Statesboro CIP 2028_2032 28_32.pdf
PDF 3 MB Posted
- Attached to
- Airport Consulting Services - Engineering
- Solicitation number
- PE-61600-NONST-2027-000000067
- Issued by
- Brooks County, Georgia
About this file
This document is an Airport Capital Improvement Plan (CIP) for the Statesboro-Bulloch County Airport (TBR) located in Statesboro, Georgia, prepared by GMC Network in November 2026. The plan outlines a five-year capital improvement schedule spanning 2028 through 2032, detailing multiple airport infrastructure projects at various stages of development and construction. The projects include an access road design in 2028, access road construction in 2030, T-Hangar development design in 2030 and construction in 2031, Runway 14-32 crack seal and marking in 2031, airfield perimeter fencing design in 2031 and construction in 2032, electrical charger installation in 2032, runway approach area drainage improvements design in 2032, and a Phase I environmental assessment in 2032. The plan presents these initiatives in a visual map format with a legend identifying each project's timeline and scope.
The document does not specify pricing terms, funding sources, set-asides, contract award dates, term lengths, or other financial details. No information regarding incumbent contractors, bidder meetings, site visits, or response deadlines is included in this capital improvement plan document. The plan appears to be a strategic planning document rather than a formal solicitation or contract award notice, serving as a high-level overview of the airport's infrastructure development priorities over the designated five-year period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statesboro CIP FY 2028_2032 Spreadsheet final.pdf | ||
| Airport Consultant SOQ _ Engineering.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
PHASE I ENVIRONMENTAL ASSESSMENT2032
2032 AIRFIELD PERIMETER FENCING - CONSTRUCTION
RUNWAY "6" APPROACH AREA DRAINAGE IMPROVEMENTS - DESIGN2032
ELECTRICAL CHARGER (2) - DESIGN & CONSTRUCTION2031
AIRFIELD PERIMETER FENCING - DESIGN2031
T HANGAR DEVELOPMENT - CONSTRUCTION2031
RUNWAY 14-32 CRACK SEAL AND MARKING - DESIGN & CONSTRUCTION2030
T HANGAR DEVELOPMENT - DESIGN2030
ACCESS ROAD - CONSTRUCTION2029
ACCESS ROAD - DESIGN 2028
SCALE:
DATE:
JOB NUMBER:AIRPORT CAPITAL IMPROVEMENT PLAN
STATESBORO-BULLOCH COUNTY AIRPORT (TBR)
STATESBORO, GA
NOVEMBER, 2026
NTS
N/A
T 706.303.3272
G M C N E T W O R K . C O M
Augusta, GA 30901
801 Broad St, Suite 900
© 2026 Microsoft Corporation © Maxar ©CNES (2026) Distribution Airbus DS © Mapbox
File details come from the government source that posted it. Updated .