Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
Gold-Leaf Lettering for Fire Apparatus
Solicitation number
2024-IFB-LM-0214
Issued by
Los Angeles County, Berkeley City, California

About this file

The document is a Subcontractor Listing/Shoring Design form related to the Pasadena Fire Department's contract opportunity for gold-leaf lettering services for fire apparatus. The form provides blank tables for listing subcontractors and potential shoring design engineers, with specific instructions that if shoring is required for the project, the Civil or Structural Engineer responsible for the design must be listed, even if they are employed by the contractor. If no shoring is needed, the form instructs the bidder to write "NONE".

While the form itself does not contain specific pricing, subcontractor details, or contract specifics, it is a standard procurement document designed to capture critical information about potential subcontractors and engineering support for the gold-leaf lettering project. The form appears to be part of the bidding documentation for the Pasadena Fire Department's request for gold-leafing and pinstriping services, which involves detailed work on fire trucks, engines, and rescue vehicles using 23 carat gold leaf, including processes like masking, sanding, and removal of existing gold leaf.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .