Submittal Register 528A8-23-811.xlsx

XLSX spreadsheet 133 KB Posted

Attached to
Z1DA--NRM-CONST 528A8-23-811 RENOVATE FOR CT A221-A223
Solicitation number
36C24224B0039
Issued by

About this file

This document is a Submittal Register for a federal contract opportunity to renovate the Cooling Tower at the Stratton VA Medical Center in Albany, New York.

The Submittal Register outlines the various submittals and documents required throughout the different phases of the construction project, including pre-mobilization, pre-demolition, pre-construction, pre-commissioning, and pre-closeout. It covers submittals across 26 divisions, such as general requirements, demolition, concrete, HVAC, plumbing, electrical, fire protection, and landscaping. Key submittal items include shop drawings, product data, samples, test reports, certifications, qualifications, operation and maintenance manuals, and commissioning documentation. The document provides a structured format for tracking the submittal process and review timelines.

The related federal contract opportunity is solicitation 36C24224B0039 for the renovation project, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. The scope involves replacing the failing cooling tower on the chiller plant building.

View the file

Other files

File Type Posted
528A8-23-811 - Bid Specifications.pdf PDF
36C24224B0039_1.docx DOCX document
FAR 52.225-2 Buy American Certification.docx DOCX document
Renovate CT A221-A223 Drawings.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division 01

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 1 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
SEE 232113 HYDRONIC PIPING FOR AND EXAMPLE OF A FULLY DEVELOPED SUBMITTAL REGISTER
Develope and provide a project specific submittal register in the premobilization stage. Update submittal register as needed for specific items proposed. Organize and assemble each submittal to include compete systems as may be needed, including applicable shop drawings. The submittal must include all parts of a multi-component system for proper review. Do not submit on products not proposed for use - Generic product line submittals will not be accepted. Where submitted products includes options, clearly select options proposed and clearly cross out options not being provided.XXXXXXXXXXXXX
When completing the submittal register, insert each submittal under the appropriate submittal section and identify the product/item being submitted, the specificaiton paragraph and product description. Where a significant quantity of submittal items are required (as shown under 232113) provide a separate spreadsheet for that Division). It is expected that wherever possible, a complete submittal package be submitted - allowing for a complete review of the system. For Example: When submitting on piping, provide the piping material, elbows, fittings, joining method, hangers, etc - so the system can have a comprehensive review. Identify all substitutions where being proposed.
010000'General Requirments1.5Document Control Electronic Security MemorandumX
1.6Construction Schedule - Areas of Work - PhasingX
Construction Schedule - Utility ShutdownX
1.7Existing Conditions Survey ReportX
1.9Nat'l Pollutant Discharge Elimination System PermitX
1.12As-Built DrawingsX
1.13Warranty Management PlanX
1.19Testing and Commissioning PlanX
1.20O&M ManualsX
Manufacturers' Instructions & TrainingX
1.21Schedule of Gov't Supplied EquipmentX
1.24Photographic DocumentationXXX
1.25Final Elevation PhotosX
1.26VA Tririga CPMS Project Administration
013323'Shop Drawings, Product Data and Samples - See individual Sections for specific requirements1.3Submittal Register & Updates as neededXXXXX
1.4Submittal ScedhulingXXXXX
1.5Submittal PreparationXXXXX
1.6Submittal Format & TransmissionXXXXX
1.7SamplesXXXXX
1.8Operation and Maintenance DataXXXXX
1.9Test Reports
013526'Safety Requirements1.4Accident Prevention Plan (APP)X
1.5Activity Hazard AreaX
1.13Health ScreeningX
015719'Temporary Environmental Controls1.4Environmental Proctection Plan
1.5ReportsXX
017419'Construction Waste Management1.4Environmental Protection PlanX
1.5Identification of Environmentally Effect Work AreasX
019100'Commissioning Requirements1.3Commissioning PlanX
1.3System Functional Perfomrance TestingX
1.3Pre-Functional ChecklistsX
1.3Test & Inspection ReportsX
1.3Corrective Action DocumentsX
1.3Preliminary Commissioning ReportX
1.3Final Commissioning ReportX

&9page &P of &N

Division 02

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 2 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
022113'Site Surveys1.3• Survey Drawings both Print and ElectronicX

024100' Demolition N/A

028211'Traditional Asbestos Abatement2.4• Work ScheduleX
• Staff Organization ChartX
• Asbestos Hazard Abatement PlanX
• Specifics of the Material and EquipmentX
• Landfill SpecificationsX
• Notifications/Arrangements with Regulatory AgenciesX
• Laboratory SpecificationsX
• QualificationsX
• Personnel InformationX
• Copy of Asbestos Abatement State LicenseX
• Proff of Rented equipment has been DecontaminatedX
• Manufacturer's Technical DataX
• Daily LogX
• CPIH/CIH DocumenrsX
• Completion of Abatement SubmittalsX
028213.13'Glovebag Asbestos Abatement2.5• Work ScheduleX
• Staff Organization ChartX
• Asbestos Hazard Abatement PlanX
• Specifics of the Material and EquipmentX
• Landfill SpecificationsX
• Notifications/Arrangements with Regulatory AgenciesX
• Laboratory SpecificationsX
• QualificationsX
• Personnel InformationX
• Copy of Asbestos Abatement State LicenseX
• Proff of Rented equipment has been DecontaminatedX
• Manufacturer's Technical DataX
• Daily LogX
• CPIH/CIH DocumentsX
• Completion of Abatement SubmittalsX
028213.19'Asbestos Floor Tile and Mastic
Abatement2.5• Work ScheduleX
• Staff Organization ChartX
• Asbestos Hazard Abatement PlanX
• Specifics of the Material and EquipmentX
• Landfill SpecificationsX
• Notifications/Arrangements with Regulatory AgenciesX
• Laboratory SpecificationsX
• QualificationsX
• Personnel InformationX
• Copy of Asbestos Abatement State LicenseX
• Proff of Rented equipment has been DecontaminatedX
• Manufacturer's Technical DataX
• Daily LogX
• CPIH/CIH DocumentsX
• Completion of Abatement SubmittalsX

&9page &P of &N

Division 03

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528-809
TITLE AND LOCATIONDivision 3 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
033000'Cast in Place Concrete1.6• Shop DrawingsX
• Mill Test ReportsXX
• Manufacturer's CertificatesXX
• Testing Agency for Concrete Mix DesignXX
• Test Report for Concrete Mix DesignsXX
033020'Concrete Slab on Grade1.6• Option for Slab PlacementX
• Written Protection ProgramX
033025'Concrete Slab on Metal Deck1.6• Option for Slab PlacementX
• Written Protection PlanX

&9page &P of &N

Division 04

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528-809
TITLE AND LOCATIONDivision 4 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
040513'Masonry Mortaring1.4• Manufacturer's Literature and DataX
• Test ReportsX
• CertificatesX
• QualificationsX
040516'Masonry Grouting1.3• Manufacturer's Literature and DataX
• Test ReportsX
• CertificatesX
• Sustainable Construction SubmittalsX
042000'Unit Masonry1.4• Submittal DrawingssX
• Manufacturer's Literature and DataX
• SamplesX
• Sustainable Construction SubmissionsX
• Test ReportsX
• CertificatesX
• Delegated Design Drawings / CalculationsX
047200'Cast Stone Masonry1.3• SamplesX
• Shop DrawingsX
• CertificatesX
• Manufacturer's Test ResultsX
• Laboratory DataX
• Jobs furnished by the ManufacturerX

&9page &P of &N

Division 05

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 5 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
055000'Metal Fabrications1.3•Manufacturer's Literature and DataX
• Shop DrawingsX
• Manufacturer's CertificatesX
• Design CalculationsX
• AnchorsX

&9page &P of &N

Division 06

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 6 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
061000'Rough Carpentry1.3• Shop DrawingsX
• Manufacturer's Literature and DataX
• Manufacturer's CertificatesX

&9page &P of &N

Division 07

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 7 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
072113'Thermal Insulation1.4• Submital DrawingsX
• Manufacturer's Literature and DataX
• Sustainable Construction SubmittalsX
078100'Applied Fireproofing1.3• Installer QualificationsX
• Testing Laboratory AccreditationsX
• Manufacturer's Literature and DataX
• CertificatesX
• MiscellaneousX
078400'Firestopping1.3• QualificationsX
• Manufacturers Literature / Data / Installation InstructionsX
• List of FM, UL, WH ClassificationX
• Laboratory Test ReportsX
• Submit CertificatesX
079200'Joint Sealants1.5• QualificationX
• CertificationX
• Manufacturer's Installation InstructionsX
• Cured SamplesX
• Manufacturer's Literature and DataX
• Manufacturer WarrantyX

&9page &P of &N

Division 08

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 8 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
081113'Hollow Metal Doors and Frames1.4• Submittal DrawingsX
• Manufacturer's Literature and DataX
• Test ReportsX
• QualificationsX
081400'Interios Wood Doors1.4• Shop DrawingsX
• Manufacturer's Literature and DataX
• SamplesX
• Test reportsX
• Operation and Maintenance DataX
083113'Access Doors and Frames2.1• Shop DrawingsX
• Manufacturer's Literature and DataX
087100'Door Hardware1.6• Hardware ScheduleX
• Samples and Manufacturers' LiteratureX
• Certificate of Compliance/ Test ReportX
088000'Glazing1.5• Manufaturer's CertificatesX
• Manufacturer's Literature and DataX
• Preconstruction Adhesion / Compatibility Test ReportsX

&9page &P of &N

Division 09

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 9 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
090600'Schedule for Finishes1.3• Shop DrawingsX
• Product DataX
• SamplesX
092216'Non-Structural Metal Framing1.4• Manufacturer's Literature and DataX
• Shop DrawingsX
• Test resultsX
092900'Gypsum Board1.4• Manufacturer's Literature and DataX
• Shop DrawingsX
• Test ResultsX
• CertificatesX
095100'Acoustical Ceilings1.4• Shop DrawingsX
• Product DataX
• SamplesX
• CertificationX
• Installer QualificationsX
• Operation and Maintenance DataX
096516'Resilient Sheet Flooring1.4• Manufacturer's Literature and DataX
• SamplesX
• CertificatesX
• QualificationsX
099100'Painting1.3• Painter QualificationsX
• Manufacturer's Literature and DataX
• Sample DataX
• Identity MarkersX
• Manufacturer's CertificationX

&9page &P of &N

Division 10

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 10 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
101400Signage1.4• Interior and Exterior Sign SamplesX
• Exterior Sign SamplesX
• Manufacturer's LiteratureX
• Sign Location PlanX
• Shop DrawingsX
• Full Size LayoutX
• QualificationsX
102600Wall and Door Protection1.4• Shop DrawingsX
• Manufacturer's Literature and DataX
• Test ReportX
• QualificationX
• Manufacturer's WarrantyX

&9page &P of &N

Division 11

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 11 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
117300Ceiling Mounted Patient Lift System1.4• Certificates of ComplianceX
• Manufacturer's LiteratureX
• Individual Room LayoutsX
• Manufacturer's ChecklistX

&9page &P of &N

Division 12

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 12 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
122400Window Shades1.4• Shop DrawingsX
• SamplesX
• Manufacturer's Literature and DataX
• Fire TestingX
• Manufacturer's WarrantyX
123200Manufactured Woood Casework1.3• Manufacturer's Literature and DataX
• Shop DrawingsX
• SamplesX
• CertificationX
123600Countertops1.3• Shop DrawingsX
• SamplesX

&9page &P of &N

Division 13

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 13 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
130541Seismic Requirements for Non-Structural Components1.4• Shop Drawings and CalculationsX
• Seismic Protection of PipingX
• Seismic Protection of Suspended Ductwork & Electrical CablesX
134900Radiation Protection1.5• Submittal DrawingsX
• Manufacturer's Literature and DataX
• Test ReportsX
• Delegated Design Drawings and CalculationsX
• Operation and Maintenance DataX

&9page &P of &N

Division 14

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528-809
TITLE AND LOCATIONDivision 14 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
149200Pneumatic Tube System1.05• Shop DrawingsX
• 3D Coordination and ModelingX
• Tube System Protocol DevelopmentX
•Operation and Maintenance ManualX

&9page &P of &N

Division 21

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 21 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
211313'Wet-Pipe Sprinkler Systems1.4• QualificationsX
• DrawingsX
• Manufacturer's Data SheetX
• Calculation SheetsX
• Valve ChartsX
• Final Document SubmittalsX

&9page &P of &N

Division 22

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 22 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedDate SentA/E ReviewVA ReviewDate ReceivedDate SentA/E ReviewVA ReviewDate ReceivedDate SentA/E ReviewVA Review
220511'Common Work1.4• Written CertificationX
• SubmittalsX
• Manufacturer's Literature and DataX
• Shop DrawingsX
• Operation and Maintenance ManualsX
• System Readiness ChecksX
• Training Plans/ Instructor QualificationsX
220711'Plumbing Insulation1.4• Manufacturer's Literature and DataX
• Shop DrawingsX
• SamplesX
• System Readiness ChecklistX
221100'Facility Water Distribution1.4• Manufacturer's Literature and DataX
• Operation and Maintenance ManualsX
• System Readiness ChecksX
• Training Plans/ Instructor QualificationsX
221300'Facility Sanitary and Vent Piping1.4•Manufacturer's Literature and DataX
• Shop drawingsX
• Operation and Maintenance ManualsX
• System Readiness ChecksX
• Training Plans/ Instructor QualificationsX
224000'Plumbing Fixtures1.4• Manufacturer's Literature and DataX
• Operation InstructionsX
• System Readiness ChecklistX
• Training Plans/ Instructor QualificationsX

&9page &P of &N

Division 23

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 23 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
230511'Common Work Results HVAC1.4• EquipmentX
• Manufacturers CoordinationX
• Shop DrawingsX
• SamplesX
• Manufacturer's Literature and DataX
• Rigging planX
• Maintenance Data and OperationsX
• Copies of HVAC Equipment SubmittalsX
• System Readiness ChecklistX
• Training Plans/ Instructor QualificationsX
230541'Noise and Vibration Control1.4• Manufacturer's Literature and DataX
• Load CalculationsX
• Seismic RequirementsX
230593'Testing, adjusting and Balancing For HVAC1.4• Qualifications of TAB AgencyX
• Set of Complete Publications based of TAB workX
• ReportsX
230800'Commissioning of
HVAC Systems3.2• Pre-Functional ChecklistX
232300Refrigerant Piping1.4• Shop DrawingsX
• Manufacturer's Literature and DataX
• CertificationX
• Design ManualX
233100HVAC Ducts and Casings1.4• Manufacturer's Literature and DataX
• Coordination DrawingsX
233700Air Outlets and Inlets1.4• Manufacturer's Literature and DataX
• Coordination DrawingsX
238100'Decentralized Unitary HVAC Equipment1.4•Manufacturer's Literature and DataX
• Operation and Mainenance ManualX
• CertificationsX
• System Readiness CheckX

&9page &P of &N

DIVISION 232113

SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
232113Hydronic Piping1.4• Manufacturer's Literature and DataX
• Manufacturer's Certified Data ReportX
• Welder's QualificationsX
• DrawingsX
• DiagramsX
• Operating and ManualsX
• Systems Readiness CheckX
• Trainer Plans/ Instructor QualificationsX
1.41.4,C,2 Pipe schedule
1.4,C,17 Seismic bracing details for piping (see also paragraph 3.4 and spec 130541)
1.4E Welders’ qualifications
1.4F Coordination Drawings
1.4G As-built Piping Diagrams
1.4H Complete O&M Manuals
1.4I Completed System Readiness Checklist for CxA
1.4J Training Plans and Instructor Qualifications
1.51.5B Welder’s certificate, if using steel pipe
1.61.6 As-built documentation
1.6A Updated product data for VA-approved substitutions
1.6B Updated O&M information
1.6C-D Updated as-built drawings to CxA prior to Commissioning, including lockout/tagout points, breaker numbers and locations, valve tag numbers, etc.
1.6E Certification documentation 21 days prior to Final Inspection
1.71.7 Spare Parts
2.12.1 Pipe and equipment supports, pipe sleeves, wall and ceiling plates
2.22.2 Pipe and Tubing
2.32.3 Fittings for Steel Pipe
2.42.4 Fittings for Copper Tubing
2.52.5 Fittings for Plastic Piping
2.62.6 Dielectric Fittings
2.72.7 Screwed Joints
2.82.8 Valves
2.8D Shutoff Valves: Ball, Butterfly, Actuators
2.8E Globe and Angle Valves
2.8F Check Valves
2.8G Balancing Valves
2.8H Automatic Balancing Valves
2.92.9 Water Flow Measuring Devices
2.12.10 Strainers
2.112.11 Flexible Connectors for Water Service
2.122.12 Expansion Joints
2.132.13 Hydronic System Components
2.132.13A Heat Exchanger
2.13B Plate and Frame Heat Exchanger
2.13C Optional Heat Transfer Package
2.13D Air Purger
2.13E Tangential Air Separator
2.13F Expansion Tank
2.13G Compression Tank
2.13H Pressure Reducing Valve
2.13I Pressure Relief Valve
2.13J Automatic Air Vent Valves
2.152.15 Gauges, Pressure and Compound
2.162.16 Pressure/temperature Test Provisions
2.172.17 Thermometers
3.53.5 Leak Testing Results
3.63.6 Flushing and Cleaning
3.6B COR approval of initial flushing
3.6C Documentation of Cleaning
3.6D Documentation of Final Flushing
3.73.7 Documentation of training during water treatment
3.93.9 Documentation of Startup and Testing
3.13.10 Documentation for Commissioning
3.113.11 Documentation of final training
3.11B Training Plans and instructor qualifications

Division 26

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 26 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
260511'Requirements for Electrical Installations• Maintenance & Operation ManualX
• SamplesX
260519'Low Voltage Cable1.4• Shop DrawingsX
• CertificationsX
260526'Grounding and Bonding for Electrical Systems1.4• Shop DrawingsX
• Test ReportsX
• CertificationsX
260533'Raceway and Boxes1.4• Shop DrawingsX
• CertificationsX
260573'Over Current Protective Device Coordination Study1.4• Product DataX
• Complete StudyX
• CertificationsX

260800' Commissioning of Electrical Systems 3.2 • Pre-Functional Checklist X

260923'Lighting Controls1.4• Shop DrawingsX
• ManualsX
• CertificationsX
262726'Wiring Devices1.4• Shop DrawingsX
• ManualX
• CertificationsX
262921'Enclosed Switches and Circuit Breakers1.4• Shop DrawingsX
• ManualX
• CertificationX
265100'Interior Lighting1.4• Shop DrawingsX
• ManualsX
• CertificationsX

&9page &P of &N

Division 27

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 27 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDS+E4:I39ubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
270511'Requirements for Communications Installations1.7• Manufacturer's Literature and DataX
• SubmittalsX
• QualificationsX
• Test ReportsX
1.8• Closeout Submittals
• Operation and Mainenance Manual
270526Grounding and Bonding for Communications1.3• Grounding Electrode Connection PlansX
• Closeout SubmittalX
270533Raceways and Boxes1.3• Size and Location of EquipmentX
• Layout of Conduit PenetrationsX
• Catalog CutsX
• CertificationX
270800Commissioning of Communication Systems1.4• Pre-Functional ChecklistX
• Training AgendasX
271000Control, Communication and Signal Wiring1.3• CertificationX
• Enviornmental SpecificationsX
• Circuit RequirementsX
• Conduit Size RequirementsX
• Closeout SubmittalsX
275223'Nurse Call and Code Blue Systems1.5• QualificationsX
1.8• Technical SubmittalsX
1.9• Project Record DocumentsX

&9page &P of &N

Division 28

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528A8-23-811
TITLE AND LOCATIONDivision 28 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
280500Common Work Results for Electronic Safety and Security1.6• Technical Data PackagesX
• SamplesX
• Readiness ChecklistX
280513Conductors and Cables for Electronic Safety and Security1.5• Manufacturer's Literature and DataX
• CertificatesX
• Shop DrawingsX
• Wire DiagramsX
• Cable Administration DrawingsX
• Project Planning DocumentsX
• Maintenance DataX
280526Grounding and Bonding1.3• Shop DrawingsX
• Test ReportsX
• CertificationX
280528.33Conduit/Backboxes1.5• Shop DrawingsX
• CertificationX
• System Readiness ChecklistX
• Product DataX
• Coordination DrawingsX
• Manfacturer Seismic Qualification CertificationX
28 31 00Fire Detection and Alarm1.4• Shop DrawingsX
• ManualsX
• CertificationsX

&9page &P of &N

Division 31

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528-809
TITLE AND LOCATIONDivision 31 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
312000Earthwork1.7• Rock Excavation ReportX
• Resume of all personnel involvedX
• Soil SamplesX
• Procedures & Location for disposal of unsatisfactory materialX
Source of Borrow MaterialX
• Notices for ConstructionX
31 23 19Dewatering1.5• Drawings and Desing DataX
• Inspection ReportsX
• Required PermitsX

316329 Drilling Concrete

Piers1.6• Drilling EquipmentX
• Pier Construction and CastingX
• Concrete Mix DesignsX
• Reinforcing DetailsX
• Shop DrawingsX
• Casting/Liner SpecsX
• Specifications of EquipmentX
• Concrete DetailsX
• Method of Reinforcement PlacementX
• Method for Shaft ExcavationsX
• Filling Voids MethodX
• Slurry Mixing MethodX
• Emergency Construction Joint ProcedureX
• Load TestX

&9page &P of &N

Division 32

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528-809
TITLE AND LOCATIONDivision 32 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
32 05 23Cerment and concrete for Exterior Improvements1.5• Submittal DrwingsX
• Manufacturer's Literature and DataX
• SamplesX
• Test ReportsX
• CertificatesX
• QualificationsX
32 12 16Asphalt Pavement1.5• Data and Test ReportsX
• CertificationsX
• Material Safety Data SheetsX
32 17 23Pavement Markings1.4• Submittal DrawingsX
• Manufacturer's Literature and DataX
• SamplesX
• CertificationsX
• QualificationsX
323113Chain Link Fences and Gates1.4• Submittal DrawingsX
• Manufacturer's Literature and DataX
• CertificatesX
• QualificationsX
32 90 00Planting1.5• Manufacturer's Literature and DataX
• SamplesX
• Test ReportsX
• CertificatesX
• QualificationsX
• Operations and Maintenance DataX

&9page &P of &N

Division 33

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528-809
TITLE AND LOCATIONDivision 33 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
33 08 00Commissioning of Site Utility Systems1.6• Submittals of Systems to be CommissionedX
33 10 00Water Utilities1.7• CertificationsX
• Manufacturer's Installation RecommendationsX
1.9• Warranties
3.2• Video Record of all pipingX
• Testing ReportsX

33 30 00 Sanitary Sewer Utilities 1.8 • Maufacturer's Literature and Data X

33 40 00 Storm Sewer Utilities 1.8 • Manufacturer's Literature and Data X

33 46 13 Foundation Drainage N/A

A. Manufacturers' Literature and Data shall be submitted for the following as one package:
1. Pipe, Fittings, and, Appurtenances.
2. Jointing Material.
3. Manhole and Structure Material.
4. Frames and Covers.
5. Steps and Ladders.

&9page &P of &N

Division 34

SUBMITTAL REGISTER FORMCONTRACT NUMBERPO NUMBER
528-809
TITLE AND LOCATIONDivision 34 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY
SPECIFICATION SECTIONSPECIFICATION TITLEPARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDSubmission ScheduleFirst SubmittalSecond SubmittalThird Submittal
Pre-MobilizationPre-DemolitionPre-ConstructionPre-CommissioningPre-CloseoutDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate FinishedDate ReceivedA/E ReviewDate Sent To VAVA ReviewDate Finished
34 71 13Passive Vehicle Barriers1.4• Submittal DrawingsX
• Delegated Design Drawings & CalculationsX

&9page &P of &N

Sheet1