This is a Request for Qualifications (RFQ) issued by the City of Phoenix, Arizona, Office of the City Engineer, seeking a qualified engineering consultant team to provide design and construction administration and inspection services for the Sub-Regional Operating Group's 91st Avenue Wastewater Treatment Plant Aeration Rehabilitation project. The project is located at 5615 S 91st Avenue, Tolleson, Arizona, and involves the rehabilitation or replacement of facilities and equipment providing process air to the treatment systems, including blower buildings, ancillary support systems, blowers, motors, piping, valves, and instrumentation and control systems. Services requested include engineering analyses, design, permitting, programming, construction administration, and inspection services. A pre-submittal meeting is scheduled for 11:00 a.m. Phoenix time on Monday, October 5, 2026, at Phoenix City Hall or via Microsoft Teams. Statements of Qualifications must be submitted electronically in PDF format through the City's Procurement Portal by 12:00 p.m. Phoenix time on Friday, October 16, 2026, with a maximum of 12 pages permitted. Selection notification is anticipated for early November 2026, with a scope meeting scheduled for mid-November 2026. The project is anticipated to occur over multiple fiscal years with multiple construction, equipment procurement, and equipment installation packages.
The RFQ uses a qualifications-based selection process with evaluation criteria totaling 1,021 points, including design experience of the prime firm (125 points), construction administration and inspection experience of the prime firm (125 points), design experience of key personnel and subconsultants (125 points), construction administration and inspection experience of key personnel and subconsultants (125 points), project understanding and approach (350 points), staffing information for key personnel (150 points), and reference checks (21 points). Firms must register as vendors in the City's Vendor Management System prior to submission and include their vendor number on the cover of the SOQ. The City expects to select at least three but not more than five teams for this project and will enter into negotiations with the selected team regarding fees and contract terms for City Council approval. No formal interviews will be conducted, and the City reserves the right to reject any or all statements of qualifications. Proposers are prohibited from direct contact with City employees involved in the selection process and must adhere to the Contact with City Employees policy, with violation resulting in disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONSULTANT_REFERENCE_CHECK.docx | DOCX document | |
| SUBCONTRACTOR_SELECTION_PLAN.pdf | ||
| DESIGN-BUILD_TEAM_REFERENCE_CHECK_INSTRUCTIONS,_FORM,_AND_SAMPLE_LETTER.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF PHOENIX, ARIZONA
OFFICE OF THE CITY ENGINEER
DESIGN AND CONSTRUCTION PROCUREMENT
REQUEST FOR QUALIFICATIONS
SUB-REGIONAL OPERATING GROUP - 91ST AVENUE WASTEWATER
TREATMENT PLANT AERATION REHABILITATION - ENGINEERING
SERVICES
OPENGOV ID NO. WS90100120
RFQ Rev. 1/25 Page | 2
The City of Phoenix is seeking a qualified consultant team to provide Engineering services for the
Sub-Regional Operating Group 91st Avenue Wastewater Treatment Plant Aeration Rehabilitation
Design. Services may include engineering analyses, design, permitting, programming, and possible construction administration and inspection services. The project site is located at 5615
S 91st Avenue, Tolleson, AZ 85353.
Project Description
The 91st Avenue Wastewater Treatment Plant (WWTP) is located on a 560-acre site just east of
91st Avenue, south of Broadway Road and north of Southern Avenue. The plant is owned by the
Sub-Regional Operating Group (SROG) and operated by the City of Phoenix. The facility has the capacity to treat 230 million gallons per day. Portions of the facility were built in the early 1960’s, and the facility has been expanded and modified since then. The facility treats the wastewater with various processes consisting of:
• Screening
• Grit removal
• Primary sedimentation
• Activated sludge with nitrification-denitrification
• Secondary sedimentation
• Disinfection by chlorine
• Dechlorination (sodium bisulfite)
Both, primary and secondary, solids are thickened using centrifuges in the Solids Thickening
Facility prior to digestion in sixteen anaerobic digesters. Digested sludge is dewatered using centrifuges in the Solids Handling Facility and then hauled off-site for land application.
There are multiple aeration basins on site, fed by process air from five blower buildings. Plants 1, 2, and 3 are fed by three blower buildings connected to a common air header. Unified Plants 01 and 05 are fed by a dedicated blower building, as is the Centrate Treatment Facility.
The City intends to engage the services of an engineering consultant team to provide design and construction administration and inspection services for the rehabilitation of the facilities and equipment used to provide air to the treatment process. This project will include the rehabilitation or replacement of facilities and equipment associated with providing process air, including, but not limited to:
• Blower buildings o Roofs, drains, HVAC systems, bridge cranes, doors, and roll up doors;
o Structural columns, beams, and system structural supports;
o Electrical, instrumentation, and control systems including conduit and wire;
o Motor control centers; and o Variable frequency drives.
Page | 3
• Ancillary support systems o Air intake plenums;
o Bag houses;
o Filters;
o Blower cooling systems; and o Air compressors.
• Blowers o Motors;
o Piping;
o Guide vanes;
o Valves;
o Programming; and o Instrumentation and controls.
It is anticipated the design and construction necessary to complete the project scope will occur over multiple fiscal years with multiple construction, equipment procurement and equipment installation packages being required.
Scope of Work
Based on the 91st Avenue WWTP Facility Assessment, assessment updates, and previously completed work, the selected engineering consultant will review and prioritize the project scope items and make recommendations for the rehabilitation and replacement of equipment, facilities, and systems necessary to meet the project goals.
Design services by the engineering consultant may include, but are not limited to, the following:
• In conjunction with City Engineering, Plant Operations and Maintenance staff, and the selected Construction Manager at Risk (CMAR), the Engineering consultant will:
o Conduct field review(s) of the equipment, facilities and systems identified in previous process air facility assessment to identify, catalog, and prioritize the assets to be rehabilitated or replaced;
▪ Perform assessment site visits to the 91st Avenue WWTP. The intent of assessment site visits is for the engineering firm and City personnel, including engineering, and operations and maintenance staff, to jointly observe, discuss, and assess existing conditions of plant air process facilities and equipment, and identify needs for repair or replacement, along with equipment preferences. The evaluation is intended to confirm baseline needs for repair or replacement of equipment and associated items to be included in the preliminary design.
Page | 4 o Identify the scope, level and detail of construction drawings necessary to accomplish the project objectives. It is anticipated the replacement of most assets may require minimal construction drawings. At a minimum, only structural, electrical or control work requiring permitting will require construction drawings;
o Develop an initial schedule for the rehabilitation and replacement of the assets.
Schedule shall be prioritized based on the results of the field review(s), shall include and be cognizant of plant operations and maintenance schedules, and incorporate input from the CMAR regarding need for detailed design packages, equipment procurement schedules, and construction timeframes; and o Perform necessary engineering and life-cycle cost analyses to provide recommendations for replacement equipment.
• Compile existing record drawings of the process air facilities and conduct field surveys as required to provide accurate base drawings for those tasks requiring construction drawings;
• Develop a complete set of contract documents including construction drawings and specifications adhering to current City standards, regulatory guidelines, and requirements;
• Attend regular meetings with the project team to discuss, coordinate, and review the work progress and budget, resolve design issues, and document meeting minutes;
• Obtain all required permits for the construction and operation of the modifications;
• Provide all required services as necessary to implement alternative design reviews, constructability reviews, and quality control reviews that may be performed by the CMAR;
• Provide design services including agency coordination, preparation of preliminary, pre-final and final plans, consultation regarding the CMAR models and final cost proposal, and assistance in the bid evaluation and recommendation of contract award;
• Provide design services including agency coordination, and preparation of preliminary, pre-final and final contract documents;
• Provide consultation regarding the CMAR cost models and final Guaranteed Maximum
Price (GMP) proposal review, and prepare recommendation of contract award;
• Review and provide recommendations on value-engineering proposals developed by the
CMAR;
• In conjunction with City engineering, plant operations and maintenance staff, the Water
Asset Management (WAM) Core Team and the selected CMAR, the engineering firm will coordinate the updating of the WAM system and database and ensure the completeness and accuracy of information provided to the WAM system;
Page | 5
• In conjunction with City engineering, and plant operations and maintenance staff, the engineering firm will provide necessary programming services to update and modify the facility’s computer control and information systems as a result of work within this project;
and
• In conjunction with City engineering, plant operations and maintenance staff, and the selected CMAR, assist with the development of necessary maintenance of plant operations plans in order to avoid disruption of the treatment process.
Construction administration and inspection (CA&I) services by the engineering firm may include, but are not limited to, the following:
• Conduct pre-construction conference and hold subsequent meetings, as necessary, with the project team;
• Perform on-site examination of materials, equipment, and workmanship as necessary during construction;
• Keep the City informed of the progress of the work, guard the City against defects and deficiencies in such work, and disapprove or reject work failing to conform to the contract documents;
• Provide quality control services during the course of construction to ensure the overall technical correctness, of the construction phase services, is being followed, and the construction schedule is being met;
• Arrange and coordinate special inspections for structural, mechanical, and electrical work, as required;
• In conjunction with City engineering, plant operations and maintenance staff, and the selected CMAR, the engineering firm will coordinate the tagging of rehabilitated or replaced assets and, with the WAM Core Team, will update the WAM system and database and ensure the completeness and accuracy of information provided to the WAM system;
• In conjunction with City engineering, and plant operations and maintenance staff, the engineering firm will provide necessary programming services to implement updates and modifications to the facility’s computer control and information systems as a result of work within this project;
• In conjunction with City engineering, plant operations and maintenance staff, and the selected CMAR, assist with the execution of necessary maintenance of plant operations plans in order to avoid disruption of the treatment process;
• Review operations and maintenance manuals for completeness and adherence to City standards and requirements;
• Provide start-up assistance and training services;
Page | 6
• Prepare and review project documents (e.g. correspondence, schedules, submittals, shop drawings, test data, project data, contractor progress payments, change orders, etc.);
• Conduct a substantial and final completion inspection; and
• Prepare and provide all project closeout documents as required by the contract documents, including, but not limited to, Record Document and Record Drawings.
Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project Manager.
• The Consultant will be required to maintain all project records in electronic format.
• The City provides an ASP web-based project management database which the Consultant will be required to utilize in the fulfillment of the contract requirements.
• The Consultant shall provide a computerized networked office platform with broadband internet connectivity.
• UNIFIER training will be provided through the City of Phoenix to firms under contract.
Pre-Submittal Meeting
A pre-submittal meeting will be held at 11:00 am, Phoenix time on Monday, October 5, 2026, at
Phoenix City Hall, 200 W Washington St., 9th Floor Training Room AND via Teams. At this meeting, City staff will discuss the scope of work, general project requirements, and respond to questions from the attendees. It is strongly recommended that interested firms attend the pre-submittal meeting. Inquiries regarding the project scope outside of this pre-submittal meeting must be directed to the Contracts Specialist.
Pre-Submittal Meeting Teams Information:
Join: https://teams.microsoft.com/meet/22847293705774?p=iwa4403veNRgveonp1
Meeting ID: 228 472 937 057 74
Passcode: Xg7dX35E
Statement of Qualifications Evaluation Criteria
A firm will be selected through a qualifications-based selection process based on the criteria below. Subcriteria are listed in order of importance in relation to project services. City of Phoenix project experience is not required.
No. Evaluation Criteria Scoring Method Weight (Points) https://teams.microsoft.com/meet/22847293705774?p=iwa4403veNRgveonp1
Page | 7
1. Design Experience of the Prime Firm
Describe the experience and qualifications of the prime firm in providing design services for similar projects. Identify projects the submitting firm has completed.
For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the firm and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Points Based 125 (12.2% of Total)
2. Construction Administration and
Inspection Experience of the Prime Firm
Describe the experience and qualifications of the prime firm in providing construction administration and inspection (CA&I) services for similar projects. Identify projects the submitting firm has completed.
Include assigned CA&I personnel if different from personnel performing design services. For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the firm and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Points Based 125 (12.2% of Total)
Page | 8
3. Design Experience of the Key Personnel and Subconsultants
Describe the experience and qualifications of the specific project team expected to be assigned to this project in providing design services for similar projects. For each key person identified, list their length of time with the firm. List each key person’s role in the projects provided. If a project selected for a key person is the same as one selected for the firm, provide just the project name and the role of the key person. For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the team or team member and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Page | 9
4. Construction Administration and
Inspection Experience of Key Personnel and Subconsultants
Describe the experience and qualifications of the project team, expected to be assigned to this project, in providing construction administration and inspection services for similar projects. For each key person identified, list their length of time with the firm. List each key person’s role in the projects provided. If a project selected for a key person is the same as one selected for the firm, provide just the project name and the role of the key person. Include assigned Construction
Administration and Inspection personnel if different from personnel performing design services. For each project listed, provide:
A. Description of the project including scope and project owner
B. Role of the team or team member and explain how this relates to the services being solicited
C. Project’s original contract value, final contract value, and reason for variance
D. Project’s start date and completion date
Page | 10
5. Project Understanding and Approach
Describe your firm’s understanding of this project. Discuss important considerations such as project issues and challenges the team has identified. Describe the team’s approach to accomplishing the project, including how the team intends to address the issues and challenges previously identified. Describe the team’s project management approach and its organization during design and construction. Describe systems the team will use for managing the planning, scheduling, and implementation of multiple design, construction, equipment procurement and equipment installation packages. Describe how the team will develop cost estimates and how the team will maintain budget.
Briefly describe the firm’s experience and systems for ensuring quality control, resolution of disputes, and safety management.
Points Based 350 (34.3% of Total)
6. Staffing Information for Key Personnel
Provide the following:
A. Team’s availability and commitment to the project, including subconsultants.
B. Team’s plan to maintain continuity of the proposed services, including processes for managing turnover of key staff members.
C. Organization chart showing key personnel, current professional licenses or certifications, and assigned roles for both Design and
Construction Administration and
Inspection Services for the project.
D. Identify the location of the lead firm’s principal office and the home office location of key staff on this project.
Points Based 150 (14.7% of Total)
Page | 11
7. Reference Checks
Use the form provided in the Attachments section to obtain at least three references.
It is preferred no more than one be a City of Phoenix project. If your firm has not completed prior projects with other agencies, you will not be penalized. It is recommended there be references outside the City of Phoenix.
*These points are in addition to the 1,000 points for the SOQ.
Points Based 21 (2.1% of Total)
Submittal Requirements
Electronic Submittal Process: Firms interested in this project must submit a Statement of
Qualifications (SOQ) electronically through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix.
Submittal requirements are as follows:
Vendor Information: All firms must be registered in the City’s Vendor Management System prior to submitting a proposal. The vendor number should be included on the cover of the
SOQ. Information on how to register with the City is available at:
https://www.phoenix.gov/financesite/Pages/EProc-help.aspx
If your firm is already registered with the City of Phoenix’s Procurement system, please visit https://procurement.opengov.com/portal/phoenix to login and access the electronic solicitation.
Submittals:
• Submit only one SOQ electronically, in .PDF format only, addressing all evaluation criteria. No hard copies will be accepted.
• Clearly display the firm legal name, vendor number, project title, and project number on the cover of the SOQ.
• A maximum of 12 pages is permitted to address all content in the SOQ submittal. (Maximum page limit includes evaluation criteria and all additional content. It does not include information sheet.)
• Submit electronically the Statement of Qualifications by 12:00 pm, Phoenix time, on
Friday, October 16, 2026.
• Page size must meet requirements of 8½” x 11”.
• Font size must not be less than 10 point.
• Content count:
https://procurement.opengov.com/portal/phoenix https://www.phoenix.gov/financesite/Pages/EProc-help.aspx https://procurement.opengov.com/portal/phoenix
Page | 12 o Each side of a page containing evaluation criteria and additional content will be counted toward the maximum page limit noted above.
o Pages that have project photos, charts and/or graphs will be counted towards the maximum page limit noted above.
o Front and back covers, information sheet, Table of Contents pages, and divider (tab) pages will NOT be counted toward the maximum page limit noted above, unless they include evaluation criteria and additional content that could be considered by the selection panel.
Information Sheet: Provide an information sheet that includes project title, OpenGov ID number, legal firm name (not a trade name), address, phone number, vendor number, and the name, title, email address and signature of your contact person for the project. Do not include any additional information.
Evaluation Criteria: Address the SOQ evaluation criteria.
Note: All pages exceeding the specified maximum page limit will be removed from the submittal and not considered in evaluating a submitted SOQ.
Grounds for Disqualification
Please be advised that the following will be grounds for disqualification, and will be strictly enforced:
• Submitting a Statement of Qualifications for a different project.
• Violating the “Contact with City Employees” policy contained in this RFQ.
Selection Process and Schedule
Interested teams will submit a Statement of Qualifications (SOQ). The team will be selected through a qualifications-based selection process. A Selection Panel will evaluate each SOQ per the criteria set forth in Section 5 above.
The City will select a team based on the SOQs received; no formal interviews will be conducted.
The City may conduct a due diligence review on the team receiving the highest evaluation.
The City expects to create a final list of at least three, but not more than five teams for this project.
The City will enter into negotiations with the selected team and execute a contract upon completion of negotiation of fees and contract terms for City Council approval.
The following tentative schedule has been prepared for this project.
Pre-submittal Meeting 11:00 am on Monday, October 5, SOQs Due 12:00 pm on Friday, October 16, Page | 13
Selection Notification Early November 2026
Scope Meeting Mid November 2026
If the City is unsuccessful in negotiating a contract with the best-qualified team, the City may then negotiate with the next most qualified team until a contract is executed, or the City may decide to terminate the selection process. Once a contract is executed with the successful firm, the procurement is complete.
The firm selected for this project will be notified directly by the City. Notification to all other firms on the status of a short list for this project will be posted on the City of Phoenix’s Procurement
Portal:
https://procurement.opengov.com/portal/phoenix
General Information
Citywide Capital Improvement Projects. Consulting and contractor services supporting the
City’s Capital Improvement Projects are procured under the authority of the City Engineer, currently located within the Street Transportation Department. Design and Construction
Procurement coordinates the citywide consulting and construction contracting procurement processes.
Changes to Request for Qualifications. Any changes to this Request for Qualifications
(RFQ) will be in the form of a Notification. The City of Phoenix shall not be held responsible for any oral instructions. Notifications are available on both the Current Opportunities and City's eProcurement Portal at https://procurement.opengov.com/portal/phoenix.
It shall be the responsibility of the registered RFQ holder to determine, prior to the submittal of the Statement of Qualifications, if a Notification has been issued. Registered
RFQ holders may refer to the web page or call the Contracts Specialist (listed below) to ascertain if a Notification has been issued for this project.
Alternate Format. For more information or a copy of this publication in an alternate format, contact the Contracts Specialist (listed below) - Voice or TTY 711. Requests will only be honored if made within the first week of the advertising period.
Release of Project Information/Public Records Request. The City shall provide the release of all public information concerning the project, including selection announcements and contract awards. Those desiring to release information to the public must receive prior written approval from the City. To submit a Public Records Request, visit phoenix.gov/prr.
City Rights. The City of Phoenix reserves the right to reject any or all Statements of
Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received.
Contact with City Employees. This policy is intended to create a level playing field for all
Proposers, assure that contracts are awarded in public, and protect the integrity of the selection process. OFFERORS THAT VIOLATE THIS POLICY WILL BE DISQUALIFIED.
https://procurement.opengov.com/portal/phoenix https://procurement.opengov.com/portal/phoenix https://phoenix.gov/prr
Page | 14
Beginning on the date the RFQ is issued and until the date the contract is awarded or the RFQ withdrawn, all persons or entities that respond to the RFQ, including their authorized employees, agents, representatives, proposed partner(s), subcontractor(s), joint venture(s), member(s), or any of their lobbyists or attorneys (collectively the Proposer), will refrain from any direct or indirect contact with any person (other than the designated Contract Specialist) who may play a part in the selection process, including members of the evaluation panel, the City Manager, Assistant
City Manager, Deputy City Managers, Department heads, the Mayor and other members of the
Phoenix City Council. As long as the RFQ solicitation is not discussed, Proposers may continue to conduct business with the City and discuss business that is unrelated to this RFQ solicitation with City staff.
Commencing on the date and time a solicitation is published, potential or actual proposers
(including their representatives) will only discuss matters associated with the solicitation with the
Mayor, any members of City Council, the City Manager, any Deputy City Manager, or any department director directly associated with the solicitation (including in each case their assigned staff, except for the designated procurement officer) at a public meeting, posted under the Arizona
Revised Statutes, until the resulting contract(s) are awarded or all offers or responses are rejected and the solicitation is cancelled without any announcement by the procurement officer of the City’s intent to reissue the same or a similar solicitation.
Proposers may discuss their proposal or the RFQ solicitation with the Mayor or one or more members of the Phoenix City Council, provided such meetings are scheduled through the
Contract Specialist, Christopher Balderrama at (602) 495-3790 or
Christopher.Balderrama@phoenix.gov, conducted in person at 200 W. Washington, Phoenix, Arizona 85003, and are posted as open meetings with the City Clerk at least twenty-four (24) hours prior to the scheduled meetings. The City Clerk will be responsible for posting the meetings.
The posted notice shall identify the participants and the subject matter, as well as invite the public to participate.
Conflict of Interest. The City reserves the right to disqualify any Proposer on the basis of any real or apparent conflict of interest that is disclosed by the proposal submitted or any other data available to the City. This disqualification is at the sole discretion of the City. Any Proposer submitting a proposal herein waves any right to object now or at any future time, before any body or agency, including but not limited to, the City Council of the City of Phoenix or any court.
Protest Procedures. Firms responding to disqualification or a procurement outcome are referred to the Code of the City of Phoenix Chapter 2, Article XII, Section 2-187 to 2-190.4, which governs protest procedures utilized throughout the selection process. The procedures may be reviewed through the City of Phoenix website at:
http://www.codepublishing.com/az/phoenix/
A copy of the Protest Policy is also available online at:
https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html
Questions - Questions pertaining to this selection process or contract issues should be submitted via the Procurement Portal.
Vendor Questionnaire http://www.codepublishing.com/az/phoenix/ https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html
Page | 15
*Response required
| REQUEST FOR QUALIFICATIONS |
| Project Description |
| Scope of Work |
| Pre-Submittal Meeting |
| Statement of Qualifications Evaluation Criteria |
| Submittal Requirements |
| Grounds for Disqualification |
| Selection Process and Schedule |
| General Information |
| Vendor Questionnaire |
File details come from the government source that posted it. Updated .