Paint Coating Form (Attachment 3).pdf
PDF 274 KB Posted
- Attached to
- Pike Island and Allegheny Hydraulic Cylinders
- Solicitation number
- W911WN25R9000
About this file
The document provided is a Paint Coating Form, which appears to be an attachment related to a federal contract opportunity. This form is used to record various inspection and monitoring activities associated with the application of paint coatings, including surface preparation, coating application, and final inspection.
The related federal contract opportunity is for the procurement of Gate Operating Hydraulic Cylinders at Pike Island and Allegheny, Pennsylvania. The solicitation number is W911WN-25-R-9000, and it is being issued by the Department of the Army Corps of Engineers Engineering District Pittsburgh as a request for proposal (RFP) for commercial products. The responses should be emailed to the specified points of contact and should include the solicitation number and title in the subject line.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN25R9000.pdf | ||
| Hydraulic Cylinders - Location Drawings (Attachment 4).pdf | ||
| Submittal Register (Attachment 2).xlsx | XLSX spreadsheet | |
| Reference Drawings (Attachment 1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: / / M T W Th F S Su
Project #:
Inspector:
QC Mgr Owner
Project/Client: Contr
Location:
Description: DFT Sheet NCR/CAR
Requirements:
Contractor: Spec # Revision #
1 Pre Surface Pep/Condition & Cleanliness 2 Surface Preparation Monitoring 3 Post Surface Preparation/Cleanliness & Profile 4 Pre Application Prep/Surface Cleanliness 5 Application Monitoring/Wet Film Thickness (WFT) 6 Post Application/Application Defects 7 Post Cure/Dry Film Thickness (DFT) 8 Nonconformance/Corrective Actions Follow-up 9 Final Inspection
Approved By:
New Maint Primer/Paint Age/Dry/Cure Time (Indicate AM or PM) : : : :
Steel Galvanize Concrete Other Dry Bulb Temp0 (C/F)
Hazard Sample Report # Wet Bulb Temp0 (C/F)
Degree of contamination: % Relative Humidity % % % % Test: Cl µg/cm2 / ppm Fe ppm pH Surface Temp0
(C/F) Min/Max / / / / Degree of Corrosion: Dew Point Temp0 (C/F)
Scale Pitting/Holes Crevices Sharp Edges Wind Direction/Speed Weld Moisture Oils Other Weather Conditions:
Painted Surface Condition:
Dry to: Touch Handle Recoat Start Time : Finish Time : Est. Sq/ft.
Dry/Over Spray Runs/Sags Pinholes Holidays Abrasion Fall Out Other Generic Type: Qty Mixed:
Manuf.: Mix Ratio:
Prod Name: Mix Method:
Solvent Clean Hand Tool Power Tool Prod #: Strain/Screen:
HP Wash PSI Other Color: Material Temp: F Abrasive Blast Abrasive Type Sample Kit Sz/Cond.: Sweat-in Time: Min/Hrs
Blast Hose Size Nozzle Size / PSI Shelf Life: Pot Life: Min/Hrs
Air Supply CFM Air Supply Cleanliness Reducer #:
Water/Oil Trap Check Equipment Condition Check (A) Qty Added: Pt/Qt/Gal
(B) % by Vol: %
(C) Specified WFT Avg: Mils
Job Specification SSPC/NACE - SP- Reducer: Achieved WFT Avg: Mils
SSPC/NACE Spec / Visual Stds Profile Check: Disc Tape Gauge Pump Pot Hose Dia. Air Check Specified mils avg. / Achieved mils Ratio/Size Hose Lng. SEP/Trap Surface effect on DFT Gauge/BMR mils GPM/CFM Spray Gun Filter
PSI Tip Sz. Agitator
Total Avg
DFT
Inspector's Signature Date
Airless/Conv. Spray Brush Roller Other
Dry Film Thickness DFT Last
Coat DFT This
Coat Spec Avg.
DFT
Gage Type /
Model Gage
Serial #
Batch #'s
Gage Calib.
Verified
Pg. Of COPY To:
Hold Point Inspections Performed
Ambient Conditions
Surface Cleanliness & Profile Measurement
Surface Preparation
Description of Areas & Work Performed
Attachments:
Paint Inspection:
Daily Coating Inspection Report
Primer Intermediate Topcoat Touch-up
Surface Conditions
Start Time: Finish Time: Est Sq/ft:
Application o o o o o o o o o o o o o o o o o
H4TSTJPP
Typewritten Text
ATTACHMENT 1
H4TSTJPP
Typewritten Text
File details come from the government source that posted it. Updated .