Station_51_Remodel_Updated_2025_word_2-6-2025.cleaned_(3).pdf
PDF 8 MB Posted
- Attached to
- Firehouse Renovation 2025
- Solicitation number
- 2025-ITB-017DW
- Issued by
- Santa Barbara County, Long Beach City, California
About this file
This is a Scope of Work document for the City of Lompoc's Firehouse Renovation 2025 project, detailing comprehensive remodeling specifications for Lompoc Station 51. The project encompasses twelve rooms and areas across two floors, including dormitories for firefighters, engineers, captains, and battalion chiefs, as well as common areas such as the kitchen, training room, stairwell, and hallways. Work specifications include window retrofitting with dual-pane tinted glass, baseboard replacement with FLEXCO Base Sculptures (4" height, 3/8" gauge, ICON profile), flooring replacement throughout with Paradigm Performer Plus in Hummingbird color, and lighting upgrades featuring dimmable canned lights. The kitchen remodel is particularly extensive, requiring custom white shaker-style cabinetry (Sebring style), stainless steel countertops and sink with fixtures, subway tile backsplash, under-cabinet lighting, electrical outlet replacement, gas line recessing, RO system upgrade, and garbage disposal replacement. The training room requires flooring replacement and a new coffee bar with cabinetry, sink, and mini-fridge cutout. Bids are due by 2:00 pm on Friday, May 30, 2025, with proposals valid for 90 calendar days after the bid opening date.
The file does not contain information regarding pricing terms, set-asides, contract funding sources, or award dates. The document serves primarily as a detailed technical specification guide with room-by-room work requirements and includes a kitchen layout diagram with precise measurements and current photographs of existing conditions, including French doors and the current training room configuration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Firehouse_Renovation_2025_(Addendum_#3_Revision).pdf | ||
| Station_51_Remodel_Updated_2025_word_2-6-2025.pdf | ||
| Registered_Bidder_Information_Sheet_.docx | DOCX document | |
| INDEMNITY_AND_INSURANCE_REQUIREMENTS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lompoc Station 51 Scope of Work Detail
See the attached layout detail for Room Number Reference
Room 1 (Engine Firefighter Dorm), Room 3 (Captains Dorm), A. Retrofit window with dual pane, tinted, opening window. Same or very similar
B. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-
ICON
C. Replace flooring with Paradigm Performer Plus: Hummingbird color
D. Replace ceiling lights with dimmable canned lights
Room 2 (Engineer Dorm)
A. Replace existing French doors with vinyl French doors
B. New floors
C. Replace ceiling lights with dimmable canned lights
Room 4 (Engine Hallway)
A. Retrofit window with dual pane, tinted, opening window. Same or very similar size.
B. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-
ICON
C. Replace flooring with Paradigm Performer Plus: Hummingbird color
D. Replace ceiling lights with dimmable canned lights
Room 5 (Rescue Hallway)
A. Retrofit window with dual pane, tinted, opening window. Same or very similar size.
B. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
C. Replace flooring with Paradigm Performer Plus: Hummingbird color
D. Install dimmer switch for canned lighting
Room 6 (Rescue Engineer Dorm), Room 7 (Rescue Firefighter Dorm)
A. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
B. Replace flooring with Paradigm Performer Plus: Hummingbird color
C. Install station alert light
Room 8 (Battalion Chief Dorm)
A. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
B. Replace flooring with Paradigm Performer Plus: Hummingbird color
C. Replace ceiling lights with dimmable canned lights
Room 9 (Upstairs Main Hallway)
A. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
B. Replace flooring with Paradigm Performer Plus: Hummingbird color
C. Replace ceiling lights with dimmable canned lights
Room 10 (Kitchen) Attached detail with cabinet layout and appliance
A. Remove all current overhead lighting and replace with dimmable canned lighting
B. Replace baseboards with FLEXCO Base Sculptures 4” height 3/8” gauge, Profile-ICON
C. Replace flooring with Paradigm Performer Plus: Hummingbird color
D. Replace all electrical outlets and cover plates in the main kitchen area E. Recess gas line into wall behind stove
F. Installation of Stainless-Steel sink, and all fixtures.
G. Replace current window with
H. Replace RO System with upgraded system
I. All new upper and lower custom cabinets, (White, shaker style “Sebring” style)
• ¾” heavy duty cabinets.
• https://www.cabinets.com/kitchen-cabinets/deerfield-collection/sebring-maple-bright-white
J. Stainless steel counter tops
K. Tile Backsplash (subway tiles)
L. Under cabinet lighting
M. Garbage disposal replacement
Room 12 (Stairwell)
A. Replace windows with dual panes, tinted retro to same or very similar size
B. Replace lighting with dimmable can lights
C. Refinish/Replace all handrails. Current uprights may be able to be salvaged, but replacement or refinish of the Handrails is a necessity. Replace/refinish mouldings.
FIRST FLOOR
Training Room
A. Flooring replacement to match current downstairs flooring.
B. Coffee bar with sink, and cut out for mini-fridge, (Cabinetry with bartop allowance, expected plumbing costs and materials).
Hallway
Hallway
Restroom/Showers
Training Room
Engine Captains
Office
Front Restroom
Fire Marshals
Office
Administrative
Office
Fire Chiefs
Office
Entry/Lobby
North
First Floor Layout
Stairwell connecting upstairs and downstairs
Engine Firefighter
Engine Engineer
Engine Captain
Engine Hallway
5Rescue Hallway
Upstairs Main
Battalion Chiefs Dorm
Kitchen and Dayroom
Rescue Engineer
Dorm
Rescue Firefighter
Dorm
Restroom
II
I I t I •
I
I .
)_ 1
I\ 11 I I
I=
N r b
!----511/"- - ----1 185-/- - - - - - - - - - - =-1-
1---- - -- /8"- - - - - - -+- - - - - 60"l-'--_ _ _ _ _ 25 3 / 4 ..j 1----------1343/-- - - - - - - - 1- - 28"- -++-- 21"71 2b'1 '
I 21 " - -+- - - - - - - - - - - - 1 59 11 4 " - - - - - - - -++ ------------ H
1/ 2"+ 24 "- +-- - --i , 8 "- - - i ,- - - - 1 ·88 3/8"- -+-+-- - 1-+1-1
10 to
---52/" ------------------ o
,a 7 t-- - - 36"- - -1,",.- 15" 8"- - -
1 6 15
I •
-++-- - - - ---+-l J
---------133118-- - --- - - .......- 28" ,, k.. - 22 1 12"
1-- - - - - - - 100 "'- - - - - - - -++-- 37 1/4",, --+ - - --4 8 5/8" ---------------- l
C a b in e t s .co m· MY KITCH EN Top View 9/12/2024 01:46 PM
C-:l HomeByMe
All dim ensions specif ied are in inches. We cannot accept any liability for the accuracy of m easurement syou provide.
Current Kitchen and
Day room Pictures
I ' lea n t,o ice'
Current French Doors in the engineers dorm
Current Training Room
File details come from the government source that posted it. Updated .