Statement of Work_Washer.pdf
PDF 93 KB Posted
- Attached to
- Washer/decontamination Unit
- Solicitation number
- FA860126Q0131
About this file
This is a Statement of Work (SOW) for the procurement, installation, and support of washer/decontamination units for the 88th Medical Group's Sterile Processing Department at Wright-Patterson Air Force Base, Ohio.
The contractor shall deliver a complete, turn-key integrated system consisting of four (4) STERIS AMSCO 7052HP mechanical washer/disinfector units, an automated conveyor and handling system, and required accessories and supplies. Each washer unit must feature a cabinet-mounted, multi-level design with minimum chamber dimensions of 26" x 24" x 24", a single vertical-sliding power door with tempered glass observation window, pre-programmed cleaning cycles (pre-wash, wash/cleaning, rinse, thermal rinse/disinfection), and a specialized factory-installed Robotic-Assisted Surgery (RAS) cleaning cycle. The units must operate on 208V, 3-phase, 60 Hz electrical supply utilizing facility-supplied steam, incorporate an integrated microcomputer with audible/visual alert capabilities, and include an integrated thermal printer for cycle documentation. The automated conveyor system must provide single-point-of-management transport with non-motorized feed-out and motorized return door modules, full integration with washer units, and auto-docking transfer cart adapters. Required accessories include 2 RAS 12-Racks, 5 three-level manifold racks, 2 two-level manifold racks, 9 short auto-lock transfer carts, bar code tag holders, instrument tags, and all installation kits with flexible hoses and drain connections.
The contractor is responsible for complete project design, de-installation and disposal of four existing washer units, installation labor (including evening/weekend hours to minimize clinical disruption), comprehensive on-site training for Sterile Processing Department and Biomedical Equipment Maintenance personnel with written materials provided, and a 1-Year Preventive Care Connect service plan covering preventative maintenance, safety tests, calibrations, and unscheduled repairs. The contractor must provide 24/7 technical support via telephone and guarantee on-site response by a qualified technician within 24 hours of equipment failure notification, with full system operability restored within 48 hours of initial on-site response. All equipment shall be shipped F.O.B. Destination to Wright-Patterson AFB, OH 45433, with all shipping, handling, and insurance costs included. The contractor must comply with all installation entry and delivery procedures for Wright-Patterson AFB, including processing through the Commercial Vehicle Delivery Gate (CVDG).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT CONTRACT.pdf | ||
| REQUIRED INFORMATION SHEET.docx | DOCX document | |
| Washer- BRAND NAME-redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for
Washer/Decontamination Units
1.Background:
The 88th Medical Group, Sterile Processing Department (SPD) has a mission-critical requirement to replace its failing and obsolete washer/decontamination equipment. The current systems are reaching the end of their service life, leading to increased maintenance and a risk to operational readiness. To ensure the highest standards of infection control and maintain continuous support for surgical services, the facility requires a modern, fully integrated decontamination and transport system. This project involves the procurement and installation of new mechanical washer/decontamination units and an automated conveyor system to streamline the sterile processing workflow, enhance efficiency, and ensure the safe, effective cleaning of reusable medical devices.
2. Scope:
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to deliver, install, and validate a complete, turn-key washer and conveyor system. The scope includes the de-installation and disposal of existing legacy equipment, installation of the new systems, integration, testing, training, and a first-year preventative maintenance service plan.
3. Minimum Technical Requirements:
The integrated system must meet or exceed the following minimum technical requirements:
3.1 Mechanical Washer/Decontamination Units (Quantity: 4)
• Must be a cabinet-mounted, multi-level, mechanical washer/disinfector (STERIS
AMSCO 7052HP)
• Physical Configuration:
• Chamber must have minimum dimensions of 26" x 24" x 24".
• Must feature a single, vertical-sliding power door with a tempered glass window for observation.
• Performance and Cycles:
• Must feature pre-programmed cycles, including at a minimum: pre-wash, wash/cleaning, rinse, and thermal rinse/disinfection.
• Must include a specialized, factory-installed Robotic-Assisted Surgery (RAS) Cleaning Cycle for processing complex robotic instruments.
• Utilities and Power:
• Must be configured to operate on a 208V, 3-phase, 60 Hz electrical supply.
• Must be designed to utilize facility-supplied steam.
• Control and Documentation:
• Must be controlled by an integrated microcomputer that monitors and controls all unit operations and provides audible/visual alerts for deviations.
• Must include an integrated Thermal Printer to document and record the performance of every cycle for quality assurance.
3.2 Automated Conveyor & Handling System
• The system must provide automated, single-point-of-management transport of washer racks from the decontamination side to the clean processing side.
• Must include a Non-Motorized Feed-Out section and a Motorized Return Door module to facilitate a complete, ergonomic workflow.
• System must be fully integrated and compatible with the washer units to ensure seamless transfer of racks.
• Must include Auto Docking Transfer Cart Adapters to interface with the new washer units and existing transfer carts.
3.3 Required Supplies & Accessories
• The contractor shall provide all necessary accessories for a fully functional system, including but not limited to:
• Robotic Assisted Surgery (RAS) 12-Racks (Quantity: 2)
• 3-Level Manifold Racks (Quantity: 5)
• 2-Level Manifold Racks (Quantity: 2)
• Short, Auto-Lock Transfer Carts (Quantity: 9)
• Bar Code Tag Holders and Instrument Tags
• All necessary installation kits, flexible hoses, and drain connection kits.
4. Services
4.1 Installation and Project Management:
• Contractor shall provide complete project design, program planning, and coordination support services.
• De-installation and Disposal: The contractor is responsible for the de-installation and proper disposal of the four (4) existing washer units.
• Installation: Contractor shall perform all rigging, placement, assembly, and utility connections for the new washers and conveyor system in accordance with manufacturer specifications. Installation labor may occur during evening/weekend hours to minimize disruption to clinical operations.
4.2 Training:
• Contractor shall provide comprehensive, on-site initial training for all SPD and Biomedical Equipment Maintenance personnel on the operation, daily maintenance, and troubleshooting of the complete system.
• Training materials, including written operating instructions, must be provided.
4.3 Maintenance and Warranty:
• The system shall include a 1-Year Preventive Care Connect service plan, covering all preventative maintenance, safety tests, calibrations, and unscheduled repairs for the first 12 months post-installation.
• The contractor must provide 24/7 technical support via telephone.
• For any reported equipment failure, a qualified service technician must be on-site within 24 hours of notification, with the system repaired and fully operational within 48 hours of the initial on-site response.
5. Delivery
• Lead Time: The contractor shall deliver all equipment and components within the timeline agreed upon at contract award.
• Shipping: All equipment shall be shipped F.O.B. Destination to the 88th Medical Group, Wright-Patterson AFB, OH 45433. All shipping, handling, and insurance costs shall be included. The contractor must comply with all installation entry and delivery procedures for Wright-Patterson AFB, including processing through the Commercial Vehicle Delivery Gate (CVDG) as required.
File details come from the government source that posted it. Updated .