Stillwater Floating Docks.Sole Source Justification ._Redacted.pdf

PDF 589 KB Posted

Attached to
Construction- Pier Repairs NUWC Newport Federal contract opportunity
Solicitation number
N6660420Q8210
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Construction- Pier Repairs NUWC Newport, newest first.
File Type Posted
N66604-20-Q-8210-0003.pdf PDF
NAVSEA COVID-19 Guidance.pdf PDF
N6660420Q8210 Amendment 0002.pdf PDF
Face Covering Requirement.pdf PDF
NUWC Sketch SWD-1 Stillwater Floating Docks - Repair Replacement Annotations REV 15APR20.pdf PDF
Pier Photos 2 .pdf PDF
Pier Photos.pdf PDF
N6660420Q8210.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLE SOURCE JUSTIFICATION

Stillwater Basin Floating Dock Replacement

PR 1300847802

DESCRIPTION OF REQUIREMENT:

The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) Narragansett Bay Testing Facility (NBTF) (Code 70) has a requirement to repair existing floating docks that are damaged and in disrepair.

Bellingham Marine Company is the manufacturer and installer of the original, existing floating ‘Unifloat’ dock system, at Stillwater Basin NBTF. The existing floating dock system has been degraded by numerous and recent adverse weather events that have caused heavy sea states and severe wave action. Several floating dock sections are damaged and listing and require complete replacement. The timber waler system, with connecting through rods, require replacement to make the dock system a complete floating unit.

Immediate repair of the dock system requires replacing two (2) 7 ft. X 10 ft. ‘Unifloat’ concrete floats and two 5 ft. X 24 ft. ‘Unifloat’ finger piers. These new replacement concrete floats must be compatible with the existing Bellingham ‘Unifloat’ system. The waler system that connects the precast concrete floats together into one integral dock system utilizes a specific (Bellingham Marine) bolt and bolt socket pattern that must match the float units which will remain in place.

As such, the replacement precast concrete float units must be Bellingham Marine ‘Unifloat’ dock units.

items are below:.

CLIN Description/Title Qty Notes 0001 Concrete Unifloat, 5'x24' 2 EA 0002 Concrete Unifloat, 7'x10' 2 EA 0003 Steel Corner Brace Frames, Galv 9 EA 4'x6' Triangles 0004 Polymer Filler Slabs 9 EA 0005 Wood Waler Sytem, Treated - 3x10 1020 LF 0006 Wood Waler Sytem, Treated - 2x10 510 LF Rub Board 0007 Wood Waler Sytem, Treated - 4x10 108 LF 0008 3/4" dia Thru-Rods, Galv Steel 460 EA Walkway Float Rods 0009 3/4" dia Thru-Rods, Galv Steel 50 EA Finger Float Rods 0010 12" Cleats, Galv Steel 50 EA With Attach Hdwe 0011 Side Mount Pile Hoops, Galv Steel 3 EA With Attach Hdwe 0012 Finger End-Mount Pile Retainer 2 EA Galv Stl w/ Attach Hdwe 0013 Vinyl Fendering Model 5005A 618 LF Color: Dark Grey 0014 Corner Bumpers 9 EA 0015 Installation 1 Job v1.5_JANUARY2020

APPROVAL:

Contracting Officer:

Based on the above, I have determined that the circumstances of the contract action deem only one source reasonably available/only this brand can fulfill the requirements. I certify that this justification is accurate and complete to the best of my knowledge and belief.

File details come from the government source that posted it. Updated .