Subcontracting Percentage Worksheet.pdf
PDF 17 KB Posted
- Attached to
- NCR-NAMA: TRANSFER STATION Federal contract opportunity
- Solicitation number
- 140P3020R0029
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P3020R0029_Amd_0002.pdf | ||
| Sol_140P3020R0029_Amd_0001.pdf | ||
| Sol_140P3020R0029.pdf | ||
| B03 SCA Wage Determination.txt | TXT text file | |
| A04 Statement of Work.docx | DOCX document | |
| B12 Bid Sheet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior
FAR Clause 52.219-14, Limitations of Subcontracting
Subcontracting Percentage Worksheet
PRIME CONTRACTOR:
SUBCONTRACTOR:
SOURCE:
SOURCE:
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure jn (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE= %
* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
** G&A denotes General and Administrative Costs
*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $ $
FRINGE BENEFITS* $ $
SUB TOTAL (A)$ (B) $
LABOR G&A** @ % $ $
TOTAL LABOR COSTS (C) $ (D) $
| U.S. Department of the Interior |
| Subcontracting Percentage Worksheet |
File details come from the government source that posted it. Updated .