About this file

This is a sealed bid advertisement for a street paving project issued by the City of LaFayette Public Works Department, located in LaFayette, Georgia. The project encompasses patching, asphalt overlay with tack coat application, leveling, and striping work across seven roads: Pledger Street, Hillsdale Road, Johnson Street, Trails Lake, Anthony Street, Duke Street, and Foster Boulevard. Work includes variable depth milling ranging from 0" to 3", application of 19mm binder base and 9.5mm Superpave asphalt overlay, and striping in yellow and white per Georgia Department of Transportation specifications. Additional line items include thermoplastic stop bars, railroad crossings, pedestrian crossings, and arrows. Sealed bids must be submitted to the Office of the City Manager by 3:00 p.m. EST on April 13, 2026, with project completion required by September 1, 2026. The successful bidder must warrant all paving work for one year following completion. Questions must be submitted in writing to the Director of Public Works by March 23, 2026, with any addenda posted to the Georgia Procurement Registry on March 24, 2026. Bidders must be prequalified with the Georgia Department of Transportation in appropriate work classifications as required by GDOT LMIG guidelines.

The contract will be awarded on a unit price basis to the lowest responsive and responsible bidder, with total compensation determined by actual quantities of work performed. A bid bond equal to 5% of the base bid is required, along with both a performance bond and a payment bond each equal to 100% of the contract price. Bids may not be withdrawn for 60 days following bid opening. The successful bidder must comply with O.C.G.A. 13-10-91 requirements and provide a contractor affidavit and E-Verify information prior to contract execution. The City of LaFayette reserves the right to reject any or all bids and waive technicalities and informalities. As an Equal Opportunity Employer, the City does not discriminate based on race, color, national origin, sex, religion, age, or disability.

View the file

Other files

File Type Posted
ADDENDUM NO_ 1 _PAVING PROJECT 2026 .docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of LaFayette

Public Works Department 2776 HWY 27 By-Pass P.O. Box 89 LaFayette, Ga. 30728 Phone: 706-639-1523 FAX: 706-638-1237 Superintendent: Rodney Parker

ADVERTISEMENT FOR BIDS - NOTICE TO CONTRACTORS

Sealed bids for all labor, materials and services necessary for the City of LaFayette 2026 Street Paving project will be received by the City of LaFayette at the Office of Mr. David Hamilton, City Manager, City of LaFayette, 207 South Duke Street LaFayette, Georgia 30728 until 3:00 p.m. (EST), April 13th, 2026, at which time bidding will be closed. Bids will be opened and read aloud at the time and place stated above.

Bids shall be clearly marked “Sealed Bid Paving Project 2026”.

Project completion date of September 1, 2026.

The successful bidder will also be responsible for warranting the paving work for one year after completion.

A map of the Streets can be viewed in the Office of Public Works, 2776 South Highway 27 Bypass, LaFayette, Georgia 30728.

Any questions concerning the Project shall be submitted in writing by email to Rodney Parker, Director of Public Works, at rparker@lafga.org, no later than March 23, 2026. Bidders shall not contact the City Manager, Mayor, Council Members, or any other City employee, official, or agent regarding this solicitation except as expressly authorized in this paragraph. An addendum, if necessary, will be issued in writing and posted on the Georgia Procurement Registry on March 24, 2026. Failure to comply with the communication requirements set forth herein may result in disqualification of the bidder.

The Contract, if awarded, will be a unit price contract based upon the unit prices submitted by the successful bidder, with total compensation determined by the actual quantities of work performed and accepted by the City. No Bid may be withdrawn for a period of 60 days after Bid opening, except as otherwise expressly provided by applicable law. Bids must be accompanied by a Bid Bond in the amount of 5% of the Base Bid. Both a Performance Bond and a Payment Bond will be required in an amount equal to 100% of the Contract Price. The Contract will be awarded to the lowest responsive and responsible bidder whose bid complies with the requirements set forth herein.

The successful bidder shall comply with O.C.G.A. § 13-10-91 and shall provide the required contractor affidavit and E-Verify information prior to execution of the Contract. Failure to provide such documentation shall result in disqualification.

Bidders must be prequalified with the Georgia Department of Transportation in the appropriate work classifications for the work contemplated by this Project, if required under GDOT LMIG guidelines.

The City of LaFayette reserves the right to reject any or all bids, and to waive technicalities and informalities.

Scope of Work:

Patching, asphalt overlay with tack coat, leveling and striping according to this proposal form page of roads specified in the Terms and Conditions.

The unit prices listed below cover the cost of work and materials in place, including all materials, equipment, labor (including signage and traffic control), taxes, supervision, layout, overhead and profit, maintenance and guarantee to render the same complete. BELOW IS A UNIT PRICE BID TEMPLATE FORM.

All areas to be milled will be marked by the City of LaFayette two weeks prior to work beginning.

The City of LaFayette is an Equal Opportunity Employer and does not discriminate on the basis of race, color, national origin, sex, religion, age, or disability.

No.
Item
Unit
Unit Price
1
· 9.5mm Superpave Asphalt (Group 1 -Limestone)
TN
$

· Laid at 220 lbs. per square yard

· Tack coat put down before each layer of asphalt at the rate of .05 gallons per square yard

2
19mm Binder Base, 2” to 3” compacted
TN
$
3
19mm Deep Mill Patch 3” to 6” (including removal and replacement)
TN
$
4
0” TO 3” Variable Depth and Profile milling (full width and length)
SY
$
5
5” yellow striping (per GDOT Section 652 specifications)
LM
$
6
5” white striping (per GDOT Section 652 specifications)
LM
$
7
24” Thermoplastic stop bar per each
EA
$
8
Railroad crossing per each
EA
$
9
Pedestrian crossing per each
EA
$
10
Arrows per each
EA
$

Optional Upgrades:

11(in place of 5)
Arrows per each
EA
$
12 (in place of 6)
Arrows per each
EA
$

(GA= Gallon, LM =Linear Mile, EA=EACH, TN=Ton, SY= Square Yard)

Roads
Length
Width
Variable Depth & Profile Milling 0" to 3"
Striping
19mm Base Binder Overlay
9.5 mm Leveling
9.5mm Overlay
Pledger St.
0.47
23'
1.5" Whole Rd.
Center line
2"
.5"
1.5"
Hillsdale Rd.
1.03
22'
3" Whole Rd.
3"
.5"
1.5"
Johnson St.
0.22
20'
2" Whole Rd.
2"
.5"
1.5"
Trails Lake
0.21
21'
.5"
1.5"
Anthony St.
0.16
20'
2" Whole Rd.
2"
.5"
1.5"
Duke St.
1.52
28'
3" Whole Rd.
Center & Fog
2"
.5"
1.5"
Foster Blvd.
0.31
22'
2" Whole Rd.
Center & Fog
2"
.5"
1.5"

THIS PROPOSAL SHALL REMAIN EFFECTIVE FOR ____________________DAYS.

COMPANY NAME: __________________________________________________________

ADDRESS: ________________________________________________________________

CONTACT: _________________________________________________________________

CELL: ____________________________ EMAIL: _________________________________

image1.jpg

File details come from the government source that posted it. Updated .