Submital_List.pdf
PDF 184 KB Posted
- Attached to
- Greenhouse Rehabilitation
- Solicitation number
- 140P6425Q0004
About this file
This is a submittal requirements list from the National Park Service for a greenhouse rehabilitation project. The document outlines required submittals for Division 1 items including polycarbonate panels, iGrow 800 Green House Controller (or equal), Contractor Panel, Conduit Pipe Hanger, Wadsworth STEPUp Control (or equal), and Contractor panel and Link4 iGrow 800 (or equal).
The submittal matrix indicates which items require manufacturer data and instructions, shop drawings, and samples. Key components like the polycarbonate panels require both shop drawings and manufacturer data, while control systems (iGrow 800 and Wadsworth STEPUp) require manufacturer data, shop drawings, and additional manufacturer instructions. The document provides a structured format for contractors to understand exactly what documentation and samples must be submitted for each component of the greenhouse rehabilitation work.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C E
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
Division 1 1.2.2.2 Polycarbonate Panels X X
Division 1 1.2.2.6 iGrow 800 Green House Controller (Or Equal) X X X
Division 1 1.2.2.6 Contractor Panel (Or Equal) X X
Division 1 1.2.2.13 Conduit Pipe Hanger X
Division 1 1.2.2.14 Wadsworth STEPUp Control (Or Equal) X X X
Division 1 1.2.2.14 Contractor panel and Link4 iGrow 800 (Or Equal) X X X
SUBMITTAL LIST
Spec. Sec. Par. No. Description
INFORMATIONAL ACTION
National Park Service
SUBMITTAL REQUIREMENTS (indicate with an "X")
File details come from the government source that posted it. Updated .