Subcontractor_Listing.pdf
PDF 224 KB Posted
- Attached to
- CHLORINE EQUIPMENT PARTS, SERVICE AND REPAIRS
- Solicitation number
- 2025-IFB-LM-0497
- Issued by
- Los Angeles County, Berkeley City, California
About this file
This document is a blank Subcontractor Listing/Shoring Design form designed for contractors to detail potential subcontractors and engineering requirements for a construction project. The form provides structured sections for listing subcontractors, their addresses, and descriptions of work, as well as a specific section for documenting shoring design requirements. The form explicitly instructs contractors that if shoring is required for the project, the Civil or Structural Engineer responsible for the shoring design must be listed, even if the engineer is employed directly by the contractor. If no shoring is needed, the form indicates that "NONE" should be written.
The form appears to be a standard procurement document that allows for comprehensive documentation of project team members and specialized engineering needs. By requiring detailed information about subcontractors and potential shoring design requirements, the form enables thorough vetting and transparency in the project planning and execution stages. The blank template suggests that specific project details, subcontractors, and engineering requirements will be filled in by the responding contractor, making it a flexible tool for capturing critical project team information.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .