Statesboro CIP 2028_2032 28_32.pdf
PDF 3 MB Posted
- Attached to
- Airport Consulting Services - Planning
- Solicitation number
- PE-61600-NONST-2027-000000066
- Issued by
- Brooks County, Georgia
About this file
This document is a Capital Improvement Plan (CIP) for Statesboro-Bulloch County Airport (TBR) located in Statesboro, Georgia, prepared in November 2026. The plan outlines a series of infrastructure and facility improvements scheduled from 2028 through 2032, including runway crack seal and marking, airfield perimeter fencing design and construction, T hangar development in design and construction phases, access road design and construction, runway 14-32 approach area drainage improvements, Phase I environmental assessment, and electrical charger installation and design. The projects span multiple years with distinct design and construction phases, allowing for phased implementation of airport improvements over the five-year planning period.
The CIP document does not contain specific information regarding pricing terms, contract amounts, funding sources, set-asides, bid due dates, or other procurement-specific details. The plan serves as a strategic capital improvement roadmap for the airport authority rather than a detailed procurement specification or request for proposal. Additional procurement documents would be required to establish contract terms, pricing, funding mechanisms, and bidding procedures for individual projects identified in this capital improvement plan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statesboro CIP FY 2028_2032 Spreadsheet final.pdf | ||
| Airport Consultant SOQ _ Planning.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
PHASE I ENVIRONMENTAL ASSESSMENT2032
2032 AIRFIELD PERIMETER FENCING - CONSTRUCTION
RUNWAY "6" APPROACH AREA DRAINAGE IMPROVEMENTS - DESIGN2032
ELECTRICAL CHARGER (2) - DESIGN & CONSTRUCTION2031
AIRFIELD PERIMETER FENCING - DESIGN2031
T HANGAR DEVELOPMENT - CONSTRUCTION2031
RUNWAY 14-32 CRACK SEAL AND MARKING - DESIGN & CONSTRUCTION2030
T HANGAR DEVELOPMENT - DESIGN2030
ACCESS ROAD - CONSTRUCTION2029
ACCESS ROAD - DESIGN 2028
SCALE:
DATE:
JOB NUMBER:AIRPORT CAPITAL IMPROVEMENT PLAN
STATESBORO-BULLOCH COUNTY AIRPORT (TBR)
STATESBORO, GA
NOVEMBER, 2026
NTS
N/A
T 706.303.3272
G M C N E T W O R K . C O M
Augusta, GA 30901
801 Broad St, Suite 900
© 2026 Microsoft Corporation © Maxar ©CNES (2026) Distribution Airbus DS © Mapbox
File details come from the government source that posted it. Updated .