Subcontractor_Listing.pdf
PDF 224 KB Posted
- Attached to
- Shop Hoist and Equipment Inspection, Certification, Parts, Preventative Maintenance and Repair Services
- Solicitation number
- 2026-IFB-LM-0433
- Issued by
- Los Angeles County, Berkeley City, California
About this file
This is a Subcontractor Listing form for the City of Pasadena Public Works Department, Building Systems and Fleet Management Division, related to a contract for shop hoist and equipment inspection, certification, preventative maintenance, and repair services. The form is designed to document subcontractors and shoring design engineers that may be utilized on the project. The document provides template fields for listing up to seven subcontractors with their names, addresses, and descriptions of work, as well as up to six civil or structural engineers responsible for shoring design, if shoring is required as part of the project. If no shoring is required, bidders are instructed to indicate "NONE" in the applicable section. The form appears to be a standard bidding requirement used to ensure transparency regarding all parties involved in the delivery of fleet maintenance support services.
No specific pricing terms, set-asides, incumbents, funding amounts, or contract timeline information is provided within this particular document. The subcontractor listing form serves as a compliance and documentation tool rather than a substantive contract specification or pricing document. Bidders responding to the City of Pasadena's shop equipment inspection and maintenance services opportunity would be required to complete this form as part of their bid submission to identify any subcontractors or specialized engineers they intend to engage.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .