Subcontractor_Listing.pdf
PDF 224 KB Posted
- Attached to
- Villa Substation Oil Containment
- Solicitation number
- 2022-IFB-LM-224
- Issued by
- Los Angeles County, California
About this file
The document is a Subcontractor Listing form for the Villa Substation Oil Containment project in California, designed to be completed by the contractor. The form provides designated spaces for listing subcontractors and, if applicable, the Civil or Structural Engineer responsible for shoring design. The form requires contractors to detail the names, addresses, and descriptions of work for subcontractors and any engineers involved in shoring design, with a specific instruction to write "NONE" if no shoring is required.
The form is part of a federal environmental compliance project aimed at bringing the Villa Substation, originally constructed in 1978, up to current Environmental Protection Agency regulations under Title 40 CFR Part 112 for Oil Pollution Prevention. The project involves constructing an oil containment system to prevent potential mineral oil spills from transformers and electrical equipment affecting the surrounding environment. The construction scope includes sawcutting, concrete removal, excavation, backfill, soil compaction, installation of reinforced concrete structures, trenches, and pipes, as well as associated safety measures, demolition, and cleanup work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .