Subcontractor_Listing.pdf
PDF 224 KB Posted
- Attached to
- Janitorial Services
- Solicitation number
- 2023-IFB-LM-878
- Issued by
- Los Angeles County, California
About this file
The document is a Subcontractor Listing/Shoring Design form, which appears to be a standard template for documenting subcontractors and potential engineering requirements for a construction project. The form provides two sections: a Subcontractor Listing area and a Shoring Design section. In the Subcontractor Listing section, contractors are expected to list the names, addresses, and descriptions of work for all subcontractors involved in the project. The Shoring Design section requires contractors to list the Civil or Structural Engineer responsible for shoring design if such work is required, or to write "NONE" if no shoring is necessary.
While the form itself does not contain specific project details, it is associated with a City of Pasadena Public Health Department janitorial services contract for cleaning services at a satellite location in Northwest Pasadena. The cleaning services would cover approximately 3,200 square feet, including 11 office spaces, 2 common areas, 2 storage areas, 4 restroom facilities, and 1 kitchen. This form would likely be part of the bidding documentation for potential contractors to complete and submit as part of their proposal for the janitorial services contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .