Statement of Work Two Post Lift.pdf
PDF 139 KB Posted
- Attached to
- FA4626-26-Vehicle Post Lifts
- Solicitation number
- FA462626Q0032
About this file
Statement of Work Summary: Two-Post Lift Replacement
This Statement of Work outlines the replacement of two two-post vehicle lifts for the Air Force Global Strike Command, specifically the 341st Missile Wing Logistics Readiness Squadron, Vehicle Management at Malmstrom Air Force Base. The contractor must provide two new (not refurbished or used) two-post lift assemblies with a minimum 30,000 lbs lift capacity, ALI GOLD CERTIFICATION, and on-site vendor service capability within 24-72 hours of notification, with an absolute maximum response time of five business days. The lift assemblies must include specific components: 4-inch sealed steel roller bearings, structural 7/8-inch fork and lift mast channel, three-stage telescopic multi-position arms with single lock, automatic mechanical load holding device, emergency stop on control panel, two 3-horsepower motors, 1-inch thick steel bolster plate, complete electrical wiring and hydraulic oil, electronically operated control interface, and complete paint finish with markings. All components must be new and fully functional upon delivery and installation.
The contractor must provide a firm-fixed price covering all materials, components, and warranty requirements. Warranty terms include a minimum 25-year warranty on structural components, 2-year warranty on hydraulic components, and lifetime warranty on carriage bearings. The contractor must submit a post-installation sustainment and maintenance plan detailing how comprehensive maintenance, repair, and annual ALI certification services will be provided throughout the warranty period, including confirmation that local or dispatched technicians are authorized to perform both certifications and repairs. Delivery, inspection, and acceptance will be conducted by a representative from the 341st Missile Wing Logistics Readiness Squadron, Vehicle Management, and delivery terms will be specified in the awarded contract and any applicable modifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Two-post Lift Replacement
1.0 Scope
The seller shall provide two (2) new two post lifts with all associated components required and including old lift removal & lift installation in our shop. All work and materials shall meet the requirements outlined in this Statement of Work (SOW).
2.0 Applicable Parties
Purchaser: Air Force Global Strike Command (U.S. Government)
Receiving Unit: 341st Missile Wing, Logistics Readiness Squadron, Vehicle
Management
Contractor: Referred to as “the seller” throughout this document
3.0 Requirements
3.1 Two Post Lifts
The seller shall provide two (2) new (not refurbished, rebuilt, or used) two-post lift assembly, with a minimum lift capacity of 30,000 lbs, that meets the following requirements:
Must be ALI GOLD CERTIFIED
Must be able to be serviced/repaired by a vender on-site at Malmstrom AFB within 24-72 hours of notification. Absolute maximum allowable on-site response time shall not exceed five (5) business days.
3.2 Included Components
The lift assembly shall include, at minimum:
4" sealed steel roller bearings
Structural 7/8” fork, lift mast channel
No Equalization Cables or Structural Overhead Beams
Three-stage telescopic, multi position, single lock, low profile arms
Automatic mechanical load holding locking device
Emergency Stop on control panel
Two 3hp motors
1in thick steel bolster plate
All required electrical wiring and hydraulic oil
Electronically operated control interface
Complete paint finish with markings
All components must be new and fully functional upon delivery and installation.
4.0 Warranty
The manufacturer shall provide a minimum 25-year warranty covering structural components, 2-year warranty on hydraulic components, and lifetime warranty on the carriage bearings.
5.0 Post-Installation Sustainment & Maintenance Plan
With their proposal, the Contractor will include a sustainment plan describing how they will ensure that comprehensive maintenance, repair and annual certification services are available for the two-post lifts for the duration of the warranty and confirm if local/dispatched technicians are authorized to perform both ALI certifications and repair services.
6.0 Pricing
The seller shall provide the total contract cost as one firm-fixed price covering all materials, components, and warranty requirements described in this SOW.
7.0 Inspection and Acceptance
A representative from the 341st Missile Wing Logistics Readiness Squadron, Vehicle
Management, will inspect the delivered lift assemblies prior to acceptance.
Acceptance will occur only after the product is verified to meet all specifications in this
SOW.
7.0 Delivery
Delivery terms, schedule, and location shall be in accordance with the awarded contract and any applicable modifications.
File details come from the government source that posted it. Updated .