A-603 FINISHING SCHEDULE-R2-A-603-A1.pdf
PDF 531 KB Posted
- Attached to
- KIZAD Warehouse Construction Services Federal contract opportunity
- Solicitation number
- STC10017R0004
- Issued by
- Department of State US Embassy Abu Dhabi
About this file
As Built - Architecture
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ADPC-IZ-IDO-RPT-00184-004_Tenant Fitting-Out Guidelines.pdf | ||
| KIZAD_-_Warehouse_A-02_BOQ_Amended_0226_2017.pdf | ||
| A-301 | — | |
| A-201 | — | |
| A-401 | — | |
| A-603 | — | |
| A-401 | — | |
| A-405 | — | |
| A-405 | — | |
| A-409 | — | |
| A-108 | — | |
| A-407 | — | |
| A-105 | — | |
| A-201 | — | |
| A-104 | — | |
| A-106 | — | |
| A-403 | — | |
| A-001 | — | |
| A-301 SECTIONS-R2-A-301-A1.pdf | ||
| A-101 | — | |
| A-105 | — | |
| A-002 | — | |
| A-406 | — | |
| A-101 | — | |
| A-002 | — | |
| A-108 | — | |
| A-001 | — | |
| A-201 | — | |
| A-405 | — | |
| A-105 | — | |
| A-003 | — | |
| A-404 | — | |
| A-406 | — | |
| A-401 | — | |
| A-004 | — | |
| A-107 | — | |
| A-404 | — | |
| A-104 | — | |
| A-105 | — | |
| A-107 | — | |
| A-406 | — | |
| A-107 | — | |
| As_Built_Drawing_-_MEP.zip | ZIP file | |
| As_Built_Drawing_-_Structural.zip | ZIP file | |
| Municipality_Approved_Drawings.pdf | ||
| Civil_Defense_Approved_Drawings.pdf | ||
| Warranty_and_Forms.pdf | ||
| 01_-_STC10017R0004_KIZAD_Fit-out_Solicitation.pdf | ||
| Civil_Defense_Approved_Drawings.pdf | ||
| Synopsis_FBO_Kizad_Fit-out.pdf |
Show all 50
KIZAD Warehouse Construction Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING TYPE -PHASE-1-TYPE-A1 (GROUND FLOOR)
WAREHOUSE-1A1-G-01 C2F2W2 --
ENTRANCEA1-G-01A --
LOBBYA1-G-01B --
ELECTRIC ROOMA1-G-01C --
KITCHENA1-G-01D
TOILET LOBBYA1-G-01E
TOILETA1-G-01F
TOILETA1-G-01G
WAREHOUSE-2A1-G-02
ENTRANCEA1-G-02A
LOBBYA1-G-02B
ELECTRIC ROOMA1-G-02C
KITCHENA1-G-02D
TOILET LOBBYA1-G-02E
TOILETA1-G-02F
TOILETA1-G-02G
WAREHOUSE-3A1-G-03
ENTRANCEA1-G-03A
LOBBYA1-G-03B
ELECTRIC ROOMA1-G-03C
KITCHENA1-G-03D
TOILET LOBBYA1-G-03E
TOILETA1-G-03F
TOILETA1-G-03G
WAREHOUSE-4A1-G-04
ENTRANCEA1-G-04A
LOBBYA1-G-04B
ELECTRIC ROOMA1-G-04C
KITCHENA1-G-04D
TOILET LOBBYA1-G-04E
TOILETA1-G-04F
TOILETA1-G-04G
WAREHOUSE-5A1-G-05
ENTRANCEA1-G-05A
LOBBYA1-G-05B
ELECTRIC ROOMA1-G-05C
KITCHENA1-G-05D
TOILET LOBBYA1-G-05E
TOILETA1-G-05F
TOILETA1-G-05G
S1
S1
S1
S1
S1
C5F3W3
C3F2W4
C3F2W4
C1F1W1
F1
C1F1W1
C1F1W1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C3F2W4
C3F2W4
C3F2W4
C3F2W4
C1F1
C1F1
C1F1
C1F1
A1-G-01H --C3F4IT ROOM W4
A1-G-02H --C3F4IT ROOM W4
A1-G-03H --C3F4IT ROOM W4
A1-G-04H --C3F4IT ROOM W4
A1-G-05H --C3F4IT ROOM W4
C1W4
W4
W4
W4
W1
ELECTRIC METER ROOMA1-G-12
L.V ROOMA1-G-13
TRANSFORMER ROOMA1-G-14
SWITCH ROOMA1-G-15
ELECTRICAL ROOMA1-G-16
W4 --C4F2
W4 --C4F2
W4 --C4F2
W4 --C4F2
W4 --C4F2
BUILDING TYPE -PHASE-1-TYPE-A1 (GROUND FLOOR)
WAREHOUSE-11A1-G-11
ENTRANCEA1-G-11A
LOBBYA1-G-11B
ELECTRIC ROOMA1-G-11C
KITCHENA1-G-11D
TOILET LOBBYA1-G-11E
A1-G-11F
A1-G-11G
S1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C3F2W4
F1W4
FEMALE TOILET
MALE TOILET
A1-G-11H
WAREHOUSE-9A1-G-09
ENTRANCEA1-G-09A
LOBBYA1-G-09B
ELECTRIC ROOMA1-G-09C
KITCHENA1-G-09D
TOILET LOBBYA1-G-09E
A1-G-09F A1-G-09G
S1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C3F2W4
C1F1W4
FEMALE TOILET
MALE TOILET
A1-G-09H --C3F4IT ROOM W4
WAREHOUSE-6A1-G-06
ENTRANCEA1-G-06A
LOBBYA1-G-06B
ELECTRIC ROOMA1-G-06C
KITCHENA1-G-06D
TOILET LOBBYA1-G-06E
TOILETA1-G-06F
TOILETA1-G-06G
WAREHOUSE-7A1-G-07
ENTRANCEA1-G-07A
LOBBYA1-G-07B
ELECTRIC ROOMA1-G-07C
KITCHENA1-G-07D
TOILET LOBBYA1-G-07E
TOILETA1-G-07F
TOILETA1-G-07G
WAREHOUSE-8A1-G-08
ENTRANCEA1-G-08A
LOBBYA1-G-08B
ELECTRIC ROOMA1-G-08C
KITCHENA1-G-08D
TOILET LOBBYA1-G-08E
TOILETA1-G-08F
TOILETA1-G-08G
S1
S1
S1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C3F2W4
C3F2W4
C3F2W4
C1F1
C1F1
C1F1
A1-G-06H --C3F4IT ROOM W4
A1-G-07H --C3F4IT ROOM W4
A1-G-08H --C3F4IT ROOM W4
W1
W4
W4
WAREHOUSE-10A1-G-10
ENTRANCEA1-G-10A
LOBBYA1-G-10B
ELECTRIC ROOMA1-G-10C
KITCHENA1-G-10D
TOILET LOBBYA1-G-10E
A1-G-10F
A1-G-10G
S1
C2F2W2
C5F3W3
C3F2W4
C1F1W1
C1F1W1
C1F1W1
C3F2W4
C1F1W4
FEMALE TOILET
MALE TOILET
A1-G-10H --C3F4IT ROOM W4
C1
--C3F4IT ROOM W4
BUILDING TYPE -PHASE-1-TYPE-A1 (MEZZANINE FLOOR)
OFFICE-1A1-M-01 C2F2W5 --
OFFICE-2A1-M-02 --
C2F2W5
OFFICE-3A1-M-03 C2F2W5
OFFICE-4A1-M-04
OFFICE-5A1-M-05
OFFICE-6A1-M-06
OFFICE-7A1-M-07
OFFICE-8A1-M-08
W5
W5
W5
W5
W5
F2
F2
F2
F2
F2
C2
C2
C2
C2
C2
--OFFICE-9A1-M-09 W5 F2 C2
--OFFICE-10A1-M-10 W5 F2 C2
--OFFICE-11A1-M-11 W5 F2 C2
W1
FINISHES LEGEND
F1
C1
SANDWICH PANEL AS PER SPECS.C2
EXPOSED BLOCK WALLW2
SMOOTH POWER FLOATEDF2
F3
300 X 300MM DARK GREY FLOOR TILE
600X600MM PERFORATED METAL CEILING TILE.
300 X 300MM DARK GREY WALL TILE
TEXTURED MATT FINISH OVER PLASTERW3
EMULSION PAINT WITH TOP COAT OVER PLASTERW4
C4
MEZZANINE DECKING PANELC3
PAINT APPLIED ON CONCRETE SURFACE
EMULSION PAINT OVER GYPSUM BOARD / DRYWALLW5
C5 ALUMINUM COMPOSITE PANEL
S1
ANTISTATIC FLOOR FINISHF4
300 X 100MM DARK GREY FLOOR TILE
NON SLIP BLACK GRANITI TEXTURED TILE
(FOR ENTRANCE, RISER & TREAD)
Project Name And
Location
Main Contractor
Design Consultant
Owner Name
DESCRIPTION DATENO.
INDUTRIAL ZONE AREA A-
KIZAD PRE BUILT WAREHOUSES
KHALIFA PORT & INDUSTRIAL ZONE (KPIZ)
PLOT No. 8 - SECTOR No. KH1A9 - ABU DHABI
PROJECT ID No. 46300
WSP MIDDLE EAST, P.O.BOX 112046
ABU DHABI, UAE
TEL: +971 2 667 3875 FAX: +971 2 667 3876
CHECKED BY
PREPARED BY
WSP
Reviewed / Approved
MIDDLE EAST,
ABU DHBAI,
A1
DETAIL DESIGN DRAWING
Drawing No.
Drawing Status
Revision
Sheet Number Paper SizeScale
Drawing Title
G + M WAREHOUSE
Project Description
WE, SYSTEM CONSTRUCT, VERIFY THAT THIS CONTRACTOR'S
DOCUMENT
HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE
WITH CONTRACTOR'S QUALITY ASSURANCE PLAN
IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT.
COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT.
FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED FOR
WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE EMPLOYER:
NIL
OTHER RELATED LETTERS/CTIs WHICH DOCUMENT
CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE LISTED
BELOW:
NIL
CONTRACTOR'S PROJECT MANAGER:
PM NAME SIGNATURE DATE
NOTES:
DOCUMENT STATUS STAMP
THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE
FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE MATTERS
CONTAINED WITHIN THE CONTRACTOR'S DOCUMENT:
CONSTRUCTION
WORK MAY PROCEED
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF
COMMENTS INDICATED
REVISE & RESUBMIT. WORK MAY NOT
PROCEED
REVIEW NOT REQUIRED. WORK MAY
PROCEED
CODE 1
CODE 2
CODE 3
CODE 4
ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER UNDER
THIS CONTRACT WITH RESPECT TO ANY OF CONTRACTOR'S
DOCUMENTS SHALL NOT IN ANY WAY BE, OR DEEMED TO BE, AN
APPROVAL OF ANY WORKS OR AN ACCEPTANCE THAT THE
CONTRACTOR'S DOCUMENTS MEET THE REQUIREMENTS OF THE
CONTRACT, AS CONTRACTOR HAS THE SOLE RESPONSIBILITY FOR
PERFORMING THE WORKS IN ACCORDANCE WITH THE
REQUIREMENTS OF THIS CONTRACT.
ABU DHABI PORTS COMPANY DATE
ARCHITECTURAL
FINISHING SCHEDULE (TYPE - A1)
A-603