Subcontractor_Listing.pdf
PDF 224 KB Posted
- Solicitation number
- 2024-IFB-LM-0118
- Issued by
- Los Angeles County, California
About this file
The document is a Subcontractor Listing/Shoring Design form related to the Pasadena Fire Department's procurement of a BeaverFit Performance Locker. The form provides structured sections for listing potential subcontractors and engineers responsible for shoring design, should such specialized work be required for the project. This form appears to be a standard submission document for potential bidders to detail their proposed subcontractors and technical design support for the 10-foot BeaverFit Performance Locker project.
The form is deliberately left blank, allowing bidders to fill in the specific names, addresses, and descriptions of subcontractors and engineers involved in the project. The shoring design section includes specific instructions that if no shoring is required, bidders should write "NONE", and if shoring is necessary, the Civil or Structural Engineer responsible for the design must be listed, even if they are employed directly by the contractor. This document serves as a transparency mechanism to ensure the fire department has complete visibility into the project's supporting team and potential specialized technical resources.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .