STORM WATER POLLUTION PREVENTION PLAN PART 2 ARFQ DEP25-9 KEMPTON REFUSE REHABILITATION.pdf
PDF 24 MB Posted
- Attached to
- AML-Kempton Refuse Rehabilitation
- Solicitation number
- ARFQ-0313-DEP2500000009-5
- Issued by
- Raleigh County, West Virginia
About this file
This document is a Storm Water Pollution Prevention Plan (SWPPP) for the Kempton Refuse Rehabilitation project, which is a state and local contract opportunity issued by the West Virginia Department of Environmental Protection (DEP) under ARFQ DEP25-9.
The SWPPP outlines the procedures and requirements for managing storm water runoff and preventing pollution during the rehabilitation of the Kempton Refuse site. The project overview describes the need to provide grading, seeding, and other erosion and sediment control measures to stabilize the site and protect nearby water bodies. The SWPPP specifies the required erosion and sediment control practices, monitoring and inspection protocols, and procedures for managing and disposing of waste materials. No specific bid response dates, award information, or contract term details are provided in this SWPPP document.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix C.4
Erosion and Sediment Control Site Map g ggg g g g g g g g g g g g g g g g g
C
C
M
EXISTING SEEP AREA E
EXISTING FAILED REFORESTATION AREA
(4.75 ACRES)
THIS AREA WILL BE UTILIZED FOR THE PLACEMENT OF
EXCESS NON-TOPSOIL MATERIAL, EXCESS REFUSE
MATERIAL AND TOPSOIL IMPORT MATERIAL.
NON-TOPSOIL EXCESS MATERIAL AND EXCESS REFUSE
MATERIAL WILL BE USED TO GRADE/LEVEL NEEDED
AREAS PRIOR TO THE TOPSOIL IMPORT MATERIAL
PLACEMENT.
TOPSOIL IMPORT MATERIAL WILL THEN BE PLACED AS
A CAP, A MIN. OF 6 INCHES IN DEPTH. THIS AREA WILL
BE SEEDED UTILIZING THE POLLINATOR ADMIXTURE.
PLEASE SEE SECTION 6.2.3.4 OF THE SPECIFICATIONS.
TOPSOIL VOLUMES (6" COVER)
SLIP AREA TOPSOIL MATERIAL: 200CY
OFFSITE TOPSOIL IMPORT: 3,800CY
EXCESS MATERIAL (NON TOPSOIL/REFUSE) VOLUMES
TREATMENT SYSTEM EXCESS MATERIAL: 3,300CY
LIMESTONE DISPOSAL AREA EXCESS MATERIAL: 200CY
OTHER EXCESS MATERIAL: 500CY
EXISTING FAILED
REFORESTATION AREA
(4.75 ACRES)
2+00
2+50
3+00
3+50
4+004+50
5+00
5+50
6+00
6+50
8+00
8+50
8+78.44
0+00
0+95.27
INSTALL SPLASH PAD (TYP)
PLEASE SEE SHEET 26 FOR DETAILS
040' 40' 80'
PLAN LEGEND
EXISTING ROAD EDGE
PROPOSED CONTOURS
EXISTING CONTOURS
EXISTING BORE HOLE
EXISTING FENCE LINE
EXISTING PIPE
TM.
P.
0 TAX MAP AND PARCEL NO.
PROPOSED FENCE LINE
EXISTING GROUTED CHANNEL
EXISTING RIPRAP CHANNEL
PROPOSED SEEP REPAIR
PROPOSED CHANNEL GROUTED OR RIPRAP
PROPOSED CHANNEL RECLAMATION
PROPOSED STABILIZED CONSTRUCTION ENTRANCE
PROPOSED SOLID PIPE
PROPOSED SEED MIX WITH POLLINATOR ADMIXTURE
PROPOSED SHALLOW WETLAND SEED MIXTURE
BSRF PROPOSED SILT FENCE
PROPOSED PERFORATED PIPE
PROPOSED SUBSIDENCE DEPRESSION REPAIR
CONTROL POINT (THRASHER)
STATION POINT (OTHERS)
PROPOSED PERMANENT ACCESS ROAD AGGREGATE
(Please See Individual Design For Stablization Type)
PROPOSED LIMESTONE BED
g g g g PROPOSED ACCESS ROAD DITCH
LIMITS OF DISTURBANCE
TREELINE
PROPOSED LIMESTONE DISPOSAL AREA
C
M
EXISTING CLEANOUT
EXISTING MANHOLE
PROPOSED GROUT KEY
PROPOSED TEMPORARY STOCKPILE
0.25 AC
PROPOSED VEGETATED ACCESS ROAD
STONE CHECK DAM
Horizontal Datum: NAD83 WV State Planes, North Zone, US Foot Vertical Datum: NAVD88 Geiod 12
GENERAL NOTES:
1. AS SHOWN ON THIS SHEET AND ALL SUBSEQUENT
PLAN SHEETS, PROPERTY LINE AND ROAD NUMBER
INFORMATION REPRESENTS AN APPROXIMATE BEST
FIT ESTIMATE OF PROPERTY LINE BOUNDARIES AS
OBTAINED FROM COUNTY TAX MAPS ACQUIRED
THROUGH WEST VIRGINIA STATE TAX DEPARTMENT
IN CHARLESTON, WV. PROPERTY LINES SET OUT AND
DESIGNATED WITHIN THESE CONSTRUCTION PLANS
DO NOT REPRESENT A TRUE AND ACCURATE
BOUNDARY SURVEY.
2. WHEN THE VEGETATED ACCESS ROADS ARE NO LONGER
IN USE, THE CONTRACTOR SHALL REGRADE, SEED AND
MULCH ANY DISTURBED AREAS.
MATCH SHEET 6 MATCH SHEET 7
EXISTING FAILED REFORESTATION AREA (4.75 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE POLLINATOR
ADMIXTURE. PLEASE SEE SECTION 6.2.3.4 OF THE
SPECIFICATIONS.
NON-TOPSOIL EXCESS MATERIAL AND EXCESS REFUSE
MATERIAL WILL BE USED TO GRADE/LEVEL NEEDED AREAS
PRIOR TO THE TOPSOIL IMPORT MATERIAL PLACEMENT.
TOPSOIL IMPORT MATERIAL WILL THEN BE PLACED AS A CAP,
6 INCHES IN DEPTH AND SEEDED AND MULCHED WITH THE
POLLINATOR SEED ADMIXTURE.
PROPOSED WETLAND AREA (0.25 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE WETLAND SEED
MIXTURE. PLEASE SEE SECTION 6.2.3.5 OF THE
SPECIFICATIONS.
ALL OTHER DISTURBED AREAS (24 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE PERMANENT SEED
MIXTURE . PLEASE SEE SECTION 6.2.3.3 OF THE
SPECIFICATIONS.
SEEDING LOCATION NOTES:
ACCESS ROAD #2
PERMANENT ACCESS ROAD CONSTRUCTION
*STATIONS 5+50 -8+78 WILL BE RECLAIMED*
PLEASE SEE SHEET 18 FOR DESIGN
TEMPORARY TOPSOIL AND
EXCESS MATERIAL LOCATION
EROSION AND SEDIMENT CONTROL INSPECTION PROCEDURES
1. INSPECTION OF ALL EROSION AND SEDIMENT CONTROL BMP'S WITHIN THE DISTURBED AREAS AT LEAST ONCE EVERY FOUR CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY PRECIPITATION EVENT GREATER THAN
0.25 INCHES PER 24 HOUR PERIOD.
2. REPAIR OR MAINTENANCE TO BMP'S SHALL BE PERFORMED WITHING 24 HOURS, HOWEVER, PERMITTEES MUST IMPLEMENT ALTERNATE BMP'S PRIOR TO STORM EVENTS WHILE AWAITING REPAIR OF THE PRIMARY
ENHANCED BMP'S.
3. TEMPORARY SEEDING AND MULCHING WITHIN 4 DAYS WHEN AREAS WILL NOT BE RE-DISTURBED FOR MORE
THAN 14 DAYS.
4. PERMANENT SEEDING AND MULCHING WITHIN 4 DAYS OF REACHING FINAL GRADE.
5. FINAL STABILIZATION WITHIN 4 DAYS AFTER CONSTRUCTION HAS BEEN COMPLETED.
6. ALL REPAIRS WILL BE INSPECTED WITHIN 48 HOURS.
NPDES SIGN
RAIN GAUGE
EQUIPMENT STORAGE AREA
CONCRETE WASHOUT AREA
FUEL STORAGE AREA
LOCATIONS SHOWN FOR FACILITY LOCATIONS ARE THE
ENGINEERS BEST ESTIMATION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATION OF FACILITIES AND ENSURING
RUNOFF WILL BE DIRECTED TO A BMP DURING CONSTRUCTION.
IF LOCATIONS VARY, THIS PLAN WILL BE REDLINED DURING
CONSTRUCTION.
GPP LEGEND
g g g g ggg g g g g g g g g g g g g g g g g g g g g g g g
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
XX
X
X
X
X
X
X
X
X
X
X gggg g g g g g g g g g g g g g g g g g g g g
C
C
C C C
M
M
PROPOSED SEEP COLLECTOR D
"SEEP COLLECTOR WITH PIPES"
4FT X 4FT UNDER DRAIN WITH
12" SDR35 CONVEYANCE PIPE
SEE SHEET 21 FOR DETAILS
LIMESTONE DISPOSAL AREA
6 INCH TOPSOIL CAP (0.14 ACRES)
AREA TO BE VEGETATED
STABILIZED
CONSTRUCTION ENTRANCE 1
PLEASE SEE SHEET 24 FOR DETAILS
BEGIN CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 20+25
RELOCATED STREAM
CHANNEL #1
END ROADSIDE
COLLECTION CHANNEL
REMOVAL AND RESTORATION
STA 3+15
EXISTING CHANNEL TO BE REGRADED
TO PROVIDE POSITIVE DRAINAGE.
VEGETATE PER DETAIL
END PROPOSED ROADSIDE
COLLECTION CHANNEL
EXTENSION
STA: 1+32
BEGIN CHANNEL
REPAIR AREA #3 (30+20)
PROPOSED GROUT KEY
END CHANNEL
REPAIR AREA #3
31+60
TEMPORARY WASTE
MATERIAL STOCKPILE
20+00
21+00
21+44
30+00
31+00
32+00
33+00
33+15
40+00
EXISTING GRAVELED ROAD
MAIN SITE ACCESS ROAD
PLEASE SEE SECTION 4.1.4
(ROADWAY REHABILITATION)
ACCESS ROAD #1
PERMANENT ACCESS ROAD CONSTRUCTION
PLEASE SEE SHEET 17 FOR DESIGN
THE EXISTING ACCESS ROAD TO BE
UPGRADED AS SHOWN
EXCESS MATERIAL WILL BE HAULED TO THE
EXISTING FAILED REFORESTATION AREA AS
SHOWN ON SHEET 5.
END CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 21+19
EXISTING 24" HDPE CULVERT
(NOT TO BE DISTURBED)
EXISTING 48" HDPE CULVERT
(NOT TO BE DISTURBED)
INSTALL PROPOSED FENCE (700LF)
6' H W/3 STRANDS OF BARB WIRE
SEE SHEET 29 FOR DETAILS
INSTALL GATE
(2) 12' VEHICULAR GATES
SEE SHEET 29 FOR DETAILS
0+00
0+50
1+00
1+45
NOTE:
EXCESS MATERIAL FROM
EXCAVATION OF THE
TREATMENT SYSTEM
(NON TOPSOIL / REFUSE)
TO BE PLACED IN FILL AREA
AS SHOWN ON SHEET 5
EXISTING CLEAN WATER CHANNEL
TO BE REGRADED TO PRE-EXISTING
CONDITION. VEGETATE PER DETAIL.
PROPOSED CHANNEL REPAIR #2
STA: 20+25 - STA: 21+19
94LF, 3FT DEEP, 6FT WIDE,
GROUTED D50=18 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PLEASE SEE SHEET 24 FOR THE
STREAM / CHANNEL PUMP AROUND
PROCEDURES DURING CONSTRUCTION
PROPOSED ROADSIDE COLLECTION CHANNEL EXTENSION
STA: 0+10 - STA: 1+32
123LF, 2FT DEEP, 2FT WIDE,
GROUTED D50=12 INCH RIPRAP LINED TRAPEZOIDAL
CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
BEGIN PROPOSED ROADSIDE
COLLECTION CHANNEL EXTENSION
STA: 0+10
BEGIN CHANNEL RESTORATION
STA: 0+10
BEGIN CHANNEL RESTORATION
STA: 0+05
EXISTING CLEAN WATER CHANNEL
TO BE REGRADED TO PROVIDE POSITIVE DRAINAGE.
VEGETATE PER DETAIL. CONSTRUCTION TO BEGIN
AT THE DOWNSTREAM END OF CHANNEL TO REDUCE SEDIMENT.
SUBSIDENCE DEPRESSION REPAIR
(3 AREAS)
PLEASE SEE SHEET 28 FOR
REPAIR DETAILS
5+50
6+00
6+50
7+00
7+50
8+00
0+95.27
0+00
0+501+001+502+00
2+50
3+00
3+50
4+00
4+
5+
5+
6+
6+
7+
7+
8+
60 29
702960
40 2940
3010 2990
1,320 FT / 0.25 MILE
TO CR 9 (WEST KEMPTON ROAD)
PROPOSED CHANNEL REPAIR #3
STA: 30+00 - STA: 31+60
160 LF, 3FT DEEP, 8FT WIDE,
GROUTED D50=24 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PLEASE SEE SHEET 24 FOR THE STREAM /
CHANNEL PUMP AROUND PROCEDURES
DURING CONSTRUCTION
EXISTING 12 INCH
SDR35 PVC PIPE
(NOT TO BE DISTURBED)
ACCESS ROAD #2
PERMANENT ACCESS ROAD CONSTRUCTION
PLEASE SEE SHEET 18 FOR DESIGN
PROPOSED FLOW SAMPLE SUMP
SEE SHEET FOR DETAILS
SIPHON SYSTEM VAULT
SEE SHEETS 12 & 13
FOR DETAIL
JUNCTION BOX
SEE SHEETS 12 & 13
FOR DETAIL2
PROPOSED
LIMESTONE BED
PLEASE SEE SHEETS
9 - 14 FOR DETAILS
PROPOSED SUMP
PLEASE SEE SHEETS
9 - 14 FOR DETAILS
PROPOSED WETLAND
PLEASE SEE SHEETS
9 - 14 FOR DETAILS
(0.25 ACRES)
INSTALL SPLASH PAD (TYP)
PLEASE SEE SHEET 26 FOR DETAILS
0+00
0+50
1+00
1+502+00
2+50
3+00
3+25
-4 0.
8%
EXISTING CLEAN WATER CHANNEL
TO BE REGRADED TO PROVIDE POSITIVE DRAINAGE.
VEGETATE PER DETAIL. CONSTRUCTION TO BEGIN
AT THE DOWNSTREAM END OF CHANNEL TO
REDUCE SEDIMENT.
ROCK CHECK
DAM (TYP)
FUEL STORAGE
AREA
NPDES SIGN
LOCATION
RAIN GAUGE LOCATION
CONCRETE
WASHOUT AREA
EQUIPMENT
STORAGE AREA
TEMPORARY STONE
CHECK DAM
040' 40' 80'
PLAN LEGEND
EXISTING ROAD EDGE
PROPOSED CONTOURS
EXISTING CONTOURS
EXISTING BORE HOLE
EXISTING FENCE LINE
EXISTING PIPE
TM.
P.
0 TAX MAP AND PARCEL NO.
PROPOSED FENCE LINE
EXISTING GROUTED CHANNEL
EXISTING RIPRAP CHANNEL
PROPOSED SEEP REPAIR
PROPOSED CHANNEL GROUTED OR RIPRAP
PROPOSED CHANNEL RECLAMATION
PROPOSED STABILIZED CONSTRUCTION ENTRANCE
PROPOSED SOLID PIPE
PROPOSED SEED MIX WITH POLLINATOR ADMIXTURE
PROPOSED SHALLOW WETLAND SEED MIXTURE
BSRF PROPOSED SILT FENCE
PROPOSED PERFORATED PIPE
PROPOSED SUBSIDENCE DEPRESSION REPAIR
CONTROL POINT (THRASHER)
STATION POINT (OTHERS)
PROPOSED PERMANENT ACCESS ROAD AGGREGATE
(Please See Individual Design For Stablization Type)
PROPOSED LIMESTONE BED
g g g g PROPOSED ACCESS ROAD DITCH
LIMITS OF DISTURBANCE
TREELINE
PROPOSED LIMESTONE DISPOSAL AREA
C
M
EXISTING CLEANOUT
EXISTING MANHOLE
PROPOSED GROUT KEY
PROPOSED TEMPORARY STOCKPILE
0.25 AC
PROPOSED VEGETATED ACCESS ROAD
STONE CHECK DAM
Horizontal Datum: NAD83 WV State Planes, North Zone, US Foot Vertical Datum: NAVD88 Geiod 12
MATCH SHEET 5
M A
TC
H
S H
E E
T 7
MATCH SHEET 8
GENERAL NOTES:
1. AS SHOWN ON THIS SHEET AND ALL SUBSEQUENT
PLAN SHEETS, PROPERTY LINE AND ROAD NUMBER
INFORMATION REPRESENTS AN APPROXIMATE BEST
FIT ESTIMATE OF PROPERTY LINE BOUNDARIES AS
OBTAINED FROM COUNTY TAX MAPS ACQUIRED
THROUGH WEST VIRGINIA STATE TAX DEPARTMENT
IN CHARLESTON, WV. PROPERTY LINES SET OUT AND
DESIGNATED WITHIN THESE CONSTRUCTION PLANS
DO NOT REPRESENT A TRUE AND ACCURATE
BOUNDARY SURVEY.
2. WHEN THE VEGETATED ACCESS ROADS ARE NO LONGER
IN USE, THE CONTRACTOR SHALL REGRADE, SEED AND
MULCH ANY DISTURBED AREAS.
EXISTING FAILED REFORESTATION AREA (4.75 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE POLLINATOR
ADMIXTURE. PLEASE SEE SECTION 6.2.3.4 OF THE
SPECIFICATIONS.
NON-TOPSOIL EXCESS MATERIAL AND EXCESS REFUSE
MATERIAL WILL BE USED TO GRADE/LEVEL NEEDED AREAS
PRIOR TO THE TOPSOIL IMPORT MATERIAL PLACEMENT.
TOPSOIL IMPORT MATERIAL WILL THEN BE PLACED AS A CAP,
6 INCHES IN DEPTH AND SEEDED AND MULCHED WITH THE
POLLINATOR SEED ADMIXTURE.
PROPOSED WETLAND AREA (0.25 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE WETLAND SEED
MIXTURE. PLEASE SEE SECTION 6.2.3.5 OF THE
SPECIFICATIONS.
ALL OTHER DISTURBED AREAS (24 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE PERMANENT SEED
MIXTURE . PLEASE SEE SECTION 6.2.3.3 OF THE
SPECIFICATIONS.
SEEDING LOCATION NOTES:
EROSION AND SEDIMENT CONTROL INSPECTION PROCEDURES
1. INSPECTION OF ALL EROSION AND SEDIMENT CONTROL BMP'S WITHIN THE DISTURBED AREAS AT LEAST ONCE EVERY FOUR CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY PRECIPITATION EVENT GREATER THAN
0.25 INCHES PER 24 HOUR PERIOD.
2. REPAIR OR MAINTENANCE TO BMP'S SHALL BE PERFORMED WITHING 24 HOURS, HOWEVER, PERMITTEES MUST IMPLEMENT ALTERNATE BMP'S PRIOR TO STORM EVENTS WHILE AWAITING REPAIR OF THE PRIMARY
ENHANCED BMP'S.
3. TEMPORARY SEEDING AND MULCHING WITHIN 4 DAYS WHEN AREAS WILL NOT BE RE-DISTURBED FOR MORE
THAN 14 DAYS.
4. PERMANENT SEEDING AND MULCHING WITHIN 4 DAYS OF REACHING FINAL GRADE.
5. FINAL STABILIZATION WITHIN 4 DAYS AFTER CONSTRUCTION HAS BEEN COMPLETED.
6. ALL REPAIRS WILL BE INSPECTED WITHIN 48 HOURS.
NPDES SIGN
RAIN GAUGE
EQUIPMENT STORAGE AREA
CONCRETE WASHOUT AREA
FUEL STORAGE AREA
LOCATIONS SHOWN FOR FACILITY LOCATIONS ARE THE
ENGINEERS BEST ESTIMATION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATION OF FACILITIES AND ENSURING
RUNOFF WILL BE DIRECTED TO A BMP DURING CONSTRUCTION.
IF LOCATIONS VARY, THIS PLAN WILL BE REDLINED DURING
B-3
B-2
B-1
B-6
B-5
B-4 g g g g g g g gg
0+00
0+500+60
0+
0+
0+
EXISTING AMD COLLECTION CHANNEL
EXISTING 565 LF CHANNEL TO BE REGRADED TO PROVIDE
POSITIVE DRAINAGE. VEGETATE PER DETAIL.
CONSTRUCTION TO BEGIN AT THE DOWNSTREAM END OF
CHANNEL TO REDUCE SEDIMENT.
EXISTING AMD POND
PROPOSED
GROUT KEY
STA: 10+25
STABILIZED
CONSTRUCTION ENTRANCE 4
PLEASE SEE SHEET 24 FOR DETAILS
PROPOSED
GROUT KEY
STA: 11+90
BEGIN CHANNEL REPAIR
PROPOSED GROUT KEY
BEGIN PROPOSED
DIVERSION CHANNEL
80+00
END PROPOSED
DIVERSION CHANNEL
82+17
BEGIN EXISTING AMD
CHANNEL RECLAMATION
STATION 0+00
END EXISTING AMD
CHANNEL RECLAMATION
STATION 5+65
PROPOSED LIMESTONE POND REHAB
PLEASE SEE SHEET 15 FOR DETAILS
STABILIZED
CONSTRUCTION
ENTRANCE 2
PLEASE SEE SHEET
24 FOR DETAILS
BEGIN CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 50+25
PROPOSED DIVERSION CHANNEL
GROUTED RIPRAP
STA: 80+00 - STA 82+17
177LF, 2FT DEEP, 2FT WIDE,
GROUTED D50=12 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PROPOSED CHANNEL REPAIR #1
STA: 10+25 - STA: 11+90
165LF, 3FT DEEP, 6FT WIDE,
GROUTED D50=18 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PLEASE SEE SHEET 24 FOR THE
STREAM / CHANNEL PUMP AROUND
PROCEDURES DURING CONSTRUCTION
BEGIN PROPOSED AMD
COLLECTION CHANNEL
70+10
END PROPOSED AMD
COLLECTION CHANNEL STA 71+52
PROPOSED AMD COLLECTION CHANNEL
STA: 70+00 - STA: 71+52
152LF, 2FT DEEP, 2FT WIDE,
GROUTED D50=12INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
SECTION A-A'
SECTION B-B'
TEMPORARY TOPSOIL
WASTE MATERIAL
STOCKPILE
PROPOSED CHANNEL REPAIR #5
STA: 50+25 - STA: 52+24
199LF, 3FT DEEP, 6FT WIDE,
GROUTED D50=18 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PLEASE SEE SHEET 24 FOR THE
STREAM / CHANNEL PUMP AROUND
PROCEDURES DURING CONSTRUCTION
50+00
51+00
52+00
52+36
70+00
70+50
71+00
71+50 71+51.83
PRESTON COUNTY
TUCKER COUNTY
EXISTING GRAVELED ROAD
MAIN SITE ACCESS ROAD
PLEASE SEE SECTION 4.1.4
(ROADWAY REHABILITATION)
ACCESS ROAD #4
PERMANENT ACCESS ROAD CONSTRUCTION
PLEASE SEE SHEET 19 FOR DESIGN
10+00
11+00
12+00
12+15
EXISTING 48 INCH HDPE
CULVERT #1 (DO NOT DISTURB)
END CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 52+24
PROPOSED SEEP COLLECTOR A
"SEEP COLLECTOR WITHOUT PIPES"
SEE SHEET 20 FOR DETAILS
PROPOSED SEEP COLLECTOR B
"SEEP COLLECTOR WITHOUT PIPES"
SEE SHEET 20 FOR DETAILS
PROPOSED SEEP COLLECTOR C
"SEEP COLLECTOR WITHOUT PIPES"
SEE SHEET 20 FOR DETAILS
STABILIZED CONSTRUCTION
ENTRANCE 3
PLEASE SEE SHEET 24 FOR DETAILS
82+17.74
80+00
80+50
81+00
81+50
82+00
EXISTING GRAVELED ROAD
MAIN SITE ACCESS ROAD
PLEASE SEE SECTION 4.1.4
(ROADWAY REHABILITATION)
ACCESS ROAD #3
Vegetated Access Approximate Location
INSTALL TIMBER MAT (TEMPORARY CROSSING)
SEE SHEET 28 FOR DETAILS
0+00
0+50
1+00
1+50
2+00
2+50
0+
0+
.3
6+00
0+00
0+50
1+00
1+
2+
2+
3+
3+
4+
4+
5+00
5+50
0+00
0+40
0+
0+
1+
1+
1+
PROPOSED
SLIP REPAIR, REFER TO SHEET 22
PROPOSED SLIP REPAIR PLANS AND PROFILES
THE CONTRACTOR IS TO INSTALL A SUMP
AT STATION 80+00 TO COLLECT UPLOPE
RUNOFF. THE CONTRACTOR WILL ENSURE
THAT THE SUMP DISCHARGES INTO THE
PROPOSED DIVERSION CHANNEL.
PLEASE SEE SHEET 28 FOR SUMP DETAILS
GROUTED D50=24 INCH RIPRAP LINED
FOR DETAILS
FOR THE STREAM /
CHANNEL PUMP AROUND PROCEDURES
ACCESS ROAD #2
TEMPORARY ACCESS ROAD CONSTRUCTION
PLEASE SEE SECTION 4.1.3
PLEASE SEE SHEET 18 FOR DESIGN
RIP RAP SEEP COLLECTORS
PLEASE SEE SHEET 20 FOR PROFILES
EXISTING ROADSIDE
COLLECTION CHANNEL
EXISTING RIPRAP
LINED CHANNEL
0+00
0+50
1+00
1+
2+
2+
3+
3+
4+
4+ 50 5+
5+
5+
INSTALL SPLASH PAD
PLEASE SEE
SHEET 26 FOR DETAILS
INSTALL SUMP
PLEASE SEE SHEET 28 FOR DETAILS
INSTALL SUMP
PLEASE SEE SHEET 28 FOR SUMP DETAILS
TO BE REGRADED TO PROVIDE POSITIVE DRAINAGE.
VEGETATE PER DETAIL. CONSTRUCTION TO BEGIN
STONE CHECK
DAM (TYP)
ROCK CHECK DAM (TYP)
040' 40' 80'
PLAN LEGEND
EXISTING ROAD EDGE
PROPOSED CONTOURS
EXISTING CONTOURS
EXISTING BORE HOLE
EXISTING FENCE LINE
EXISTING PIPE
TM.
P.
0 TAX MAP AND PARCEL NO.
PROPOSED FENCE LINE
EXISTING GROUTED CHANNEL
EXISTING RIPRAP CHANNEL
PROPOSED SEEP REPAIR
PROPOSED CHANNEL GROUTED OR RIPRAP
PROPOSED CHANNEL RECLAMATION
PROPOSED STABILIZED CONSTRUCTION ENTRANCE
PROPOSED SOLID PIPE
PROPOSED SEED MIX WITH POLLINATOR ADMIXTURE
PROPOSED SHALLOW WETLAND SEED MIXTURE
BSRF PROPOSED SILT FENCE
PROPOSED PERFORATED PIPE
PROPOSED SUBSIDENCE DEPRESSION REPAIR
CONTROL POINT (THRASHER)
STATION POINT (OTHERS)
PROPOSED PERMANENT ACCESS ROAD AGGREGATE
(Please See Individual Design For Stablization Type)
PROPOSED LIMESTONE BED
g g g g PROPOSED ACCESS ROAD DITCH
LIMITS OF DISTURBANCE
TREELINE
PROPOSED LIMESTONE DISPOSAL AREA
C
M
EXISTING CLEANOUT
EXISTING MANHOLE
PROPOSED GROUT KEY
PROPOSED TEMPORARY STOCKPILE
0.25 AC
PROPOSED VEGETATED ACCESS ROAD
STONE CHECK DAM
NOTES:
Horizontal Datum: NAD83 WV State Planes, North Zone, US Foot Vertical Datum: NAVD88 Geiod 12
PRESTON COUNTY
TUCKER COUNTY
PRESTON COUNTY
TUCKER COUNTY
1. AS SHOWN ON THIS SHEET AND ALL SUBSEQUENT
PLAN SHEETS, PROPERTY LINE AND ROAD NUMBER
INFORMATION REPRESENTS AN APPROXIMATE BEST
FIT ESTIMATE OF PROPERTY LINE BOUNDARIES AS
OBTAINED FROM COUNTY TAX MAPS ACQUIRED
THROUGH WEST VIRGINIA STATE TAX DEPARTMENT
IN CHARLESTON, WV. PROPERTY LINES SET OUT AND
DESIGNATED WITHIN THESE CONSTRUCTION PLANS
DO NOT REPRESENT A TRUE AND ACCURATE
BOUNDARY SURVEY.
2. WHEN THE VEGETATED ACCESS ROADS ARE NO LONGER
IN USE, THE CONTRACTOR SHALL REGRADE, SEED AND
MULCH ANY DISTURBED AREAS.
MATCH SHEET 5
M A
TC
H
S H
E E
T
EROSION AND SEDIMENT CONTROL INSPECTION PROCEDURES
1. INSPECTION OF ALL EROSION AND SEDIMENT CONTROL BMP'S WITHIN THE DISTURBED AREAS AT LEAST ONCE EVERY FOUR CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY PRECIPITATION EVENT GREATER THAN
0.25 INCHES PER 24 HOUR PERIOD.
2. REPAIR OR MAINTENANCE TO BMP'S SHALL BE PERFORMED WITHING 24 HOURS, HOWEVER, PERMITTEES MUST IMPLEMENT ALTERNATE BMP'S PRIOR TO STORM EVENTS WHILE AWAITING REPAIR OF THE PRIMARY
ENHANCED BMP'S.
3. TEMPORARY SEEDING AND MULCHING WITHIN 4 DAYS WHEN AREAS WILL NOT BE RE-DISTURBED FOR MORE
THAN 14 DAYS.
4. PERMANENT SEEDING AND MULCHING WITHIN 4 DAYS OF REACHING FINAL GRADE.
5. FINAL STABILIZATION WITHIN 4 DAYS AFTER CONSTRUCTION HAS BEEN COMPLETED.
6. ALL REPAIRS WILL BE INSPECTED WITHIN 48 HOURS.
NPDES SIGN
RAIN GAUGE
EQUIPMENT STORAGE AREA
CONCRETE WASHOUT AREA
FUEL STORAGE AREA
LOCATIONS SHOWN FOR FACILITY LOCATIONS ARE THE
ENGINEERS BEST ESTIMATION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATION OF FACILITIES AND ENSURING
RUNOFF WILL BE DIRECTED TO A BMP DURING CONSTRUCTION.
IF LOCATIONS VARY, THIS PLAN WILL BE REDLINED DURING
X
X 5+5
6+0
6+00
BEGIN CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 40+25
END CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 41+34
PROPOSED CHANNEL REPAIR #4
STA: 40+25 - STA: 41+34
109LF, 3FT DEEP, 10FT WIDE,
GROUTED D50 =24 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PLEASE SEE SHEET 24 FOR THE
STREAM / CHANNEL PUMP AROUND
PROCEDURES DURING CONSTRUCTION
40+00
41+00
41+60
EXISTING CLEAN WATER CHANNEL
TO BE REGRADED TO PROVIDE POSITIVE DRAINAGE.
VEGETATE PER DETAIL. CONSTRUCTION TO BEGIN
AT THE DOWNSTREAM END OF CHANNEL TO REDUCE SEDIMENT.
BEGIN CHANNEL RESTORATION
STA: 7+45
040' 40' 80'
PLAN LEGEND
EXISTING ROAD EDGE
PROPOSED CONTOURS
EXISTING CONTOURS
EXISTING BORE HOLE
EXISTING FENCE LINE
EXISTING PIPE
TM.
P.
0 TAX MAP AND PARCEL NO.
PROPOSED FENCE LINE
EXISTING GROUTED CHANNEL
EXISTING RIPRAP CHANNEL
PROPOSED SEEP REPAIR
PROPOSED CHANNEL GROUTED OR RIPRAP
PROPOSED CHANNEL RECLAMATION
PROPOSED STABILIZED CONSTRUCTION ENTRANCE
PROPOSED SOLID PIPE
PROPOSED SEED MIX WITH POLLINATOR ADMIXTURE
PROPOSED SHALLOW WETLAND SEED MIXTURE
BSRF PROPOSED SILT FENCE
PROPOSED PERFORATED PIPE
PROPOSED SUBSIDENCE DEPRESSION REPAIR
CONTROL POINT (THRASHER)
STATION POINT (OTHERS)
PROPOSED PERMANENT ACCESS ROAD AGGREGATE
(Please See Individual Design For Stablization Type)
PROPOSED LIMESTONE BED
g g g g PROPOSED ACCESS ROAD DITCH
LIMITS OF DISTURBANCE
TREELINE
PROPOSED LIMESTONE DISPOSAL AREA
C
M
EXISTING CLEANOUT
EXISTING MANHOLE
PROPOSED GROUT KEY
PROPOSED TEMPORARY STOCKPILE
0.25 AC
PROPOSED VEGETATED ACCESS ROAD
STONE CHECK DAM
Horizontal Datum: NAD83 WV State Planes, North Zone, US Foot Vertical Datum: NAVD88 Geiod 12
MATCH SHEET 6
PRESTON COUNTY
TUCKER COUNTY
GENERAL NOTES:
1. AS SHOWN ON THIS SHEET AND ALL SUBSEQUENT
PLAN SHEETS, PROPERTY LINE AND ROAD NUMBER
INFORMATION REPRESENTS AN APPROXIMATE BEST
FIT ESTIMATE OF PROPERTY LINE BOUNDARIES AS
OBTAINED FROM COUNTY TAX MAPS ACQUIRED
THROUGH WEST VIRGINIA STATE TAX DEPARTMENT
IN CHARLESTON, WV. PROPERTY LINES SET OUT AND
DESIGNATED WITHIN THESE CONSTRUCTION PLANS
DO NOT REPRESENT A TRUE AND ACCURATE
BOUNDARY SURVEY.
2. WHEN THE VEGETATED ACCESS ROADS ARE NO LONGER
IN USE, THE CONTRACTOR SHALL REGRADE, SEED AND
MULCH ANY DISTURBED AREAS.
EROSION AND SEDIMENT CONTROL INSPECTION PROCEDURES
1. INSPECTION OF ALL EROSION AND SEDIMENT CONTROL BMP'S WITHIN THE DISTURBED AREAS AT LEAST ONCE EVERY FOUR CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY PRECIPITATION EVENT GREATER THAN
0.25 INCHES PER 24 HOUR PERIOD.
2. REPAIR OR MAINTENANCE TO BMP'S SHALL BE PERFORMED WITHING 24 HOURS, HOWEVER, PERMITTEES MUST IMPLEMENT ALTERNATE BMP'S PRIOR TO STORM EVENTS WHILE AWAITING REPAIR OF THE PRIMARY
ENHANCED BMP'S.
3. TEMPORARY SEEDING AND MULCHING WITHIN 4 DAYS WHEN AREAS WILL NOT BE RE-DISTURBED FOR MORE
THAN 14 DAYS.
4. PERMANENT SEEDING AND MULCHING WITHIN 4 DAYS OF REACHING FINAL GRADE.
5. FINAL STABILIZATION WITHIN 4 DAYS AFTER CONSTRUCTION HAS BEEN COMPLETED.
6. ALL REPAIRS WILL BE INSPECTED WITHIN 48 HOURS.
EROSION AND SEDIMENT CONTROL INSPECTION PROCEDURES
1. INSPECTION OF ALL EROSION AND SEDIMENT CONTROL BMP'S WITHIN THE DISTURBED AREAS AT LEAST ONCE EVERY FOUR CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY PRECIPITATION EVENT GREATER THAN
0.25 INCHES PER 24 HOUR PERIOD.
2. REPAIR OR MAINTENANCE TO BMP'S SHALL BE PERFORMED WITHING 24 HOURS, HOWEVER, PERMITTEES MUST IMPLEMENT ALTERNATE BMP'S PRIOR TO STORM EVENTS WHILE AWAITING REPAIR OF THE PRIMARY
ENHANCED BMP'S.
3. TEMPORARY SEEDING AND MULCHING WITHIN 4 DAYS WHEN AREAS WILL NOT BE RE-DISTURBED FOR MORE
THAN 14 DAYS.
4. PERMANENT SEEDING AND MULCHING WITHIN 4 DAYS OF REACHING FINAL GRADE.
5. FINAL STABILIZATION WITHIN 4 DAYS AFTER CONSTRUCTION HAS BEEN COMPLETED.
6. ALL REPAIRS WILL BE INSPECTED WITHIN 48 HOURS.
NPDES SIGN
RAIN GAUGE
EQUIPMENT STORAGE AREA
CONCRETE WASHOUT AREA
FUEL STORAGE AREA
LOCATIONS SHOWN FOR FACILITY LOCATIONS ARE THE
ENGINEERS BEST ESTIMATION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATION OF FACILITIES AND ENSURING
RUNOFF WILL BE DIRECTED TO A BMP DURING CONSTRUCTION.
IF LOCATIONS VARY, THIS PLAN WILL BE REDLINED DURING
Appendix C.5
Erosion and Sediment Control Plan
Erosion and Sediment Control Plan
For
Kempton Refuse Rehabilitation
Tucker/Preston County, West Virginia
The Erosion and Sedimentation Controls as listed below will include the use of Belted Silt
Retention Fence (Priority 1), Rock Check Dams, Sumps, and Stone Construction Entrances.
The installation of collection ditches and sediment trap/basins will not be used on this project based on the majority of the project being linear channel repairs. The installation of collection ditches along the channels to relay water to a sediment trap/basin will greatly increase the amount of disturbance to the site. Additionally, the existing site being a reclaimed course permeable refuse pile and any excavation will expose this material and will allow the runoff to saturate the material reducing stability of the material. Any water introduced into this material will likely cause more acid mine drainage as well.
The rehabilitation of the AMD Treatment Facility will include further excavation to the existing ponds that will contain the surface runoff during this construction. The areas outside of the
AMD Treatment Facility are minimal and will be contained by Belted Silt Retention Fence
(Priority 1). The sediment within the excavated pond area generated during construction will be filtered through a rock check dam that will be constructed at the outlet of the wetland area.
The dewatering of the existing AMD Treatment Facility will be discharged into a sump that will be treated with Soda Ash Briquettes and monitored before being released from the site.
The project consists of Access Road Construction, Channel Construction, AMD Treatment
System Rehabilitation, Slip Repair and Reforestation Area Rehabilitation.
The construction of the proposed Access Roads will be controlled by the use of Belted Silt
Retention Fence that will be composed of Priority 1 type fabric that will be placed along the perimeter of the site, downslope of exterior work areas.
There will be three types of channel construction, the rehabilitation of existing channels that have been eroded by large storm events, the construction of proposed channels and the removal/restoration of existing channels.
The erosion and sediment procedures associated with the rehabilitation of existing channels that have been eroded by large storm events will be the use of pump around procedures that will contain the sediment during the construction procedures and will discharge water through a water filter bag before leaving the rehabilitation area. The proposed ditch rehabilitation will also include the installation of a clay liner reduce saturation into this material.
The erosion and sediment procedures associated with the construction of proposed channels will be controlled by the use of Belted Silt Retention Fence downslope areas of construction.
Excavation of the proposed channel to begin at the downstream end of the channel. Rock check dams to be placed as shown as the channel is excavated in an upstream direction and shall remain in place until the channel is stabilized.
The erosion and sediment procedures associated with the removal of existing channels will be controlled by the use of Belted Silt Retention Fence downslope areas of construction. The construction procedures will begin at the downslope end of the channel allowing the fill material to form a natural dam to allow the contractor to pump water through a filter bag to reduce sediment.
The construction of the proposed AMD Treatment System will be controlled by the use of
Belted Silt Retention Fence that will be composed of Priority 1 type fabric that will be placed along the perimeter of the site, downslope of exterior work areas. There will additionally be a rock check dam installed at the final discharge point of the treatment system being located in the proposed wetland.
Inspection of all erosion and sediment control BMP’s within the disturbed areas at least once every four calendar days and within 24 hours after any precipitation event greater than 0.25 inches per 24 hour period.
Repair or maintenance to BMP’s shall be performed withing 24 hours, however, permittees must implement alternate BMP’s prior to storm events while awaiting repair of the primary enhanced BMP’s.
Temporary seeding and mulching within 4 days when areas will not be re-disturbed for more than 14 days.
Permanent Seeding and mulching within 4 days of reaching final grade.
Final stabilization within 4 days after construction has been completed.
All repairs will be inspected within 48 hours.
The slopes will be temporarily or permanently seeded and mulched as quickly as construction activity will allow. If the seed fails to germinate adequately to produce vegetated cover with at least 70% density within 30 calendar days, those areas will be re-seeded and re-mulched.
Please see the construction plans, included within this permit, for specific details and locations of the erosion and sediment control measures.
All erosion and sediment control measures are to be in accordance with the West Virginia
Erosion and Sediment Control Best Management Practices Manual 2006, issued by the West
Virginia Department of Environmental Protection.
Appendix C.6
Design Sheets
USGS LOCATION MAP
SCALE: 1" = 1/2 MILE
ANI SEMPER L IB
ER
IMONT
DAVIS AND LEAD MINE QUADRANGLE
LOCATION MAP
SCALE: 1" = 1 MILE
TUCKER AND PRESTON COUNTY
KEMPTON REFUSE REHABILITATION
PROJECT
LOCATION
RICHARD G. HOVATTER, P.E. DATE
OFFICE OF ABANDONED MINE LANDS AND RECLAMATION
HAROLD D. WARD, CABINET SECRETARY
WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
DIVISION OF LAND RESTORATION
PROJECT
LOCATION
Xref ..\2016 DRAWINGS\xref-0125 border.dwg gg g g g g g g g g g
C
C
C
C C C
M
M
EXISTING
SUBSIDENCE
DEPRESSIONS
EXISTING FAILED CHANNEL AREA
EXISTING 12 INCH
SDR-35
EXISTING "RELOCATED
STREAM CHANNEL #1"
1.0 FT DEEP, 4.0 FT WIDE
639 LF RIPRAP LINED 93 LF
GROUTED RIPRAP
LINED CHANNEL
EXISTING "RELOCATED
STREAM CHANNEL #2"
1.5 FT DEEP, 6.0 FT WIDE
382 LF GROUTED RIPRAP
LINED CHANNEL AND 639
LF RIPRAP LINED
CHANNEL
EXISTING MANHOLE #1
RIM EL: 2940.38 FT
24 INCH HDPE OUT: 2931.33 FT
18 INCH SDR35 INV IN: 2931.03
12 INCH SDR35 INV IN: 2936.45 FT
18 INCH SDR 35 INV IN: 2931.88 FT
EXISTING 15 INCH SDR
CLEANOUT 1
EXISTING 24 INCH HDPE
EXISTING MANHOLE #2
RIM EL: 2945.08 FT
24 INCH HDPE INV IN: 2927 .18 FT
12 INCH SDR35 INV IN: 2927.18 FT
24 INCH HDPE INV OUT: 2927.13 FT
EXISTING 12 INCH SDR35 PVC PIPE
(DO NOT DISTURB)
EXISTING GROUTED
RIPRAP CHANNEL
EXISTING TREATMENT SYSTEM
EQUALIZATION POND
EXISTING CHAINLINK FENCE
EXISTING 18 INCH HDPE
CULVERT
EXISTING TREATMENT SYSTEM
WOODEN WEIR/FLOW GATE
EXISTING UNIMPROVED ACCESS
EXISTING 223 LF GROUTED
RIPRAP CHANNEL LINED
WETLAND DISCHARGE
EXISTING "CLEAN
WATER DIVERSION
DITCH" 1.5 FT DEEP, 2.0
FT WIDE 566 LF GRASS
LINED, 160 LF RIPRAP
LINED TRAPEZOIDAL
CHANNEL
EXISTING FAILED CHANNEL AREA
UNDERDRAIN C
EXISTING UNIMPROVED ACCESS
EXISTING RIPRAP CHANNELS
EXISTING 48 INCH HDPE
CULVERT #3 (DO NOT DISTURB)
EXISTING GATE
EXISTING 48 INCH HDPE
CULVERT #1
(DO NOT DISTURB)
EXISTING LIMESTONE POND
EXISTING SLIP
AREA
EXISTING
DRAINAGE
EXISTING 268 LF
RIPRAP LINED
CHANNEL
EXISTING ROADSIDE
COLLECTION
CHANNEL
B-1
B-2
B-3 B-6
B-5
B-4
UNDERDRAIN B
UNDERDRAIN A
EXISTING TREATMENT SYSTEM
SAPS CELL
EXISTING TREATMENT SYSTEM
SUMP
EXISTING TREATMENT SYSTEM
AEROBIC WETLAND
UNDERDRAIN D
EXISTING 24 INCH
HDPE CULVERT #2
(DO NOT DISTURB)
EXISTING RELOCATED
STREAM CHANNEL #3
RIP RAP SECTION
EXISTING FAILED CHANNEL AREA
EXISTING 48 INCH HDPE
CULVERT #4
(DO NOT DISTURB)
EXISTING ROADSIDE COLLECTION CHANNEL
1.5 FT DEEP 1,412 LF RIPRAP AND 133 LF
GROUTED RIPRAP LINED VEE CHANNEL
EXISTING ROADSIDE
COLLECTION CHANNEL
EXISTING RIPRAP
SECTION
EXISTING SEEP
AREA
EXISTING "RELOCATED
STREAM CHANNEL #3"
1.5 FT DEEP, 6.0 FT WIDE 1,283 LF
RIPRAP, 163 LF GROUTED RIPRAP
LINED TRAPEZOIDAL CHANNEL
EXISTING "AMD COLLECTION
CHANNEL" 1.5 FT DEEP 472
LF RIPRAP AND 90 LF
GROUTED RIPRAP LINED VEE
CHANNEL
EXISTING "DIVERSION DITCH #2"
1.5 FT DEEP, 3 FT WIDE
720 LF RIP RAP, 14 LF GROUTED
RIP RAP, 35 LF GRASS LINED
TRAPEZOIDAL CHANNEL
EXISTING "RELOCATED
STREAM CHANNEL #2"
1.5 FT DEEP, 6.0 FT WIDE
382 LF GROUTED RIPRAP
LINED CHANNEL AND 639
LF RIPRAP LINED
CHANNEL
EXISTING 12 INCH
SDR-35 UNDERDRAIN
OUTLET PIPE
EXISTING 12 INCH
CLEANOUT 7
CULVERT #1
INV IN: 3019.25 FT
CULVERT #1
INV OUT: 3015.36 FT
CULVERT #2
INV OUT: 3018.61 FT
CULVERT #2
INV IN: 3020.35 FT
CULVERT #3
INV IN: 2940.18 FT
CULVERT #3
INV OUT: 2935.90 FT
CULVERT #4
INV OUT:
2929.61 FTEXISTING 24 INCH HDPE
INV OUT: 2024.9 FT
EXISTING 18 INCH HDPE CULVERT
INV IN: 2875.51 FT
EXISTING 18 INCH HDPE CULVERT
INV OUT: 2872.23 FT
EXISTING 109 LF
RIPRAP LINED CHANNEL
EXISTING 118 LF
GRASS LINED CHANNEL
EXISTING 191 LF
RIPRAP LINED CHANNEL
EXISTING 12 INCH SDR35
INV OUT: 2660.6 FT
EXISTING FAILED CHANNEL AREA
EXISTING UNIMPROVED
ACCESS
EXISTING FAILED
REFORESTATION AREA
(PLEASE SEE SHEET 5 FOR
THE EXTENTS OF THIS AREA)
EXISTING 15 INCH SDR
CLEANOUT 2
EXISTING 15 INCH SDR
CLEANOUT 3
EXISTING 15 INCH SDR
CLEANOUT 4
EXISTING 15 INCH SDR
CLEANOUT 5
EXISTING 15 INCH SDR
CLEANOUT 6
EXISTING 12 INCH
CLEANOUT 8
CULVERT #4
INV IN: 2933.22 FT
0100' 100' 200'
TM.
P. 004
PLAN LEGEND
EXISTING CONTOURS
CONTROL POINT (THRASHER)
BORE HOLE
EXISTING FENCE LINE
EXISTING CULVERT
TM.
P.
TAX MAP AND PARCEL NO.
EXISTING GROUTED CHANNEL
EXISTING RIPRAP CHANNEL
EXISTING WETLAND
EXISTING SEEP
EXISTING ROAD
EXISTING CLEANOUT
EXISTING AMD COLLECTION UNDERDRAIN
EXISTING MANHOLE
EXISTING FAILED CHANNEL AREA
EXISTING "CLEAN WATER DIVERSION DITCH"
STATION POINT (OTHERS)
C
M
EXISTING 12 INCH
SDR35
INV OUT: 3002.17 FT
1. AS SHOWN ON THIS SHEET AND ALL SUBSEQUENT
PLAN SHEET, PROPERTY LINE AND ROAD NUMBER
INFORMATION REPRESENTS AN APPROXIMATE BEST
FIT ESTIMATE OF PROPERTY LINE BOUNDARIES AS
OBTAINED FROM COUNTY TAX MAPS ACQUIRED
THROUGH WEST VIRGINIA STATE TAX DEPARTMENT
IN CHARLESTON, WV. PROPERTY LINES SET OUT AND
DESIGNATED WITHIN THESE CONSTRUCTION PLANS
DO NOT REPRESENT A TRUE AND ACCURATE
BOUNDARY SURVEY.
2. TAX MAP AND PARCEL NUMBER IS FROM TUCKER
COUNTY - FAIRFIELD DISTRICT.
NOTES
EXISTING "RELOCATED
STREAM CHANNEL #1"
1.0 FT DEEP, 4.0 FT WIDE
639 LF RIPRAP LINED
93 LF GROUTED RIPRAP
LINED CHANNEL
EXISTING 12 INCH
SDR35
INV OUT: 2973.91 FT
PRESTON COUNTY
TUCKER COUNTY
PRESTON COUNTY
TUCKER COUNTY
g g g g g g g g g g g gg g g g g g g
C
C
C
C C C
M
M
PROPOSED TREATMENT SYSTEM
PLEASE SEE SHEETS 10 , 11 & 12
FOR DESIGN
PROPOSED
SEEP COLLECTOR A
PROPOSED LIMESTONE
POND REHAB
PLEASE SEE SHEET 15 FOR
DESIGN
PROPOSED
SEEP COLLECTOR D
PROPOSED
CHANNEL RESTORATION
PROPOSED
DIVERSION CHANNEL
EXISTING RELOCATED STREAM CHANNEL #2
PROPOSED CHANNEL REPAIR #4
PROPOSED SLIP REPAIR
LIMESTONE
DISPOSAL AREA
PROPOSED SUMP
PROPOSED WETLAND (0.25 ACRES)
PROPOSED ROAD SIDE
CHANNEL EXTENSION
EXISTING FAILED REFORESTATION AREA
(4.75 ACRES)
PLEASE SEE SHEETS 5, 6, 7 & 8 USE OF THIS AREA
ACCESS ROAD #1
PERMANENT ACCESS
ROAD CONSTRUCTION
PLEASE SEE SHEET 17
FOR DESIGN
PRESTON COUNTY
TUCKER COUNTY
PRESTON COUNTY
TUCKER COUNTY
1,320 FT / 0.25 MILE
TO CR 9
(WEST KEMPTON ROAD)
EXISTING GRAVELED ROAD
MAIN SITE ACCESS ROAD
PLEASE SEE SECTION 4.1.4
(ROADWAY REHABILITATION)
EXISTING UNIMPROVED
ACCESS ROAD #4
PROPOSED AMD
COLLECTION
CHANNEL
EXISTING RELOCATED STREAM CHANNEL #3
PROPOSED CHANNEL REPAIR #2
PROPOSED
SEEP
COLLECTOR B
PROPOSED
SEEP COLLECTOR C
EXISTING RELOCATED
STREAM CHANNEL #3
PROPOSED CHANNEL
REPAIR #1
EXISTING RELOCATED
STREAM CHANNEL #3
PROPOSED CHANNEL
REPAIR #5
ACCESS ROAD #2
PERMANENT ACCESS ROAD CONSTRUCTION
PLEASE SEE SHEET 18 FOR DESIGN
EXISTING RELOCATED STREAM CHANNEL #2
PROPOSED CHANNEL REPAIR #3
EXISTING SEEP AREA
EXISTING GRAVELED ROAD
MAIN SITE ACCESS ROAD
PLEASE SEE SECTION 4.1.4
(ROADWAY REHABILITATION)
ACCESS ROAD #3
VEGETATED ACCESS ROAD
PROPOSED CHANNEL
RESTORATION
PROPOSED CHANNEL
RESTORATION
PROPOSED SUBSIDENCE
DEPRESSION REPAIR
EXISTING ROADSIDE
COLLECTION CHANNEL
EXISTING 12 INCH SDR35 PVC PIPE
(NOT TO BE DISTURBED)
EXISTING 48 INCH HDPE
CULVERT #3
EXISTING 48 INCH HDPE
CULVERT #4
EXISTING 48 INCH HDPE
CULVERT #1 (DO NOT DISTURB)
EXISTING 24 INCH
HDPE CULVERT #2
(DO NOT DISTURB)
ACCESS ROAD #4
PERMANENT ACCESS
ROAD CONSTRUCTION
PLEASE SEE
SHEET 19 FOR DESIGN
PROPOSED
LIMESTONE
BED
SCE 1
SCE 2
SCE 3 SCE 4
0150' 150' 300'
PLAN LEGEND
EXISTING ROAD EDGE
PROPOSED CONTOURS
EXISTING CONTOURS
EXISTING BORE HOLE
EXISTING FENCE LINE
EXISTING PIPE
TM.
P.
0 TAX MAP AND PARCEL NO.
PROPOSED FENCE LINE
EXISTING GROUTED CHANNEL
EXISTING RIPRAP CHANNEL
PROPOSED SEEP REPAIR
PROPOSED CHANNEL GROUTED OR RIPRAP
PROPOSED CHANNEL RECLAMATION
PROPOSED STABILIZED CONSTRUCTION ENTRANCE
PROPOSED SOLID PIPE
PROPOSED SEED MIX WITH POLLINATOR ADMIXTURE
PROPOSED SHALLOW WETLAND SEED MIXTURE
BSRF PROPOSED SILT FENCE
PROPOSED PERFORATED PIPE
PROPOSED SUBSIDENCE DEPRESSION REPAIR
CONTROL POINT (THRASHER)
STATION POINT (OTHERS)
PROPOSED PERMANENT ACCESS ROAD AGGREGATE
(Please See Individual Design For Stablization Type)
PROPOSED LIMESTONE BED
g g g g PROPOSED ACCESS ROAD DITCH
LIMITS OF DISTURBANCE
TREELINE
PROPOSED LIMESTONE BED
C
M
EXISTING CLEANOUT
EXISTING MANHOLE
PROPOSED GROUT KEY
PROPOSED TEMPORARY STOCKPILE
0.25 AC
PROPOSED VEGETATED ACCESS ROAD
STONE CHECK DAM
TM.
P.
Horizontal Datum: NAD83 WV State Planes, North Zone, US Foot Vertical Datum: NAVD88 Geiod 12
SHEET 5
NOTES:
1. AS SHOWN ON THIS SHEET AND ALL SUBSEQUENT
PLAN SHEETS, PROPERTY LINE AND ROAD NUMBER
INFORMATION REPRESENTS AN APPROXIMATE BEST
FIT ESTIMATE OF PROPERTY LINE BOUNDARIES AS
OBTAINED FROM COUNTY TAX MAPS ACQUIRED
THROUGH WEST VIRGINIA STATE TAX DEPARTMENT
IN CHARLESTON, WV. PROPERTY LINES SET OUT AND
DESIGNATED WITHIN THESE CONSTRUCTION PLANS
DO NOT REPRESENT A TRUE AND ACCURATE
BOUNDARY SURVEY.
2. WHEN THE VEGETATED ACCESS ROADS ARE NO LONGER
IN USE, THE CONTRACTOR SHALL REGRADE, SEED AND
MULCH ANY DISTURBED AREAS.
SHEET 6 SHEET 7
SHEET 8
NOTE:
THIS SHEET IS FOR GENERAL LOCATION PURPOSES
PLEASE SEE SHEETS 5 THROUGH 8 FOR DETAILED INFORMATION
ggg g g g g g g g g g g g g g g g g
C
C
M
EXISTING SEEP AREA E
EXISTING FAILED REFORESTATION AREA
(4.75 ACRES)
THIS AREA WILL BE UTILIZED FOR THE PLACEMENT OF
EXCESS NON-TOPSOIL MATERIAL, EXCESS REFUSE
MATERIAL AND TOPSOIL IMPORT MATERIAL.
NON-TOPSOIL EXCESS MATERIAL AND EXCESS REFUSE
MATERIAL WILL BE USED TO GRADE/LEVEL NEEDED
AREAS PRIOR TO THE TOPSOIL IMPORT MATERIAL
PLACEMENT.
TOPSOIL IMPORT MATERIAL WILL THEN BE PLACED AS
A CAP, A MIN. OF 6 INCHES IN DEPTH. THIS AREA WILL
BE SEEDED UTILIZING THE POLLINATOR ADMIXTURE.
PLEASE SEE SECTION 6.2.3.4 OF THE SPECIFICATIONS.
TOPSOIL VOLUMES (6" COVER)
SLIP AREA TOPSOIL MATERIAL: 200CY
OFFSITE TOPSOIL IMPORT: 3,800CY
EXCESS MATERIAL (NON TOPSOIL/REFUSE) VOLUMES
TREATMENT SYSTEM EXCESS MATERIAL: 3,300CY
LIMESTONE DISPOSAL AREA EXCESS MATERIAL: 200CY
OTHER EXCESS MATERIAL: 500CY
EXISTING FAILED
REFORESTATION AREA
(4.75 ACRES)
2+00
2+50
3+00
3+50
4+004+50
5+00
5+50
6+00
6+50
8+00
8+50
8+78.44
0+00
0+95.27
INSTALL SPLASH PAD (TYP)
PLEASE SEE SHEET 26 FOR DETAILS
040' 40' 80'
PLAN LEGEND
EXISTING ROAD EDGE
PROPOSED CONTOURS
EXISTING CONTOURS
EXISTING BORE HOLE
EXISTING FENCE LINE
EXISTING PIPE
TM.
P.
0 TAX MAP AND PARCEL NO.
PROPOSED FENCE LINE
EXISTING GROUTED CHANNEL
EXISTING RIPRAP CHANNEL
PROPOSED SEEP REPAIR
PROPOSED CHANNEL GROUTED OR RIPRAP
PROPOSED CHANNEL RECLAMATION
PROPOSED STABILIZED CONSTRUCTION ENTRANCE
PROPOSED SOLID PIPE
PROPOSED SEED MIX WITH POLLINATOR ADMIXTURE
PROPOSED SHALLOW WETLAND SEED MIXTURE
BSRF PROPOSED SILT FENCE
PROPOSED PERFORATED PIPE
PROPOSED SUBSIDENCE DEPRESSION REPAIR
CONTROL POINT (THRASHER)
STATION POINT (OTHERS)
PROPOSED PERMANENT ACCESS ROAD AGGREGATE
(Please See Individual Design For Stablization Type)
PROPOSED LIMESTONE BED
g g g g PROPOSED ACCESS ROAD DITCH
LIMITS OF DISTURBANCE
TREELINE
PROPOSED LIMESTONE DISPOSAL AREA
C
M
EXISTING CLEANOUT
EXISTING MANHOLE
PROPOSED GROUT KEY
PROPOSED TEMPORARY STOCKPILE
0.25 AC
PROPOSED VEGETATED ACCESS ROAD
STONE CHECK DAM
Horizontal Datum: NAD83 WV State Planes, North Zone, US Foot Vertical Datum: NAVD88 Geiod 12
GENERAL NOTES:
1. AS SHOWN ON THIS SHEET AND ALL SUBSEQUENT
PLAN SHEETS, PROPERTY LINE AND ROAD NUMBER
INFORMATION REPRESENTS AN APPROXIMATE BEST
FIT ESTIMATE OF PROPERTY LINE BOUNDARIES AS
OBTAINED FROM COUNTY TAX MAPS ACQUIRED
THROUGH WEST VIRGINIA STATE TAX DEPARTMENT
IN CHARLESTON, WV. PROPERTY LINES SET OUT AND
DESIGNATED WITHIN THESE CONSTRUCTION PLANS
DO NOT REPRESENT A TRUE AND ACCURATE
BOUNDARY SURVEY.
2. WHEN THE VEGETATED ACCESS ROADS ARE NO LONGER
IN USE, THE CONTRACTOR SHALL REGRADE, SEED AND
MULCH ANY DISTURBED AREAS.
MATCH SHEET 6 MATCH SHEET 7
EXISTING FAILED REFORESTATION AREA (4.75 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE POLLINATOR
ADMIXTURE. PLEASE SEE SECTION 6.2.3.4 OF THE
SPECIFICATIONS.
NON-TOPSOIL EXCESS MATERIAL AND EXCESS REFUSE
MATERIAL WILL BE USED TO GRADE/LEVEL NEEDED AREAS
PRIOR TO THE TOPSOIL IMPORT MATERIAL PLACEMENT.
TOPSOIL IMPORT MATERIAL WILL THEN BE PLACED AS A CAP,
6 INCHES IN DEPTH AND SEEDED AND MULCHED WITH THE
POLLINATOR SEED ADMIXTURE.
PROPOSED WETLAND AREA (0.25 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE WETLAND SEED
MIXTURE. PLEASE SEE SECTION 6.2.3.5 OF THE
SPECIFICATIONS.
ALL OTHER DISTURBED AREAS (24 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE PERMANENT SEED
MIXTURE . PLEASE SEE SECTION 6.2.3.3 OF THE
SPECIFICATIONS.
SEEDING LOCATION NOTES:
ACCESS ROAD #2
PERMANENT ACCESS ROAD CONSTRUCTION
*STATIONS 5+50 -8+78 WILL BE RECLAIMED*
PLEASE SEE SHEET 18 FOR DESIGN
TEMPORARY TOPSOIL AND
EXCESS MATERIAL LOCATION
EROSION AND SEDIMENT CONTROL INSPECTION PROCEDURES
1. INSPECTION OF ALL EROSION AND SEDIMENT CONTROL BMP'S WITHIN THE DISTURBED AREAS AT LEAST ONCE EVERY FOUR CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY PRECIPITATION EVENT GREATER THAN
0.25 INCHES PER 24 HOUR PERIOD.
2. REPAIR OR MAINTENANCE TO BMP'S SHALL BE PERFORMED WITHING 24 HOURS, HOWEVER, PERMITTEES MUST IMPLEMENT ALTERNATE BMP'S PRIOR TO STORM EVENTS WHILE AWAITING REPAIR OF THE PRIMARY
ENHANCED BMP'S.
3. TEMPORARY SEEDING AND MULCHING WITHIN 4 DAYS WHEN AREAS WILL NOT BE RE-DISTURBED FOR MORE
THAN 14 DAYS.
4. PERMANENT SEEDING AND MULCHING WITHIN 4 DAYS OF REACHING FINAL GRADE.
5. FINAL STABILIZATION WITHIN 4 DAYS AFTER CONSTRUCTION HAS BEEN COMPLETED.
6. ALL REPAIRS WILL BE INSPECTED WITHIN 48 HOURS.
NPDES SIGN
RAIN GAUGE
EQUIPMENT STORAGE AREA
CONCRETE WASHOUT AREA
FUEL STORAGE AREA
LOCATIONS SHOWN FOR FACILITY LOCATIONS ARE THE
ENGINEERS BEST ESTIMATION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATION OF FACILITIES AND ENSURING
RUNOFF WILL BE DIRECTED TO A BMP DURING CONSTRUCTION.
IF LOCATIONS VARY, THIS PLAN WILL BE REDLINED DURING
g g g g ggg g g g g g g g g g g g g g g g g g g g g g g g
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
XX
X
X
X
X
X
X
X
X
X
X gggg g g g g g g g g g g g g g g g g g g g g
C
C
C C C
M
M
PROPOSED SEEP COLLECTOR D
"SEEP COLLECTOR WITH PIPES"
4FT X 4FT UNDER DRAIN WITH
12" SDR35 CONVEYANCE PIPE
SEE SHEET 21 FOR DETAILS
LIMESTONE DISPOSAL AREA
6 INCH TOPSOIL CAP (0.14 ACRES)
AREA TO BE VEGETATED
STABILIZED
CONSTRUCTION ENTRANCE 1
PLEASE SEE SHEET 24 FOR DETAILS
BEGIN CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 20+25
RELOCATED STREAM
CHANNEL #1
END ROADSIDE
COLLECTION CHANNEL
REMOVAL AND RESTORATION
STA 3+15
EXISTING CHANNEL TO BE REGRADED
TO PROVIDE POSITIVE DRAINAGE.
VEGETATE PER DETAIL
END PROPOSED ROADSIDE
COLLECTION CHANNEL
EXTENSION
STA: 1+32
BEGIN CHANNEL
REPAIR AREA #3 (30+20)
PROPOSED GROUT KEY
END CHANNEL
REPAIR AREA #3
31+60
TEMPORARY WASTE
MATERIAL STOCKPILE
20+00
21+00
21+44
30+00
31+00
32+00
33+00
33+15
40+00
EXISTING GRAVELED ROAD
MAIN SITE ACCESS ROAD
PLEASE SEE SECTION 4.1.4
(ROADWAY REHABILITATION)
ACCESS ROAD #1
PERMANENT ACCESS ROAD CONSTRUCTION
PLEASE SEE SHEET 17 FOR DESIGN
THE EXISTING ACCESS ROAD TO BE
UPGRADED AS SHOWN
EXCESS MATERIAL WILL BE HAULED TO THE
EXISTING FAILED REFORESTATION AREA AS
SHOWN ON SHEET 5.
END CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 21+19
EXISTING 24" HDPE CULVERT
(NOT TO BE DISTURBED)
EXISTING 48" HDPE CULVERT
(NOT TO BE DISTURBED)
INSTALL PROPOSED FENCE (700LF)
6' H W/3 STRANDS OF BARB WIRE
SEE SHEET 29 FOR DETAILS
INSTALL GATE
(2) 12' VEHICULAR GATES
SEE SHEET 29 FOR DETAILS
0+00
0+50
1+00
1+45
NOTE:
EXCESS MATERIAL FROM
EXCAVATION OF THE
TREATMENT SYSTEM
(NON TOPSOIL / REFUSE)
TO BE PLACED IN FILL AREA
AS SHOWN ON SHEET 5
EXISTING CLEAN WATER CHANNEL
TO BE REGRADED TO PRE-EXISTING
CONDITION. VEGETATE PER DETAIL.
PROPOSED CHANNEL REPAIR #2
STA: 20+25 - STA: 21+19
94LF, 3FT DEEP, 6FT WIDE,
GROUTED D50=18 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PLEASE SEE SHEET 24 FOR THE
STREAM / CHANNEL PUMP AROUND
PROCEDURES DURING CONSTRUCTION
PROPOSED ROADSIDE COLLECTION CHANNEL EXTENSION
STA: 0+10 - STA: 1+32
123LF, 2FT DEEP, 2FT WIDE,
GROUTED D50=12 INCH RIPRAP LINED TRAPEZOIDAL
CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
BEGIN PROPOSED ROADSIDE
COLLECTION CHANNEL EXTENSION
STA: 0+10
BEGIN CHANNEL RESTORATION
STA: 0+10
BEGIN CHANNEL RESTORATION
STA: 0+05
EXISTING CLEAN WATER CHANNEL
TO BE REGRADED TO PROVIDE POSITIVE DRAINAGE.
VEGETATE PER DETAIL. CONSTRUCTION TO BEGIN
AT THE DOWNSTREAM END OF CHANNEL TO REDUCE SEDIMENT.
SUBSIDENCE DEPRESSION REPAIR
(3 AREAS)
PLEASE SEE SHEET 28 FOR
REPAIR DETAILS
5+50
6+00
6+50
7+00
7+50
8+00
0+95.27
0+00
0+501+001+502+00
2+50
3+00
3+50
4+00
4+
5+
5+
6+
6+
7+
7+
8+
60 29
702960
40 2940
3010 2990
1,320 FT / 0.25 MILE
TO CR 9 (WEST KEMPTON ROAD)
PROPOSED CHANNEL REPAIR #3
STA: 30+00 - STA: 31+60
160 LF, 3FT DEEP, 8FT WIDE,
GROUTED D50=24 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PLEASE SEE SHEET 24 FOR THE STREAM /
CHANNEL PUMP AROUND PROCEDURES
DURING CONSTRUCTION
EXISTING 12 INCH
SDR35 PVC PIPE
(NOT TO BE DISTURBED)
ACCESS ROAD #2
PERMANENT ACCESS ROAD CONSTRUCTION
PLEASE SEE SHEET 18 FOR DESIGN
PROPOSED FLOW SAMPLE SUMP
SEE SHEET FOR DETAILS
SIPHON SYSTEM VAULT
SEE SHEETS 12 & 13
FOR DETAIL
JUNCTION BOX
SEE SHEETS 12 & 13
FOR DETAIL2
PROPOSED
LIMESTONE BED
PLEASE SEE SHEETS
9 - 14 FOR DETAILS
PROPOSED SUMP
PLEASE SEE SHEETS
9 - 14 FOR DETAILS
PROPOSED WETLAND
PLEASE SEE SHEETS
9 - 14 FOR DETAILS
(0.25 ACRES)
INSTALL SPLASH PAD (TYP)
PLEASE SEE SHEET 26 FOR DETAILS
0+00
0+50
1+00
1+502+00
2+50
3+00
3+25
-4 0.
8%
EXISTING CLEAN WATER CHANNEL
TO BE REGRADED TO PROVIDE POSITIVE DRAINAGE.
VEGETATE PER DETAIL. CONSTRUCTION TO BEGIN
AT THE DOWNSTREAM END OF CHANNEL TO
REDUCE SEDIMENT.
ROCK CHECK
DAM (TYP)
FUEL STORAGE
AREA
NPDES SIGN
LOCATION
RAIN GAUGE LOCATION
CONCRETE
WASHOUT AREA
EQUIPMENT
STORAGE AREA
TEMPORARY STONE
CHECK DAM
040' 40' 80'
PLAN LEGEND
EXISTING ROAD EDGE
PROPOSED CONTOURS
EXISTING CONTOURS
EXISTING BORE HOLE
EXISTING FENCE LINE
EXISTING PIPE
TM.
P.
0 TAX MAP AND PARCEL NO.
PROPOSED FENCE LINE
EXISTING GROUTED CHANNEL
EXISTING RIPRAP CHANNEL
PROPOSED SEEP REPAIR
PROPOSED CHANNEL GROUTED OR RIPRAP
PROPOSED CHANNEL RECLAMATION
PROPOSED STABILIZED CONSTRUCTION ENTRANCE
PROPOSED SOLID PIPE
PROPOSED SEED MIX WITH POLLINATOR ADMIXTURE
PROPOSED SHALLOW WETLAND SEED MIXTURE
BSRF PROPOSED SILT FENCE
PROPOSED PERFORATED PIPE
PROPOSED SUBSIDENCE DEPRESSION REPAIR
CONTROL POINT (THRASHER)
STATION POINT (OTHERS)
PROPOSED PERMANENT ACCESS ROAD AGGREGATE
(Please See Individual Design For Stablization Type)
PROPOSED LIMESTONE BED
g g g g PROPOSED ACCESS ROAD DITCH
LIMITS OF DISTURBANCE
TREELINE
PROPOSED LIMESTONE DISPOSAL AREA
C
M
EXISTING CLEANOUT
EXISTING MANHOLE
PROPOSED GROUT KEY
PROPOSED TEMPORARY STOCKPILE
0.25 AC
PROPOSED VEGETATED ACCESS ROAD
STONE CHECK DAM
Horizontal Datum: NAD83 WV State Planes, North Zone, US Foot Vertical Datum: NAVD88 Geiod 12
MATCH SHEET 5
M A
TC
H
S H
E E
T 7
MATCH SHEET 8
GENERAL NOTES:
1. AS SHOWN ON THIS SHEET AND ALL SUBSEQUENT
PLAN SHEETS, PROPERTY LINE AND ROAD NUMBER
INFORMATION REPRESENTS AN APPROXIMATE BEST
FIT ESTIMATE OF PROPERTY LINE BOUNDARIES AS
OBTAINED FROM COUNTY TAX MAPS ACQUIRED
THROUGH WEST VIRGINIA STATE TAX DEPARTMENT
IN CHARLESTON, WV. PROPERTY LINES SET OUT AND
DESIGNATED WITHIN THESE CONSTRUCTION PLANS
DO NOT REPRESENT A TRUE AND ACCURATE
BOUNDARY SURVEY.
2. WHEN THE VEGETATED ACCESS ROADS ARE NO LONGER
IN USE, THE CONTRACTOR SHALL REGRADE, SEED AND
MULCH ANY DISTURBED AREAS.
EXISTING FAILED REFORESTATION AREA (4.75 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE POLLINATOR
ADMIXTURE. PLEASE SEE SECTION 6.2.3.4 OF THE
SPECIFICATIONS.
NON-TOPSOIL EXCESS MATERIAL AND EXCESS REFUSE
MATERIAL WILL BE USED TO GRADE/LEVEL NEEDED AREAS
PRIOR TO THE TOPSOIL IMPORT MATERIAL PLACEMENT.
TOPSOIL IMPORT MATERIAL WILL THEN BE PLACED AS A CAP,
6 INCHES IN DEPTH AND SEEDED AND MULCHED WITH THE
POLLINATOR SEED ADMIXTURE.
PROPOSED WETLAND AREA (0.25 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE WETLAND SEED
MIXTURE. PLEASE SEE SECTION 6.2.3.5 OF THE
SPECIFICATIONS.
ALL OTHER DISTURBED AREAS (24 ACRES)
THIS AREA WILL BE SEEDED UTILIZING THE PERMANENT SEED
MIXTURE . PLEASE SEE SECTION 6.2.3.3 OF THE
SPECIFICATIONS.
SEEDING LOCATION NOTES:
EROSION AND SEDIMENT CONTROL INSPECTION PROCEDURES
1. INSPECTION OF ALL EROSION AND SEDIMENT CONTROL BMP'S WITHIN THE DISTURBED AREAS AT LEAST ONCE EVERY FOUR CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY PRECIPITATION EVENT GREATER THAN
0.25 INCHES PER 24 HOUR PERIOD.
2. REPAIR OR MAINTENANCE TO BMP'S SHALL BE PERFORMED WITHING 24 HOURS, HOWEVER, PERMITTEES MUST IMPLEMENT ALTERNATE BMP'S PRIOR TO STORM EVENTS WHILE AWAITING REPAIR OF THE PRIMARY
ENHANCED BMP'S.
3. TEMPORARY SEEDING AND MULCHING WITHIN 4 DAYS WHEN AREAS WILL NOT BE RE-DISTURBED FOR MORE
THAN 14 DAYS.
4. PERMANENT SEEDING AND MULCHING WITHIN 4 DAYS OF REACHING FINAL GRADE.
5. FINAL STABILIZATION WITHIN 4 DAYS AFTER CONSTRUCTION HAS BEEN COMPLETED.
6. ALL REPAIRS WILL BE INSPECTED WITHIN 48 HOURS.
NPDES SIGN
RAIN GAUGE
EQUIPMENT STORAGE AREA
CONCRETE WASHOUT AREA
FUEL STORAGE AREA
LOCATIONS SHOWN FOR FACILITY LOCATIONS ARE THE
ENGINEERS BEST ESTIMATION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATION OF FACILITIES AND ENSURING
RUNOFF WILL BE DIRECTED TO A BMP DURING CONSTRUCTION.
IF LOCATIONS VARY, THIS PLAN WILL BE REDLINED DURING
B-3
B-2
B-1
B-6
B-5
B-4 g g g g g g g gg
0+00
0+500+60
0+
0+
0+
EXISTING AMD COLLECTION CHANNEL
EXISTING 565 LF CHANNEL TO BE REGRADED TO PROVIDE
POSITIVE DRAINAGE. VEGETATE PER DETAIL.
CONSTRUCTION TO BEGIN AT THE DOWNSTREAM END OF
CHANNEL TO REDUCE SEDIMENT.
EXISTING AMD POND
PROPOSED
GROUT KEY
STA: 10+25
STABILIZED
CONSTRUCTION ENTRANCE 4
PLEASE SEE SHEET 24 FOR DETAILS
PROPOSED
GROUT KEY
STA: 11+90
BEGIN CHANNEL REPAIR
PROPOSED GROUT KEY
BEGIN PROPOSED
DIVERSION CHANNEL
80+00
END PROPOSED
DIVERSION CHANNEL
82+17
BEGIN EXISTING AMD
CHANNEL RECLAMATION
STATION 0+00
END EXISTING AMD
CHANNEL RECLAMATION
STATION 5+65
PROPOSED LIMESTONE POND REHAB
PLEASE SEE SHEET 15 FOR DETAILS
STABILIZED
CONSTRUCTION
ENTRANCE 2
PLEASE SEE SHEET
24 FOR DETAILS
BEGIN CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 50+25
PROPOSED DIVERSION CHANNEL
GROUTED RIPRAP
STA: 80+00 - STA 82+17
177LF, 2FT DEEP, 2FT WIDE,
GROUTED D50=12 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PROPOSED CHANNEL REPAIR #1
STA: 10+25 - STA: 11+90
165LF, 3FT DEEP, 6FT WIDE,
GROUTED D50=18 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PLEASE SEE SHEET 24 FOR THE
STREAM / CHANNEL PUMP AROUND
PROCEDURES DURING CONSTRUCTION
BEGIN PROPOSED AMD
COLLECTION CHANNEL
70+10
END PROPOSED AMD
COLLECTION CHANNEL STA 71+52
PROPOSED AMD COLLECTION CHANNEL
STA: 70+00 - STA: 71+52
152LF, 2FT DEEP, 2FT WIDE,
GROUTED D50=12INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
SECTION A-A'
SECTION B-B'
TEMPORARY TOPSOIL
WASTE MATERIAL
STOCKPILE
PROPOSED CHANNEL REPAIR #5
STA: 50+25 - STA: 52+24
199LF, 3FT DEEP, 6FT WIDE,
GROUTED D50=18 INCH RIPRAP LINED
TRAPEZOIDAL CHANNEL W/GCL
PLEASE SEE SHEET 25 FOR DETAILS
PLEASE SEE SHEET 24 FOR THE
STREAM / CHANNEL PUMP AROUND
PROCEDURES DURING CONSTRUCTION
50+00
51+00
52+00
52+36
70+00
70+50
71+00
71+50 71+51.83
PRESTON COUNTY
TUCKER COUNTY
EXISTING GRAVELED ROAD
MAIN SITE ACCESS ROAD
PLEASE SEE SECTION 4.1.4
(ROADWAY REHABILITATION)
ACCESS ROAD #4
PERMANENT ACCESS ROAD CONSTRUCTION
PLEASE SEE SHEET 19 FOR DESIGN
10+00
11+00
12+00
12+15
EXISTING 48 INCH HDPE
CULVERT #1 (DO NOT DISTURB)
END CHANNEL REPAIR
PROPOSED GROUT KEY
STA: 52+24
PROPOSED SEEP COLLECTOR A
"SEEP COLLECTOR WITHOUT PIPES"
SEE SHEET 20 FOR DETAILS
PROPOSED SEEP COLLECTOR B
"SEEP COLLECTOR WITHOUT PIPES"
SEE SHEET 20 FOR DETAILS
PROPOSED SEEP COLLECTOR C
"SEEP COLLECTOR WITHOUT PIPES"
SEE SHEET 20 FOR DETAILS
STABILIZED CONSTRUCTION
ENTRANCE 3
PLEASE SEE SHEET 24 FOR DETAILS
82+17.74
80+00
80+50
81+00
81+50
82+00
EXISTING GRAVELED ROAD
MAIN SITE ACCESS ROAD
PLEASE SEE SECTION 4.1.4
(ROADWAY REHABILITATION)
ACCESS ROAD #3
Vegetated Access Approximate Location
INSTALL TIMBER MAT (TEMPORARY CROSSING)
SEE SHEET 28 FOR DETAILS
0+00
0+50
1+00
1+50
2+00
2+50
0+
0+
.3
6+00
0+00
0+50
1+00
1+
2+
2+
3+
3+
4+
4+
5+00
5+50
0+00
0+40
0+
0+
1+
1+
1+
PROPOSED
SLIP REPAIR, REFER TO SHEET 22
PROPOSED SLIP REPAIR PLANS AND PROFILES
THE CONTRACTOR IS TO INSTALL A SUMP
AT…