Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
Weed & Brush Clearance
Solicitation number
2025-IFB-LM-0006
Issued by
Los Angeles County, California

About this file

The document is a Subcontractor Listing/Shoring Design form for the City of Pasadena's Weed & Brush Clearance contract opportunity in California. The form provides blank spaces for contractors to list subcontractors and, if applicable, engineers responsible for shoring design. The form requires detailed information including names, addresses, and descriptions of work for both subcontractors and potential shoring design engineers.

The form is specifically designed to capture comprehensive information about potential subcontractors and engineering support for a weed and brush clearance project. If no shoring is required for the project, contractors are instructed to write "NONE" in the shoring design section. This document appears to be a standard procurement requirement that allows the City of Pasadena to have a clear understanding of the project team and potential specialized engineering support needed for the vegetation management contract.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .