Steam Piping Repair SOW.pdf
PDF 1 MB Posted
- Solicitation number
- 70Z08123QELIZ000149
About this file
This scope of work document outlines requirements for a steam and condensate piping repair project at a U.S. Coast Guard base. The contractor will replace failed steel piping outside Building 91, including approximately 10 feet each of 8-inch and 6-inch schedule 40 steel pipe, various fittings, and insulation. Work must be completed within 45 calendar days and is subject to Davis-Bacon wage rates. The contractor must provide qualified welders, air monitoring, and follow all safety procedures. Submittals such as pipe specifications and schedules are due within 14 days of award. The solicitation number for this opportunity is 70Z08123QELIZ000149 and was issued by the Department of Homeland Security U.S. Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF18_Steam Pipe.pdf | ||
| DBA WD NC20230056.txt | TXT text file | |
| DAVIS_BACON_ACT.pdf | ||
| Construction Clauses_ Provisions FAC 2022_08.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facilities Engineering Department
Scope of Work and Specifications for
Building 91 Main Steam Pit Steam & Condensate Piping Repair
Project
Located at U.S. Coast Guard Base
Elizabeth City, N.C.
June 2023
Commanding Officer United States Coast Guard
Base Elizabeth City
Elizabeth City, NC 27909
1) SCOPE: The Contractor shall provide all supervision, labor, equipment, parts, and materials to cut out failed steel steam and condensate piping and replace with new steel pipe and fittings. This work is located outside of building 91 in the main steam pit. This steam pit is constructed of cast in place concrete walls and floor with a wood framed roof with three access hatches. This pit is approximately 8 feet into the ground. This work will be performed outside of Building 91 (Boiler House) and is located at USCG Base Elizabeth City, NC.
Building 91 is the main steam plant for the Industrial buildings located at the eastern end of Base Elizabeth City.
2) GOVERNMENT FACILITIES AND UTILITIES:
a. Electrical power is available on the site. The Contractor will be permitted to utilize these utilities in performing the work, provided that the existing systems are not overloaded.
b. Telephone services will not be available for use by the contractor.
c. Building restroom facilities are available for use.
3) MATERIALS AND LOCATIONS:
a. Materials shall be delivered to the jobsite in their original unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Storage shall be in accordance with manufacturer’s recommendations in a clean, dry, well-ventilated area. Stored materials shall be protected from sunlight and kept away from excessive heat. Insulation board shall not be exposed to flame or other ignition sources. The contractor shall not store any highly flammable materials in the work area. Sufficient area for staging is available on site; storage areas will be pre-approved by the Contracting Officers Representative (COR). Special precautions shall be taken to ensure construction materials and debris does not enter the airfield, runways, or taxiways.
b. The Contractor is required to comply with local VOC laws and regulations. All applicable Material Safety Data Sheets shall be available upon request.
4) SCHEDULE OF WORK: Completion of work shall be accomplished within 45 calendar days from acceptance of submittals. The Contractor shall perform all work during normal base work hours. The base normal working hours are 7:00 am to 4:00 pm, Monday through Friday, but the contractor is not limited to these hours. If the contractor is going to work outside normal working hours, permission must be obtained from the COR.
5) EXISTING CONDITIONS: The contractor is expected to satisfy himself as to the existing conditions and the work to be performed. The contractor shall verify all dimensions and equipment data prior to ordering materials and commencement of work. A site visit is highly encouraged and should be arranged by contacting Mr. Mark Croley by Email: Mark.E.Croley@uscg.mil
6) LIABILITY OF CONTRACTOR: Any damage to government property caused by the contractor shall be repaired or replaced by the contractor at no cost to the government. The contractor shall not disconnect any service without approval from the COR.
7) INSPECTION AND ACCEPTANCE: The COR will accomplish inspection and acceptance of work.
8) LABOR LAWS: The Davis-Bacon Act applies to the procurement.
9) SAFETY: The Contractor is wholly responsible for work site safety. The
Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, signs, signal lights, etc. as well as complying with the requirements of all Federal, State and Local safety laws, rules, and regulations.
10) SITE RESTORATION & CLEAN UP: The work site shall be cleaned up at the completion of each workday. Contractor shall take special care to contain dust while working. Upon completion of the job, the Contractor shall clean up the job site, returning it to a state of cleanliness equal to or exceeding that in which it was found. The Contractor shall properly dispose of any trash, extra materials, dirt, debris, or other litter that remains. There will be no final acceptance of the contract until the Contracting Officer’s Representative (COR) approves the appearance of the job site.
11) GOVERNMENT FACILITIES AND REGULATIONS: The Contractor, their employees, and any sub-contractors shall become familiar with and obey all Base/ Unit regulations. All personnel employed on the project shall keep within the limits of the work area and shall not enter any other area outside of the work site unless to do so in the performance of their duties. There shall be No Smoking in any Coast Guard Building. All smoking must be done in the designated smoking area.
12) CONTRACT TIMELINE: The Contractor shall provide all required information and complete this contract within this time schedule, unless approved by the Contracting Officer.
a. Provide all required submittals to the Contracting Officer within 14 calendar days after contract award.
b. The U.S. Coast Guard will have 14 calendar days to review the submittals and respond to Contractor.
c. Contractor shall provide projected delivery schedule during proposal and provide a firm delivery date within 14 calendar days after the contract has been awarded.
d. The Contractor, upon receiving notification that the U.S. Coast Guard has approved the submittals and having received the Contractors firm delivery date schedule, will have 28 Calendar days to begin work on the project and have the project completed within 21 calendar days. The Contractor shall notify the Contracting Officer of any long lead time delivery of equipment, so that the Contracting Officer can modify the delivery date of the contract.
13) SUBMITTALS:
a. Once awarded, the following list of submittals required for approval defines the specific minimum requirements for this contract. The submittal shall contain sufficient information that can be used to determine compliance of the material and personnel qualifications with these specifications and referenced specifications.
i) Steel pipe & fittings
ii) Welding certifications/ Qualifications
iii) Air Clearance certifications
iv) Work delivery schedule
14) REFERENCES:
a. Photos of piping
15) TECHNICAL REQUIREMENTS:
General:
The Contractor shall provide all supervision, labor, equipment, parts, and materials to cut out failed steel steam and condensate piping and replace with new steel pipe and fittings. This work is located outside of building 91 in the main steam pit and is classified as a “CONFINED SPACE”. This steam pit is constructed of cast in place concrete walls and floor with a wood framed roof with three access hatches. This pit is approximately 8 feet into the ground.
This work will be performed outside of Building 91 (Boiler House) and is located at USCG Base Elizabeth City, NC. Building 91 is the main steam plant for the Industrial buildings located at the eastern end of Base Elizabeth City.
The existing steel piping inside the pit has failed at several points due to age and condition. The Boiler plant operates at 30 PSI maximum steam pressure. The steam piping to be replaced is 8-inch steel welded pipe and fittings. The steam condensate piping is 4 inch & 6 inch, including a 1-inch condensate piping arrangement with wye strainer, steam trap, isolation valves. This 1-inch condensate piping connects to a 2-inch drip leg located on the bottom of the main steam pipe to the condensate return pipe.
Approximate Steel Pipe and fittings (150#) to be replaced.
• 10 feet- 8-inch schedule 40 steel pipe
• 1 each- 8-inch sch. 40 90 deg. ell
• 1 each – 8-inch sch. 40 45 deg ell
• 4 each- 8-inch flanges, bolts, and gasket sets
• 10 feet – 6-inch schedule 40 steel pipe
• 1 each- 6-inch flange, bolts, and gasket sets
• 2 each- 6-inch sch. 40, 90-degree ell
• Misc.- 1 inch sch. 40 steel pipe, wye strainer, isolation valves, steam trap, unions, etc.
A. The Contractor shall provide certified personnel to provide air clearance and monitor as necessary for safety of the workers’ health.
B. The Contractor shall ensure that SAFETY practices and procedures are observed and strictly adhered to.
C. The Contractor shall provide a qualified and certified welder, welding materials and welding equipment to connect the necessary pipe fittings and required “thread-O- lets” and re-pipe in original piping configuration.
D. The Contractor shall provide and install all steam and condensate pipe & fittings necessary to connect the new pipe to the existing piping system between the point of solid piping and the flanged valves and elbows.
E. The Contractor shall remove all existing pipe insulation inside the steam pit so that all pipes may be visually inspected for condition. The existing pipe insulation is covered with aluminum corrugated all service jacket. The Contractor shall provide and install new pipe insulation of equivalent rating value and type of what was removed including corrugated aluminum all service jacket on all piping inside the steam pit.
F. The Contractor shall make connection of the new steam and condensate piping to the existing main flanged valves located inside the steam pit using, new flanged connections, including new flange gaskets, flange bolts, washers, and all fasteners required to make the piping system fully functionable and leak free.
G. The Contractor shall satisfy themselves of all pipe sizes and materials necessary to perform this work.
H. The Contractor shall clean the space of all excess materials and debris at the completion of work.
TESTING AND INSPECTION:
a. The Contractor shall notify the Contracting Officer’s Representative (COR) 5 days before the performance, inspection and acceptance tests are to be conducted. The tests shall be performed in the presence of the COR.
b. Installation, workmanship, fabrication, assembly, erection, examination, inspection, and testing shall be in accordance with appropriate sections of
29 CFR 1910, 1926.
References: Photos
Main Steam Pit with 3 access hatches
Main steam piping
Note: Center pipe riser is no longer in use. This piping will be eliminated.
Main steam pipe to be replaced. Estimated to be 8-inch pipe.
Note 1: Pipe riser on lefthand side is no longer being used and can be eliminated.
Note 2: Condensate trap at bottom of steam main pipe with 1” pipe side outlet.
Condensate trap at bottom of steam main pipe with 1” pipe side outlet
1” Condensate piping from steam main to condensate return main to be replaced
Condensate piping photo
Condensate return piping to be replaced from bottom flange of gate valve to vertical piping seen on righthand side of photo.
Main steam piping to be replaced and connected to this flanged elbow.
Note: Riser shown on lefthand side to be eliminated.
View from inside of steam pit looking up through one of three access hatches.
| General: |
| A. The Contractor shall provide certified personnel to provide air clearance and monitor as necessary for safety of the workers’ health. |
| B. The Contractor shall ensure that SAFETY practices and procedures are observed and strictly adhered to. |
| C. The Contractor shall provide a qualified and certified welder, welding materials and welding equipment to connect the necessary pipe fittings and required “thread-O- lets” and re-pipe in original piping configuration. |
| D. The Contractor shall provide and install all steam and condensate pipe & fittings necessary to connect the new pipe to the existing piping system between the point of solid piping and the flanged valves and elbows. |
| E. The Contractor shall remove all existing pipe insulation inside the steam pit so that all pipes may be visually inspected for condition. The existing pipe insulation is covered with aluminum corrugated all service jacket. The Contractor shall pro... |
| F. The Contractor shall make connection of the new steam and condensate piping to the existing main flanged valves located inside the steam pit using, new flanged connections, including new flange gaskets, flange bolts, washers, and all fasteners requ... |
| G. The Contractor shall satisfy themselves of all pipe sizes and materials necessary to perform this work. |
| H. The Contractor shall clean the space of all excess materials and debris at the completion of work. |