Submittal Register 528A8-23-811.xlsx
XLSX spreadsheet 133 KB Posted
- Solicitation number
- 36C24224B0039
About this file
This document is a Submittal Register for a federal contract opportunity to renovate the Cooling Tower at the Stratton VA Medical Center in Albany, New York.
The Submittal Register outlines the various submittals and documents required throughout the different phases of the construction project, including pre-mobilization, pre-demolition, pre-construction, pre-commissioning, and pre-closeout. It covers submittals across 26 divisions, such as general requirements, demolition, concrete, HVAC, plumbing, electrical, fire protection, and landscaping. Key submittal items include shop drawings, product data, samples, test reports, certifications, qualifications, operation and maintenance manuals, and commissioning documentation. The document provides a structured format for tracking the submittal process and review timelines.
The related federal contract opportunity is solicitation 36C24224B0039 for the renovation project, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. The scope involves replacing the failing cooling tower on the chiller plant building.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 528A8-23-811 - Bid Specifications.pdf | ||
| 36C24224B0039_1.docx | DOCX document | |
| FAR 52.225-2 Buy American Certification.docx | DOCX document | |
| Renovate CT A221-A223 Drawings.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division 01
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 1 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| SEE 232113 HYDRONIC PIPING FOR AND EXAMPLE OF A FULLY DEVELOPED SUBMITTAL REGISTER | |||||||||||||||||||||||
| Develope and provide a project specific submittal register in the premobilization stage. Update submittal register as needed for specific items proposed. Organize and assemble each submittal to include compete systems as may be needed, including applicable shop drawings. The submittal must include all parts of a multi-component system for proper review. Do not submit on products not proposed for use - Generic product line submittals will not be accepted. Where submitted products includes options, clearly select options proposed and clearly cross out options not being provided. | XXXXXXXXXXXXX | ||||||||||||||||||||||
| When completing the submittal register, insert each submittal under the appropriate submittal section and identify the product/item being submitted, the specificaiton paragraph and product description. Where a significant quantity of submittal items are required (as shown under 232113) provide a separate spreadsheet for that Division). It is expected that wherever possible, a complete submittal package be submitted - allowing for a complete review of the system. For Example: When submitting on piping, provide the piping material, elbows, fittings, joining method, hangers, etc - so the system can have a comprehensive review. Identify all substitutions where being proposed. | |||||||||||||||||||||||
| 010000' | General Requirments | 1.5 | Document Control Electronic Security Memorandum | X | |||||||||||||||||||
| 1.6 | Construction Schedule - Areas of Work - Phasing | X | |||||||||||||||||||||
| Construction Schedule - Utility Shutdown | X | ||||||||||||||||||||||
| 1.7 | Existing Conditions Survey Report | X | |||||||||||||||||||||
| 1.9 | Nat'l Pollutant Discharge Elimination System Permit | X | |||||||||||||||||||||
| 1.12 | As-Built Drawings | X | |||||||||||||||||||||
| 1.13 | Warranty Management Plan | X | |||||||||||||||||||||
| 1.19 | Testing and Commissioning Plan | X | |||||||||||||||||||||
| 1.20 | O&M Manuals | X | |||||||||||||||||||||
| Manufacturers' Instructions & Training | X | ||||||||||||||||||||||
| 1.21 | Schedule of Gov't Supplied Equipment | X | |||||||||||||||||||||
| 1.24 | Photographic Documentation | X | X | X | |||||||||||||||||||
| 1.25 | Final Elevation Photos | X | |||||||||||||||||||||
| 1.26 | VA Tririga CPMS Project Administration |
| 013323' | Shop Drawings, Product Data and Samples - See individual Sections for specific requirements | 1.3 | Submittal Register & Updates as needed | X | X | X | X | X |
| 1.4 | Submittal Scedhuling | X | X | X | X | X | ||
| 1.5 | Submittal Preparation | X | X | X | X | X | ||
| 1.6 | Submittal Format & Transmission | X | X | X | X | X | ||
| 1.7 | Samples | X | X | X | X | X | ||
| 1.8 | Operation and Maintenance Data | X | X | X | X | X | ||
| 1.9 | Test Reports |
| 013526' | Safety Requirements | 1.4 | Accident Prevention Plan (APP) | X |
| 1.5 | Activity Hazard Area | X | ||
| 1.13 | Health Screening | X |
| 015719' | Temporary Environmental Controls | 1.4 | Environmental Proctection Plan | ||
| 1.5 | Reports | X | X |
| 017419' | Construction Waste Management | 1.4 | Environmental Protection Plan | X |
| 1.5 | Identification of Environmentally Effect Work Areas | X |
| 019100' | Commissioning Requirements | 1.3 | Commissioning Plan | X |
| 1.3 | System Functional Perfomrance Testing | X | ||
| 1.3 | Pre-Functional Checklists | X | ||
| 1.3 | Test & Inspection Reports | X | ||
| 1.3 | Corrective Action Documents | X | ||
| 1.3 | Preliminary Commissioning Report | X | ||
| 1.3 | Final Commissioning Report | X |
&9page &P of &N
Division 02
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 2 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 022113' | Site Surveys | 1.3 | • Survey Drawings both Print and Electronic | X |
024100' Demolition N/A
| 028211' | Traditional Asbestos Abatement | 2.4 | • Work Schedule | X | ||
| • Staff Organization Chart | X | |||||
| • Asbestos Hazard Abatement Plan | X | |||||
| • Specifics of the Material and Equipment | X | |||||
| • Landfill Specifications | X | |||||
| • Notifications/Arrangements with Regulatory Agencies | X | |||||
| • Laboratory Specifications | X | |||||
| • Qualifications | X | |||||
| • Personnel Information | X | |||||
| • Copy of Asbestos Abatement State License | X | |||||
| • Proff of Rented equipment has been Decontaminated | X | |||||
| • Manufacturer's Technical Data | X | |||||
| • Daily Log | X | |||||
| • CPIH/CIH Documenrs | X | |||||
| • Completion of Abatement Submittals | X |
| 028213.13' | Glovebag Asbestos Abatement | 2.5 | • Work Schedule | X | ||
| • Staff Organization Chart | X | |||||
| • Asbestos Hazard Abatement Plan | X | |||||
| • Specifics of the Material and Equipment | X | |||||
| • Landfill Specifications | X | |||||
| • Notifications/Arrangements with Regulatory Agencies | X | |||||
| • Laboratory Specifications | X | |||||
| • Qualifications | X | |||||
| • Personnel Information | X | |||||
| • Copy of Asbestos Abatement State License | X | |||||
| • Proff of Rented equipment has been Decontaminated | X | |||||
| • Manufacturer's Technical Data | X | |||||
| • Daily Log | X | |||||
| • CPIH/CIH Documents | X | |||||
| • Completion of Abatement Submittals | X |
| 028213.19' | Asbestos Floor Tile and Mastic | ||||||
| Abatement | 2.5 | • Work Schedule | X | ||||
| • Staff Organization Chart | X | ||||||
| • Asbestos Hazard Abatement Plan | X | ||||||
| • Specifics of the Material and Equipment | X | ||||||
| • Landfill Specifications | X | ||||||
| • Notifications/Arrangements with Regulatory Agencies | X | ||||||
| • Laboratory Specifications | X | ||||||
| • Qualifications | X | ||||||
| • Personnel Information | X | ||||||
| • Copy of Asbestos Abatement State License | X | ||||||
| • Proff of Rented equipment has been Decontaminated | X | ||||||
| • Manufacturer's Technical Data | X | ||||||
| • Daily Log | X | ||||||
| • CPIH/CIH Documents | X | ||||||
| • Completion of Abatement Submittals | X |
&9page &P of &N
Division 03
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528-809 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 3 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 033000' | Cast in Place Concrete | 1.6 | • Shop Drawings | X | |||||||||||||||||||
| • Mill Test Reports | X | X | |||||||||||||||||||||
| • Manufacturer's Certificates | X | X | |||||||||||||||||||||
| • Testing Agency for Concrete Mix Design | X | X | |||||||||||||||||||||
| • Test Report for Concrete Mix Designs | X | X |
| 033020' | Concrete Slab on Grade | 1.6 | • Option for Slab Placement | X | |
| • Written Protection Program | X |
| 033025' | Concrete Slab on Metal Deck | 1.6 | • Option for Slab Placement | X | |
| • Written Protection Plan | X |
&9page &P of &N
Division 04
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528-809 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 4 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 040513' | Masonry Mortaring | 1.4 | • Manufacturer's Literature and Data | X | |||||||||||||||||||
| • Test Reports | X | ||||||||||||||||||||||
| • Certificates | X | ||||||||||||||||||||||
| • Qualifications | X |
| 040516' | Masonry Grouting | 1.3 | • Manufacturer's Literature and Data | X | ||
| • Test Reports | X | |||||
| • Certificates | X | |||||
| • Sustainable Construction Submittals | X |
| 042000' | Unit Masonry | 1.4 | • Submittal Drawingss | X | |
| • Manufacturer's Literature and Data | X | ||||
| • Samples | X | ||||
| • Sustainable Construction Submissions | X | ||||
| • Test Reports | X | ||||
| • Certificates | X | ||||
| • Delegated Design Drawings / Calculations | X |
| 047200' | Cast Stone Masonry | 1.3 | • Samples | X |
| • Shop Drawings | X | |||
| • Certificates | X | |||
| • Manufacturer's Test Results | X | |||
| • Laboratory Data | X | |||
| • Jobs furnished by the Manufacturer | X |
&9page &P of &N
Division 05
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 5 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 055000' | Metal Fabrications | 1.3 | •Manufacturer's Literature and Data | X | |||||||||||||||||||
| • Shop Drawings | X | ||||||||||||||||||||||
| • Manufacturer's Certificates | X | ||||||||||||||||||||||
| • Design Calculations | X | ||||||||||||||||||||||
| • Anchors | X |
&9page &P of &N
Division 06
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 6 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 061000' | Rough Carpentry | 1.3 | • Shop Drawings | X | |||||||||||||||||||
| • Manufacturer's Literature and Data | X | ||||||||||||||||||||||
| • Manufacturer's Certificates | X |
&9page &P of &N
Division 07
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 7 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 072113' | Thermal Insulation | 1.4 | • Submital Drawings | X | |||||||||||||||||||
| • Manufacturer's Literature and Data | X | ||||||||||||||||||||||
| • Sustainable Construction Submittals | X |
| 078100' | Applied Fireproofing | 1.3 | • Installer Qualifications | X | ||
| • Testing Laboratory Accreditations | X | |||||
| • Manufacturer's Literature and Data | X | |||||
| • Certificates | X | |||||
| • Miscellaneous | X |
| 078400' | Firestopping | 1.3 | • Qualifications | X | ||
| • Manufacturers Literature / Data / Installation Instructions | X | |||||
| • List of FM, UL, WH Classification | X | |||||
| • Laboratory Test Reports | X | |||||
| • Submit Certificates | X |
| 079200' | Joint Sealants | 1.5 | • Qualification | X | ||
| • Certification | X | |||||
| • Manufacturer's Installation Instructions | X | |||||
| • Cured Samples | X | |||||
| • Manufacturer's Literature and Data | X | |||||
| • Manufacturer Warranty | X |
&9page &P of &N
Division 08
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 8 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 081113' | Hollow Metal Doors and Frames | 1.4 | • Submittal Drawings | X | |||||||||||||||||||
| • Manufacturer's Literature and Data | X | ||||||||||||||||||||||
| • Test Reports | X | ||||||||||||||||||||||
| • Qualifications | X |
| 081400' | Interios Wood Doors | 1.4 | • Shop Drawings | X | |
| • Manufacturer's Literature and Data | X | ||||
| • Samples | X | ||||
| • Test reports | X | ||||
| • Operation and Maintenance Data | X |
| 083113' | Access Doors and Frames | 2.1 | • Shop Drawings | X |
| • Manufacturer's Literature and Data | X |
| 087100' | Door Hardware | 1.6 | • Hardware Schedule | X | |
| • Samples and Manufacturers' Literature | X | ||||
| • Certificate of Compliance/ Test Report | X |
| 088000' | Glazing | 1.5 | • Manufaturer's Certificates | X | |
| • Manufacturer's Literature and Data | X | ||||
| • Preconstruction Adhesion / Compatibility Test Reports | X |
&9page &P of &N
Division 09
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 9 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 090600' | Schedule for Finishes | 1.3 | • Shop Drawings | X | |||||||||||||||||||
| • Product Data | X | ||||||||||||||||||||||
| • Samples | X |
| 092216' | Non-Structural Metal Framing | 1.4 | • Manufacturer's Literature and Data | X | |
| • Shop Drawings | X | ||||
| • Test results | X |
| 092900' | Gypsum Board | 1.4 | • Manufacturer's Literature and Data | X | ||
| • Shop Drawings | X | |||||
| • Test Results | X | |||||
| • Certificates | X |
| 095100' | Acoustical Ceilings | 1.4 | • Shop Drawings | X | ||
| • Product Data | X | |||||
| • Samples | X | |||||
| • Certification | X | |||||
| • Installer Qualifications | X | |||||
| • Operation and Maintenance Data | X |
| 096516' | Resilient Sheet Flooring | 1.4 | • Manufacturer's Literature and Data | X | |
| • Samples | X | ||||
| • Certificates | X | ||||
| • Qualifications | X |
| 099100' | Painting | 1.3 | • Painter Qualifications | X | ||
| • Manufacturer's Literature and Data | X | |||||
| • Sample Data | X | |||||
| • Identity Markers | X | |||||
| • Manufacturer's Certification | X |
&9page &P of &N
Division 10
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 10 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 101400 | Signage | 1.4 | • Interior and Exterior Sign Samples | X | |||||||||||||||||||
| • Exterior Sign Samples | X | ||||||||||||||||||||||
| • Manufacturer's Literature | X | ||||||||||||||||||||||
| • Sign Location Plan | X | ||||||||||||||||||||||
| • Shop Drawings | X | ||||||||||||||||||||||
| • Full Size Layout | X | ||||||||||||||||||||||
| • Qualifications | X |
| 102600 | Wall and Door Protection | 1.4 | • Shop Drawings | X | ||
| • Manufacturer's Literature and Data | X | |||||
| • Test Report | X | |||||
| • Qualification | X | |||||
| • Manufacturer's Warranty | X |
&9page &P of &N
Division 11
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 11 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 117300 | Ceiling Mounted Patient Lift System | 1.4 | • Certificates of Compliance | X | |||||||||||||||||||
| • Manufacturer's Literature | X | ||||||||||||||||||||||
| • Individual Room Layouts | X | ||||||||||||||||||||||
| • Manufacturer's Checklist | X |
&9page &P of &N
Division 12
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 12 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 122400 | Window Shades | 1.4 | • Shop Drawings | X | |||||||||||||||||||
| • Samples | X | ||||||||||||||||||||||
| • Manufacturer's Literature and Data | X | ||||||||||||||||||||||
| • Fire Testing | X | ||||||||||||||||||||||
| • Manufacturer's Warranty | X |
| 123200 | Manufactured Woood Casework | 1.3 | • Manufacturer's Literature and Data | X |
| • Shop Drawings | X | |||
| • Samples | X | |||
| • Certification | X |
| 123600 | Countertops | 1.3 | • Shop Drawings | X |
| • Samples | X |
&9page &P of &N
Division 13
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 13 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 130541 | Seismic Requirements for Non-Structural Components | 1.4 | • Shop Drawings and Calculations | X | |||||||||||||||||||
| • Seismic Protection of Piping | X | ||||||||||||||||||||||
| • Seismic Protection of Suspended Ductwork & Electrical Cables | X |
| 134900 | Radiation Protection | 1.5 | • Submittal Drawings | X | ||
| • Manufacturer's Literature and Data | X | |||||
| • Test Reports | X | |||||
| • Delegated Design Drawings and Calculations | X | |||||
| • Operation and Maintenance Data | X |
&9page &P of &N
Division 14
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528-809 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 14 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 149200 | Pneumatic Tube System | 1.05 | • Shop Drawings | X | |||||||||||||||||||
| • 3D Coordination and Modeling | X | ||||||||||||||||||||||
| • Tube System Protocol Development | X | ||||||||||||||||||||||
| •Operation and Maintenance Manual | X |
&9page &P of &N
Division 21
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 21 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 211313' | Wet-Pipe Sprinkler Systems | 1.4 | • Qualifications | X | |||||||||||||||||||
| • Drawings | X | ||||||||||||||||||||||
| • Manufacturer's Data Sheet | X | ||||||||||||||||||||||
| • Calculation Sheets | X | ||||||||||||||||||||||
| • Valve Charts | X | ||||||||||||||||||||||
| • Final Document Submittals | X |
&9page &P of &N
Division 22
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | ||||||||||||||||||
| 528A8-23-811 | ||||||||||||||||||||
| TITLE AND LOCATION | Division 22 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | |||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | |||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | Date Sent | A/E Review | VA Review | Date Received | Date Sent | A/E Review | VA Review | Date Received | Date Sent | A/E Review | VA Review | ||||
| 220511' | Common Work | 1.4 | • Written Certification | X | ||||||||||||||||
| • Submittals | X | |||||||||||||||||||
| • Manufacturer's Literature and Data | X | |||||||||||||||||||
| • Shop Drawings | X | |||||||||||||||||||
| • Operation and Maintenance Manuals | X | |||||||||||||||||||
| • System Readiness Checks | X | |||||||||||||||||||
| • Training Plans/ Instructor Qualifications | X |
| 220711' | Plumbing Insulation | 1.4 | • Manufacturer's Literature and Data | X | |
| • Shop Drawings | X | ||||
| • Samples | X | ||||
| • System Readiness Checklist | X |
| 221100' | Facility Water Distribution | 1.4 | • Manufacturer's Literature and Data | X | |
| • Operation and Maintenance Manuals | X | ||||
| • System Readiness Checks | X | ||||
| • Training Plans/ Instructor Qualifications | X |
| 221300' | Facility Sanitary and Vent Piping | 1.4 | •Manufacturer's Literature and Data | X | |
| • Shop drawings | X | ||||
| • Operation and Maintenance Manuals | X | ||||
| • System Readiness Checks | X | ||||
| • Training Plans/ Instructor Qualifications | X |
| 224000' | Plumbing Fixtures | 1.4 | • Manufacturer's Literature and Data | X | |
| • Operation Instructions | X | ||||
| • System Readiness Checklist | X | ||||
| • Training Plans/ Instructor Qualifications | X |
&9page &P of &N
Division 23
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 23 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 230511' | Common Work Results HVAC | 1.4 | • Equipment | X | |||||||||||||||||||
| • Manufacturers Coordination | X | ||||||||||||||||||||||
| • Shop Drawings | X | ||||||||||||||||||||||
| • Samples | X | ||||||||||||||||||||||
| • Manufacturer's Literature and Data | X | ||||||||||||||||||||||
| • Rigging plan | X | ||||||||||||||||||||||
| • Maintenance Data and Operations | X | ||||||||||||||||||||||
| • Copies of HVAC Equipment Submittals | X | ||||||||||||||||||||||
| • System Readiness Checklist | X | ||||||||||||||||||||||
| • Training Plans/ Instructor Qualifications | X |
| 230541' | Noise and Vibration Control | 1.4 | • Manufacturer's Literature and Data | X | |
| • Load Calculations | X | ||||
| • Seismic Requirements | X |
| 230593' | Testing, adjusting and Balancing For HVAC | 1.4 | • Qualifications of TAB Agency | X | |
| • Set of Complete Publications based of TAB work | X | ||||
| • Reports | X |
| 230800' | Commissioning of | ||
| HVAC Systems | 3.2 | • Pre-Functional Checklist | X |
| 232300 | Refrigerant Piping | 1.4 | • Shop Drawings | X |
| • Manufacturer's Literature and Data | X | |||
| • Certification | X | |||
| • Design Manual | X |
| 233100 | HVAC Ducts and Casings | 1.4 | • Manufacturer's Literature and Data | X | |
| • Coordination Drawings | X |
| 233700 | Air Outlets and Inlets | 1.4 | • Manufacturer's Literature and Data | X |
| • Coordination Drawings | X |
| 238100' | Decentralized Unitary HVAC Equipment | 1.4 | •Manufacturer's Literature and Data | X | |
| • Operation and Mainenance Manual | X | ||||
| • Certifications | X | ||||
| • System Readiness Check | X |
&9page &P of &N
DIVISION 232113
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 232113 | Hydronic Piping | 1.4 | • Manufacturer's Literature and Data | X | |||||||||||||||||||
| • Manufacturer's Certified Data Report | X | ||||||||||||||||||||||
| • Welder's Qualifications | X | ||||||||||||||||||||||
| • Drawings | X | ||||||||||||||||||||||
| • Diagrams | X | ||||||||||||||||||||||
| • Operating and Manuals | X | ||||||||||||||||||||||
| • Systems Readiness Check | X | ||||||||||||||||||||||
| • Trainer Plans/ Instructor Qualifications | X |
| 1.4 | 1.4,C,2 Pipe schedule |
| 1.4,C,17 Seismic bracing details for piping (see also paragraph 3.4 and spec 130541) | |
| 1.4E Welders’ qualifications | |
| 1.4F Coordination Drawings | |
| 1.4G As-built Piping Diagrams | |
| 1.4H Complete O&M Manuals | |
| 1.4I Completed System Readiness Checklist for CxA | |
| 1.4J Training Plans and Instructor Qualifications | |
| 1.5 | 1.5B Welder’s certificate, if using steel pipe |
| 1.6 | 1.6 As-built documentation |
| 1.6A Updated product data for VA-approved substitutions | |
| 1.6B Updated O&M information | |
| 1.6C-D Updated as-built drawings to CxA prior to Commissioning, including lockout/tagout points, breaker numbers and locations, valve tag numbers, etc. | |
| 1.6E Certification documentation 21 days prior to Final Inspection | |
| 1.7 | 1.7 Spare Parts |
| 2.1 | 2.1 Pipe and equipment supports, pipe sleeves, wall and ceiling plates |
| 2.2 | 2.2 Pipe and Tubing |
| 2.3 | 2.3 Fittings for Steel Pipe |
| 2.4 | 2.4 Fittings for Copper Tubing |
| 2.5 | 2.5 Fittings for Plastic Piping |
| 2.6 | 2.6 Dielectric Fittings |
| 2.7 | 2.7 Screwed Joints |
| 2.8 | 2.8 Valves |
| 2.8D Shutoff Valves: Ball, Butterfly, Actuators | |
| 2.8E Globe and Angle Valves | |
| 2.8F Check Valves | |
| 2.8G Balancing Valves | |
| 2.8H Automatic Balancing Valves | |
| 2.9 | 2.9 Water Flow Measuring Devices |
| 2.1 | 2.10 Strainers |
| 2.11 | 2.11 Flexible Connectors for Water Service |
| 2.12 | 2.12 Expansion Joints |
| 2.13 | 2.13 Hydronic System Components |
| 2.13 | 2.13A Heat Exchanger |
| 2.13B Plate and Frame Heat Exchanger | |
| 2.13C Optional Heat Transfer Package | |
| 2.13D Air Purger | |
| 2.13E Tangential Air Separator | |
| 2.13F Expansion Tank | |
| 2.13G Compression Tank | |
| 2.13H Pressure Reducing Valve | |
| 2.13I Pressure Relief Valve | |
| 2.13J Automatic Air Vent Valves | |
| 2.15 | 2.15 Gauges, Pressure and Compound |
| 2.16 | 2.16 Pressure/temperature Test Provisions |
| 2.17 | 2.17 Thermometers |
| 3.5 | 3.5 Leak Testing Results |
| 3.6 | 3.6 Flushing and Cleaning |
| 3.6B COR approval of initial flushing | |
| 3.6C Documentation of Cleaning | |
| 3.6D Documentation of Final Flushing | |
| 3.7 | 3.7 Documentation of training during water treatment |
| 3.9 | 3.9 Documentation of Startup and Testing |
| 3.1 | 3.10 Documentation for Commissioning |
| 3.11 | 3.11 Documentation of final training |
| 3.11B Training Plans and instructor qualifications |
Division 26
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 26 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 260511' | Requirements for Electrical Installations | • Maintenance & Operation Manual | X | ||||||||||||||||||||
| • Samples | X |
| 260519' | Low Voltage Cable | 1.4 | • Shop Drawings | X | |
| • Certifications | X |
| 260526' | Grounding and Bonding for Electrical Systems | 1.4 | • Shop Drawings | X | |
| • Test Reports | X | ||||
| • Certifications | X |
| 260533' | Raceway and Boxes | 1.4 | • Shop Drawings | X | |
| • Certifications | X |
| 260573' | Over Current Protective Device Coordination Study | 1.4 | • Product Data | X | |
| • Complete Study | X | ||||
| • Certifications | X |
260800' Commissioning of Electrical Systems 3.2 • Pre-Functional Checklist X
| 260923' | Lighting Controls | 1.4 | • Shop Drawings | X | |
| • Manuals | X | ||||
| • Certifications | X |
| 262726' | Wiring Devices | 1.4 | • Shop Drawings | X | |
| • Manual | X | ||||
| • Certifications | X |
| 262921' | Enclosed Switches and Circuit Breakers | 1.4 | • Shop Drawings | X | |
| • Manual | X | ||||
| • Certification | X |
| 265100' | Interior Lighting | 1.4 | • Shop Drawings | X | |
| • Manuals | X | ||||
| • Certifications | X |
&9page &P of &N
Division 27
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 27 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | S+E4:I39ubmission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 270511' | Requirements for Communications Installations | 1.7 | • Manufacturer's Literature and Data | X | |||||||||||||||||||
| • Submittals | X | ||||||||||||||||||||||
| • Qualifications | X | ||||||||||||||||||||||
| • Test Reports | X | ||||||||||||||||||||||
| 1.8 | • Closeout Submittals | ||||||||||||||||||||||
| • Operation and Mainenance Manual |
| 270526 | Grounding and Bonding for Communications | 1.3 | • Grounding Electrode Connection Plans | X | |
| • Closeout Submittal | X |
| 270533 | Raceways and Boxes | 1.3 | • Size and Location of Equipment | X | |
| • Layout of Conduit Penetrations | X | ||||
| • Catalog Cuts | X | ||||
| • Certification | X |
| 270800 | Commissioning of Communication Systems | 1.4 | • Pre-Functional Checklist | X |
| • Training Agendas | X |
| 271000 | Control, Communication and Signal Wiring | 1.3 | • Certification | X | |
| • Enviornmental Specifications | X | ||||
| • Circuit Requirements | X | ||||
| • Conduit Size Requirements | X | ||||
| • Closeout Submittals | X |
| 275223' | Nurse Call and Code Blue Systems | 1.5 | • Qualifications | X | ||
| 1.8 | • Technical Submittals | X | ||||
| 1.9 | • Project Record Documents | X |
&9page &P of &N
Division 28
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528A8-23-811 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 28 - SAMUEL S. STRATTON VAMC - DESIGN RENOVATE CT A221 & A222-223, ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 280500 | Common Work Results for Electronic Safety and Security | 1.6 | • Technical Data Packages | X | |||||||||||||||||||
| • Samples | X | ||||||||||||||||||||||
| • Readiness Checklist | X |
| 280513 | Conductors and Cables for Electronic Safety and Security | 1.5 | • Manufacturer's Literature and Data | X | |
| • Certificates | X | ||||
| • Shop Drawings | X | ||||
| • Wire Diagrams | X | ||||
| • Cable Administration Drawings | X | ||||
| • Project Planning Documents | X | ||||
| • Maintenance Data | X |
| 280526 | Grounding and Bonding | 1.3 | • Shop Drawings | X | |
| • Test Reports | X | ||||
| • Certification | X |
| 280528.33 | Conduit/Backboxes | 1.5 | • Shop Drawings | X | |
| • Certification | X | ||||
| • System Readiness Checklist | X | ||||
| • Product Data | X | ||||
| • Coordination Drawings | X | ||||
| • Manfacturer Seismic Qualification Certification | X |
| 28 31 00 | Fire Detection and Alarm | 1.4 | • Shop Drawings | X |
| • Manuals | X | |||
| • Certifications | X |
&9page &P of &N
Division 31
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528-809 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 31 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 312000 | Earthwork | 1.7 | • Rock Excavation Report | X | |||||||||||||||||||
| • Resume of all personnel involved | X | ||||||||||||||||||||||
| • Soil Samples | X | ||||||||||||||||||||||
| • Procedures & Location for disposal of unsatisfactory material | X | ||||||||||||||||||||||
| Source of Borrow Material | X | ||||||||||||||||||||||
| • Notices for Construction | X |
| 31 23 19 | Dewatering | 1.5 | • Drawings and Desing Data | X | |
| • Inspection Reports | X | ||||
| • Required Permits | X |
316329 Drilling Concrete
| Piers | 1.6 | • Drilling Equipment | X | |||
| • Pier Construction and Casting | X | |||||
| • Concrete Mix Designs | X | |||||
| • Reinforcing Details | X | |||||
| • Shop Drawings | X | |||||
| • Casting/Liner Specs | X | |||||
| • Specifications of Equipment | X | |||||
| • Concrete Details | X | |||||
| • Method of Reinforcement Placement | X | |||||
| • Method for Shaft Excavations | X | |||||
| • Filling Voids Method | X | |||||
| • Slurry Mixing Method | X | |||||
| • Emergency Construction Joint Procedure | X | |||||
| • Load Test | X |
&9page &P of &N
Division 32
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528-809 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 32 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 32 05 23 | Cerment and concrete for Exterior Improvements | 1.5 | • Submittal Drwings | X | |||||||||||||||||||
| • Manufacturer's Literature and Data | X | ||||||||||||||||||||||
| • Samples | X | ||||||||||||||||||||||
| • Test Reports | X | ||||||||||||||||||||||
| • Certificates | X | ||||||||||||||||||||||
| • Qualifications | X |
| 32 12 16 | Asphalt Pavement | 1.5 | • Data and Test Reports | X | |
| • Certifications | X | ||||
| • Material Safety Data Sheets | X |
| 32 17 23 | Pavement Markings | 1.4 | • Submittal Drawings | X | |
| • Manufacturer's Literature and Data | X | ||||
| • Samples | X | ||||
| • Certifications | X | ||||
| • Qualifications | X |
| 323113 | Chain Link Fences and Gates | 1.4 | • Submittal Drawings | X | |
| • Manufacturer's Literature and Data | X | ||||
| • Certificates | X | ||||
| • Qualifications | X |
| 32 90 00 | Planting | 1.5 | • Manufacturer's Literature and Data | X | ||
| • Samples | X | |||||
| • Test Reports | X | |||||
| • Certificates | X | |||||
| • Qualifications | X | |||||
| • Operations and Maintenance Data | X |
&9page &P of &N
Division 33
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528-809 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 33 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 33 08 00 | Commissioning of Site Utility Systems | 1.6 | • Submittals of Systems to be Commissioned | X |
| 33 10 00 | Water Utilities | 1.7 | • Certifications | X | |
| • Manufacturer's Installation Recommendations | X | ||||
| 1.9 | • Warranties | ||||
| 3.2 | • Video Record of all piping | X | |||
| • Testing Reports | X |
33 30 00 Sanitary Sewer Utilities 1.8 • Maufacturer's Literature and Data X
33 40 00 Storm Sewer Utilities 1.8 • Manufacturer's Literature and Data X
33 46 13 Foundation Drainage N/A
| A. Manufacturers' Literature and Data shall be submitted for the following as one package: |
| 1. Pipe, Fittings, and, Appurtenances. |
| 2. Jointing Material. |
| 3. Manhole and Structure Material. |
| 4. Frames and Covers. |
| 5. Steps and Ladders. |
&9page &P of &N
Division 34
| SUBMITTAL REGISTER FORM | CONTRACT NUMBER | PO NUMBER | |||||||||||||||||||||
| 528-809 | |||||||||||||||||||||||
| TITLE AND LOCATION | Division 34 - SAMUEL S. STRATTON VAMC - DESIGN NEW EMERGENCY DEPARTMENT , ALBANY, NY | ||||||||||||||||||||||
| SPECIFICATION SECTION | SPECIFICATION TITLE | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | Submission Schedule | First Submittal | Second Submittal | Third Submittal | ||||||||||||||||
| Pre-Mobilization | Pre-Demolition | Pre-Construction | Pre-Commissioning | Pre-Closeout | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | Date Received | A/E Review | Date Sent To VA | VA Review | Date Finished | ||||
| 34 71 13 | Passive Vehicle Barriers | 1.4 | • Submittal Drawings | X | |||||||||||||||||||
| • Delegated Design Drawings & Calculations | X |
&9page &P of &N
Sheet1