Submittal_List.docx
DOCX document 21 KB Posted
- Solicitation number
- 140P2121R0042
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign_In_Sheet_0001.jpg | JPG image | |
| Sol_140P2121R0042_Amd_0001.pdf | ||
| davis_bacon_wage_determination.pdf | ||
| THCO_Roof_Specifications.docx | DOCX document | |
| Sol_140P2121R0042.pdf | ||
| THCO_Roof_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THOMAS COLE NATIONAL HISTORIC SITE
REPAIR AND PRESERVE OLD STUDIO ROOF
SUBMITTAL REQUIREMENTS AND LISTING
SECTION 01 35 23 - SAFETY REQUIREMENTS
1.1 SUBMITTALS
A. Accident Prevention Plan: After contract award and before the Pre-Construction conference, submit for review, an Accident Prevention Plan. Plan shall be project-specific with a hazard’s analysis performed for construction site, visitor safety, and employees working in the construction site. Included will be a roof access plan outlining the OSHA approved scaffold, aerial lift, or ladder system used to perform the work including plans for high winds and inclement weather.
2.1 ACCIDENT PREVENTION PLAN
A. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
| 1. Name of responsible supervisor to carry out the program. | ||
| 2. Weekly and monthly safety meetings. | ||
| 3. First aid procedures. | ||
| 4. Outline of each phase of the work, the hazards associated with each major phase, and the | methods proposed to provide for property protection and safety of the public, National Park | Service personnel, and Contractor's employees. Identify the work included under each phase. |
| 5. Planning for possible emergency situations, such as floods, fires, power outages, and | windstorms. Such planning shall take into consideration the nature of construction, site | conditions, and degree of exposure of persons and property. |
SECTION 01 35 91 - HISTORIC PRESERVATION TREATMENT PROCEDURES
1.3 SUBMITTALS
A. Historic Preservation Treatment Program: Submit a written plan for each phase or process including protection of surrounding materials during operations. Describe in detail materials, methods, and equipment to be used for each phase of work.
B. Alternative Methods and Materials: If alternative methods and materials to those indicated are proposed for any phase of work, provide a written description including evidence of successful use on other, comparable projects, and program of testing to demonstrate effectiveness for use on this Project.
C. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including finish surfaces that might be misconstrued as damage caused by historic treatment operations. Submit to COR before work begins.
SECTION 01 40 00 - QUALITY REQUIREMENTS
1.4 SUBMITTALS
A. Quality Control Plan:
| 1. After contract award and before the Pre-Construction conference, submit for approval a written Contractor | Quality Control (CQC) plan. | |
| 2. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within | 10 | days. |
| 3. The Government reserves the right to require changes in the plan during the contract period | as necessary to | obtain the quality specified. |
| 4. No change in the approved plan may be made without written concurrence by the | Contracting Officer. |
B. Contractor's Quality Control Daily Reports: Submit showing all inspections and tests on the first workday following the date covered by the report. Quality Control Supervisor shall utilize the forms attached at the end of this Section.
C. If the CQC plan and Quality Control Daily Reports are not submitted as specified, the Contracting Officer may retain all payments until such time a plan is accepted and implemented, or may retain payments for work completed on days there are no Quality Control Daily Reports.
2.1 QUALITY CONTROL PLAN
A. The Quality Control Plan shall include:
| 1. A list of personnel responsible for quality control and assigned duties. Include each person's | qualifications. |
| 2. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining | assigned duties. |
| 3. Methods of performing, documenting, and enforcing quality control of all work. |
SECTION 01 73 40 – EXECUTION
1.1 SUMMARY
A. SUBMITTALS:
1. Quantity Surveys: Submit 2 copies showing quantities of work performed and actual construction completed and in place.
SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
1.4 SUBMITTALS
A. Waste Management Plan: After award of the contract and prior to the scheduled Pre-Construction Conference, the Contractor shall submit a draft Waste Management Plan to the Contracting Officer for approval. Submit 3 copies of plan. Revise and resubmit Plan as required by the Contracting Officer. Approval of the Contractor’s Plan will not relieve the Contractor of responsibility for compliance with applicable environmental regulations.
B. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
C. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
SECTION 06 15 16 - WOOD ROOF SHEATHING
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product. Include species and grading rules applied to product.
SECTION 07 31 29 - WOOD SHINGLES
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
| 1. Wood Shingles |
| 2. Ridge and Hip Unit (if prefabricated). |
| 3. Selected underlayment. |
| 4. Selected continuous ventilation product. |
B. INFORMATIONAL SUBMITTALS
| 1. Qualification Data: For qualified Installer. |
| 2. Warranties: Sample of special warranties. |
SECTION 07 62 00 - SHEET METAL FLASHING AND TRIM
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each manufactured product and accessory.
| 1. Include identification of material, thickness, weight, and finish for each item and location in | Project. |
| 2. Include details of roof-penetration flashing. | |
| 3. Include details of edge conditions, including eaves, ridges, valleys, rakes, crickets, and | counter flashings as applicable. |
END OF SUBMITTAL REQUIREMENTS AND LISTING
SUBMITTAL LISTING
| SECTION |
| SUB SECTION |
| DESCRIPTION |
| SUBMIITTAL DUE DATE |
| APPROVAL DATE |
| APPROVAL TRANSMITTAL DATE |
| 01 35 23 |
| 1.1 |
| ACCIDENT PREVENTION PLAN |
| 30 CALENDAR DAYS, POST AWARD |
| 01 35 91 |
| 1.4 |
| QUALITY CONTROL PLAN |
| 30 CALENDAR DAYS, POST AWARD |
| 01 40 00 |
| 1.3 |
| QUALITY CONTROL PLAN |
| 30 CALENDAR DAYS, POST AWARD |
| 01 73 40 |
| 1.1. |
| QUANTITY SURVEY |
| 10 CALENDAR DAYS POST COMPLETION |
| 01 74 19 |
| 1.4 |
| WASTE MANAGEMENT PLAN |
| 30 CALENDAR DAYS, POST AWARD |
| 06 15 16 |
| 1.3 |
| PRODUCT DATA - SHEATHING |
| 30 CALENDAR DAYS, POST AWARD |
| 06 15 16 |
| 1.3 |
| PRODUCT DATA - PLYWOOD |
| 30 CALENDAR DAYS, POST AWARD |
| 07 31 29 |
| 1.3 |
| PRODUCT DATA - SHINGLES |
| 30 CALENDAR DAYS, POST AWARD |
| 07 31 29 |
| 1.3 |
| PRODUCT DATA – FABRICATED RIDGE CAP |
| 30 CALENDAR DAYS, POST AWARD |
| 07 31 29 |
| 1.3 |
| PRODUCT DATA – UNDERLAYMENT, SYNTHETIC |
| 30 CALENDAR DAYS, POST AWARD |
| 07 31 29 |
| 1.3 |
| PRODUCT DATA – UNDERLAYMENT, ASPHALT-SATURATED ORGANIC FELT |
| 30 CALENDAR DAYS, POST AWARD |
| 07 31 29 |
| 1.3 |
| PRODUCT DATA – UNDERLAYMENT, SELF-ADHERING SHEET UNDERLAYMENT |
| 30 CALENDAR DAYS, POST AWARD |
| 07 31 29 |
| 1.4 |
| PRODUCT DATA – CONTINUOS VENTILATION PRODUCT |
| 30 CALENDAR DAYS, POST AWARD |
| 07 62 00 |
| 1.4 |
| PRODUCT DATA – LEAD COATED COPPER |
| 30 CALENDAR DAYS, POST AWARD |
| 07 62 00 |
| 1.4 |
| PRODUCT DATA – LEAD SHEET |
| 30 CALENDAR DAYS, POST AWARD |
| 07 62 00 |
| 1.4 |
| PRODUCT DATA – SPLIT BOOT MAST FLASHING |
| 30 CALENDAR DAYS, POST AWARD |