Station_51_Remodel_Updated_2025_word_2-6-2025.pdf
PDF 7 MB Posted
- Attached to
- Firehouse Renovation 2025
- Solicitation number
- 2025-ITB-017DW
- Issued by
- Santa Barbara County, Long Beach City, California
About this file
This Scope of Work document outlines renovation specifications for Lompoc Fire Station 51 in California. The project encompasses comprehensive renovations across multiple rooms including firefighter dormitories, captain's dormitories, engineer dormitories, hallways, a kitchen and dayroom, training room, stairwell, and restroom facilities. Specific work items include window retrofitting with dual-pane tinted opening windows, baseboards replacement with FLEXCO Base Sculptures (4" height, 3/8" gauge, ICON profile), flooring replacement with Paradigm Performer Plus in Hummingbird color, and ceiling lighting upgrades featuring dimmable canned lights throughout. Kitchen renovations involve substantial work including cabinet replacement with custom white shaker-style "Sebring" cabinets, stainless steel countertops and sink with fixtures, subway tile backsplash, under-cabinet lighting, garbage disposal replacement, gas line recession into wall, electrical outlet replacement, and RO System upgrade. Additional scope includes French door replacement, handrail refinishing or replacement, station alert light installation, and a coffee bar with cabinetry in the training room. Bids are due by 2:00 pm on Friday, May 30, 2025, with proposals valid for 90 calendar days after the bid opening date.
The document does not contain information regarding pricing terms, set-asides, incumbents, funding sources, or contract award amounts. No site visit requirements, bidder's conferences, or specific performance timelines are detailed in this scope of work document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Firehouse_Renovation_2025_(Addendum_#3_Revision).pdf | ||
| Station_51_Remodel_Updated_2025_word_2-6-2025.cleaned_(3).pdf | ||
| Registered_Bidder_Information_Sheet_.docx | DOCX document | |
| INDEMNITY_AND_INSURANCE_REQUIREMENTS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lompoc Station 51 Scope of Work Detail
See the attached layout detail for Room Number Reference
Room 1 (Engine Firefighter Dorm), Room 3 (Captains Dorm), A. Retrofit window with dual pane, tinted, opening window. Same or very similar
B. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-
ICON
C. Replace flooring with Paradigm Performer Plus: Hummingbird color
D. Replace ceiling lights with dimmable canned lights
Room 2 (Engineer Dorm)
A. Replace existing French doors with vinyl French doors
B. New floors
C. Replace ceiling lights with dimmable canned lights
Room 4 (Engine Hallway)
A. Retrofit window with dual pane, tinted, opening window. Same or very similar size.
B. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-
ICON
C. Replace flooring with Paradigm Performer Plus: Hummingbird color
D. Replace ceiling lights with dimmable canned lights
Room 5 (Rescue Hallway)
A. Retrofit window with dual pane, tinted, opening window. Same or very similar size.
B. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
C. Replace flooring with Paradigm Performer Plus: Hummingbird color
D. Install dimmer switch for canned lighting
Room 6 (Rescue Engineer Dorm), Room 7 (Rescue Firefighter Dorm)
A. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
B. Replace flooring with Paradigm Performer Plus: Hummingbird color
C. Install station alert light
Room 8 (Battalion Chief Dorm)
A. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
B. Replace flooring with Paradigm Performer Plus: Hummingbird color
C. Replace ceiling lights with dimmable canned lights
Room 9 (Upstairs Main Hallway)
A. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
B. Replace flooring with Paradigm Performer Plus: Hummingbird color
C. Replace ceiling lights with dimmable canned lights
Room 10 (Kitchen) Attached detail with cabinet layout and appliance
A. Remove all current overhead lighting and replace with dimmable canned lighting
B. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
C. Replace flooring with Paradigm Performer Plus: Hummingbird color
D. Replace all electrical outlets and cover plates in the main kitchen area E. Recess gas line into wall behind stove
F. Installation of Stainless-Steel sink, and all fixtures.
G. Replace current window with
H. Replace RO System with upgraded system
I. All new upper and lower custom cabinets, (White, shaker style “Sebring” style)
• ¾” heavy duty cabinets.
• https://www.cabinets.com/kitchen-cabinets/deerfield-collection/sebring-maple-bright-white
J. Stainless steel counter tops
K. Tile Backsplash (subway tiles)
L. Under cabinet lighting
M. Garbage disposal replacement
Room 12 (Stairwell)
A. Replace windows with dual panes, tinted retro to same or very similar size
B. Replace lighting with dimmable can lights
C. Refinish/Replace all handrails. Current uprights may be able to be salvaged, but replacement or refinish of the Handrails is a necessity. Replace/refinish mouldings.
FIRST FLOOR
Training Room
A. Flooring replacement to match current downstairs flooring.
B. Coffee bar with sink, and cut out for mini-fridge, (Cabinetry with bartop allowance, expected plumbing costs and materials).
http://www.cabinets.com/kitchen-cabinets/deerfield-collection/sebring-http://www.cabinets.com/kitchen-cabinets/deerfield-collection/sebring-
Hallway
Hallway
Restroom/Showers
Training Room
Engine Captains
Office
Front Restroom
Fire Marshals
Office
Administrative
Office
Fire Chiefs
Office
Entry/Lobby
North
First Floor Layout
Stairwell connecting upstairs and downstairs
Engine Firefighter
Engine Engineer
Engine Captain
Engine Hallway
5Rescue Hallway
Upstairs Main
Battalion Chiefs Dorm
Kitchen and Dayroom
Rescue Engineer
Dorm
Rescue Firefighter
Dorm
Restroom
II
I I t I •
I
I .
)_ 1
I\ 11 I I
I=
N r b
!----511/"- - ----1 185-/- - - - - - - - - - - =-1-
1---- - -- /8"- - - - - - -+- - - - - 60"l-'--_ _ _ _ _ 25 3 / 4 ..j 1----------1343/-- - - - - - - - 1- - 28"- -++-- 21"71 2b'1 '
I 21 " - -+- - - - - - - - - - - - 1 59 11 4 " - - - - - - - -++ ------------ H
1/ 2"+ 24 "- +-- - --i , 8 "- - - i ,- - - - 1 ·88 3/8"- -+-+-- - 1-+1-1
10 to
---52/" ------------------ o
,a 7 t-- - - 36"- - -1,",.- 15" 8"- - -
1 6 15
I •
-++-- - - - ---+-l J
---------133118-- - --- - - .......- 28" ,, k.. - 22 1 12"
1-- - - - - - - 100 "'- - - - - - - -++-- 37 1/4",, --+ - - --4 8 5/8" ---------------- l
C a b in e t s .co m· MY KITCH EN Top View 9/12/2024 01:46 PM
C-:l HomeByMe
All dim ensions specif ied are in inches. We cannot accept any liability for the accuracy of m easurement syou provide.
Current Kitchen and
Day room Pictures
I ' lea n t,o ice'
Current French Doors in the engineers dorm
Current Training Room
File details come from the government source that posted it. Updated .