Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
CHLORINE EQUIPMENT PARTS, SERVICE AND REPAIRS
Solicitation number
2025-IFB-LM-0497
Issued by
Los Angeles County, Berkeley City, California

About this file

This document is a blank Subcontractor Listing/Shoring Design form designed for a construction project. The form requires contractors to list subcontractors and provide details about potential shoring design requirements. The document contains two main sections: a Subcontractor Listing section and a Shoring Design section, each with columns for Names, Address, and Description of Work.

The form instructs contractors to list all subcontractors involved in the project in the first section, providing their names, addresses, and the specific work they will perform. In the Shoring Design section, contractors must identify the Civil or Structural Engineer responsible for shoring design, even if the engineer is employed directly by the contractor. If no shoring is required for the project, the contractor is instructed to write "NONE" in this section. The form appears to be a standard template used to capture critical information about project participants and potential engineering requirements.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .