This Statement of Work (SOW) details the procurement of two Vertical Rise Scissor Platform vehicle lifts for Tyndall Air Force Base. The vehicle lifts must have a minimum 14,000-pound capacity, drive-through capability with ramps, 40-inch runway distance, internal air kit, light kit, two 7,000-pound rotary rolling bridge jacks, and specific dimensional requirements including a raised height of 72.75 inches and lowered height of 10.75 inches. The lifts require 230-volt power and must include installation, training, and warranty.

The contractor must complete all requirements within 100 calendar days of contract award, with delivery between 0700-1400 local time, excluding holidays and weekends. Installation must be performed by manufacturer-certified installers to maintain warranties. The vendor will provide a minimum 1-year warranty for parts and labor, and deliver the equipment to the 325 LRS/LGRV at Tyndall AFB. This is a 100% Small Business Set-Aside acquisition with a NAICS code of 333921, and quotes are due by July 15, 2025, at 1:00 PM CST.

View the file

Other files for this federal contract opportunity

Other files attached to Vertical Rise Scissor Platform Lift, newest first.
File Type Posted
Questions and Answers.docx DOCX document
Statement of Work Vert Rise Scissor Platform lift-Updated.pdf PDF
Solicitation Amendment FA481925Q00290001 SF 30.pdf PDF
Solicitation - FA481925Q0029.pdf PDF
Appendix 1- Floor plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

INSTALLATION OF A VERTICAL RISE SCISSOR PLATFORM IN VEHICLE

MAINTENANCE BUILDING

Tyndall AFB, FL 32403

26 June 2025

STATEMENT OF WORK

TABLE OF CONTENTS

SECTION PAGE

1 DESCRIPTION OF SERVICES 3

2 WORK REQUIREMENTS 3

3 WARRANTY REQUIREMENTS 4

4 PERIOD OF PERFORMANCE 4

5 DELIVERY 4

6 ATTACHMENTS 4

1. DESCRIPTION OF SERVICES

The contractor shall provide product, materials and any required rental vehicles and/or equipment to install, test/certify 2 each Vertical Rise Scissor Platform vehicle lifts per industry standards. Additionally, that must provide all warranty documentation and required training.

2. WORK REQUIREMENTS

2.1 Vehicle Lift. The system shall include the following:

• Minimum 14,000-pound capacity

• Drive through capable with ramps on both ends (suitable for a standard sedan to be able to drive on and off)

• Distance between runways 40 inches

• Internal Air Kit

• Light kit to illuminate the entire under carriage of the vehicle

• Two each per lift: Rotary rolling bridge jack with 7,000 pound capacity.

• Air/hydraulic operation

• Runway length 198 to 210 inches

• Folding ramps with rear chocks

• Safety Tape Switches are required to protect technicians when raising and lowering

• Minimum raised height of 72.75 inches

• Maximum lowered height of 10.75 inches

• Power requirements 230 volts

• Instillation, training and rental equipment fee must be included

• Warranty provided by company/industry standards

2.2 On-Site Installation, Startup and Training.

The contractor will be responsible for offloading the equipment upon delivery. The contractor will perform the complete assembly of the vehicle lift, utilizing qualified installers.

INSTALLER(S) MUST BE CERTIFIED by the manufacture of the equipment so that the manufacture warranties are not voided, and the equipment is installed correctly. The contractor shall reference the installation/floor plan drawings in Appendix 1.

-The contractor shall perform initial startup and training.

-The contractor shall provide a Startup checklist.

3. WARRANTY

Vendors shall provide the Government with a warranty consistent with standard commercial practice. At a minimum, the contractor shall provide a 1-year warranty for parts and labor including installation.

4. PERIOD OF PERFORMANCE

The contractor shall complete all requirements of this Statement of Work within 100 calendar days of contract award.

5. DELIVERY.

The contractor shall ensure delivery between 0700 and 1400 local time excluding holidays and weekends.

6. ATTACHMENTS:

Appendix 1- Installation/floor plan drawings.

Deliver to

325 LRS/LGRV

Attn: Mr. Mark Harrell Phone Work 850-283-9459 404 Louisiana Ave B#1152M Tyndall AFB FL 32403