film Thickness (DFT) 8 Nonconformance/Corrective Actions Follow-up 9 Final Inspection

Approved By:

New Maint Primer/Paint Age/Dry/Cure Time (Indicate AM or PM) : : : :

Steel Galvanize Concrete Other Dry Bulb Temp0 (C/F)

Hazard Sample Report # Wet Bulb Temp0 (C/F)

Degree of contamination: % Relative Humidity % % % % Test: Cl µg/cm2 / ppm Fe ppm pH Surface Temp0

(C/F) Min/Max / / / / Degree of Corrosion: Dew Point Temp0 (C/F)

Scale Pitting/Holes Crevices Sharp Edges Wind Direction/Speed Weld Moisture Oils Other Weather Conditions:

Painted Surface Condition:

Dry to: Touch Handle Recoat Start Time : Finish Time : Est. Sq/ft.

Dry/Over Spray Runs/Sags Pinholes Holidays Abrasion Fall Out Other Generic Type: Qty Mixed:

Manuf.: Mix Ratio:

Prod Name: Mix Method:

Solvent Clean Hand Tool Power Tool Prod #: Strain/Screen:

HP Wash PSI Other Color: Material Temp: F Abrasive Blast Abrasive Type Sample Kit Sz/Cond.: Sweat-in Time: Min/Hrs

Blast Hose Size Nozzle Size / PSI Shelf Life: Pot Life: Min/Hrs

Air Supply CFM Air Supply Cleanliness Reducer #:

Water/Oil Trap Check Equipment Condition Check (A) Qty Added: Pt/Qt/Gal

(B) % by Vol: %

(C) Specified WFT Avg: Mils

Job Specification SSPC/NACE - SP- Reducer: Achieved WFT Avg: Mils

SSPC/NACE Spec / Visual Stds Profile Check: Disc Tape Gauge Pump Pot Hose Dia. Air Check Specified mils avg. / Achieved mils Ratio/Size Hose Lng. SEP/Trap Surface effect on DFT Gauge/BMR mils GPM/CFM Spray Gun Filter

PSI Tip Sz. Agitator

Total Avg

DFT

Inspector's Signature Date

Airless/Conv. Spray Brush Roller Other

Dry Film Thickness DFT Last

Coat DFT This

Coat Spec Avg.

DFT

Gage Type /

Model Gage

Serial #

Batch #'s

Gage Calib.

Verified

Pg. Of COPY To:

Hold Point Inspections Performed

Ambient Conditions

Surface Cleanliness & Profile Measurement

Surface Preparation

Description of Areas & Work Performed

Attachments:

Paint Inspection:

Daily Coating Inspection Report

Primer Intermediate Topcoat Touch-up

Surface Conditions

Start Time: Finish Time: Est Sq/ft:

Application o o o o o o o o o o o o o o o o o

H4TSTJPP

Typewritten Text

ATTACHMENT 1

H4TSTJPP

Typewritten Text

File details come from the government source that posted it. Updated .