Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
Baseball Field Netting
Solicitation number
2024-IFB-LM-0595
Issued by
Los Angeles County, California

About this file

The document is a Subcontractor Listing form for a project related to baseball field netting, prepared for the Department of Parks, Recreation and Community Services - Parks Division in California. The form provides space for contractors to list subcontractors and potentially a shoring design engineer, with specific instructions to detail the name, address, and description of work for each subcontractor or engineer involved in the project. The form includes two main sections: a Subcontractor Listing and a Shoring Design section, with guidance to write "NONE" if no shoring is required.

The form appears to be a standard procurement document that allows prime contractors to transparently disclose their subcontractor and engineering support for the baseball field netting extension project. While the form itself does not contain specific pricing or detailed project information, it is designed to ensure comprehensive documentation of the project team and support professional accountability in the contract bidding and execution process. The form aligns with the project overview of extending existing field netting 20' vertically from the top of the post, with a contract period from August 1, 2024 to June 30, 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .