Statement of Work Two Post Lift.3Jun26.pdf

PDF 139 KB Posted

Attached to
FA4626-26-Vehicle Post Lifts
Solicitation number
FA4626-26-Q-XVPL
Issued by

About this file

This is a Statement of Work (SOW) for the procurement of two new two-post vehicle lifts by Air Force Global Strike Command's 341st Missile Wing, Logistics Readiness Squadron, Vehicle Management at Malmstrom Air Force Base. The seller must provide two new (not refurbished, rebuilt, or used) two-post lift assemblies with a minimum lift capacity of 30,000 lbs, ALI GOLD CERTIFICATION, and the capability to be serviced or repaired by an on-site vendor within 24-72 hours of notification, with an absolute maximum response time of five business days. The lift assemblies must include specific components: 4-inch sealed steel roller bearings, structural 7/8-inch fork lift mast channel, three-stage telescopic multi-position single lock low-profile arms, automatic mechanical load holding locking device, emergency stop on control panel, two 3hp motors, 1-inch thick steel bolster plate, all required electrical wiring and hydraulic oil, electronically operated control interface, and complete paint finish with markings. All components must be new and fully functional upon delivery and installation.

The contractor must provide warranty coverage consisting of a minimum 25-year warranty on structural components, 2-year warranty on hydraulic components, and lifetime warranty on carriage bearings. The contractor must also submit a post-installation sustainment and maintenance plan describing how comprehensive maintenance, repair, and annual certification services will be available for the duration of the warranty and confirming whether local or dispatched technicians are authorized to perform both ALI certifications and repair services. Pricing shall be submitted as one firm-fixed price covering all materials, components, and warranty requirements. A representative from the 341st Missile Wing Logistics Readiness Squadron, Vehicle Management will inspect the delivered lift assemblies prior to acceptance, with acceptance occurring only after verification that all specifications are met. Delivery terms, schedule, and location will be in accordance with the awarded contract and any applicable modifications.

View the file

Other files

File Type Posted
Sources Sought Two Post Lifts.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

Two-post Lift Replacement

1.0 Scope

The seller shall provide two (2) new two post lifts with all associated components required and including old lift removal & lift installation in our shop. All work and materials shall meet the requirements outlined in this Statement of Work (SOW).

2.0 Applicable Parties

Purchaser: Air Force Global Strike Command (U.S. Government)

Receiving Unit: 341st Missile Wing, Logistics Readiness Squadron, Vehicle

Management

Contractor: Referred to as “the seller” throughout this document

3.0 Requirements

3.1 Two Post Lifts

The seller shall provide two (2) new (not refurbished, rebuilt, or used) two-post lift assembly, with a minimum lift capacity of 30,000 lbs, that meets the following requirements:

Must be ALI GOLD CERTIFIED

Must be able to be serviced/repaired by a vender on-site at Malmstrom AFB within 24-72 hours of notification. Absolute maximum allowable on-site response time shall not exceed five (5) business days.

3.2 Included Components

The lift assembly shall include, at minimum:

4" sealed steel roller bearings

Structural 7/8” fork, lift mast channel

No Equalization Cables or Structural Overhead Beams

Three-stage telescopic, multi position, single lock, low profile arms

Automatic mechanical load holding locking device

Emergency Stop on control panel

Two 3hp motors

1in thick steel bolster plate

All required electrical wiring and hydraulic oil

Electronically operated control interface

Complete paint finish with markings

All components must be new and fully functional upon delivery and installation.

4.0 Warranty

The manufacturer shall provide a minimum 25-year warranty covering structural components, 2-year warranty on hydraulic components, and lifetime warranty on the carriage bearings.

5.0 Post-Installation Sustainment & Maintenance Plan

With their proposal, the Contractor will include a sustainment plan describing how they will ensure that comprehensive maintenance, repair and annual certification services are available for the two-post lifts for the duration of the warranty and confirm if local/dispatched technicians are authorized to perform both ALI certifications and repair services.

6.0 Pricing

The seller shall provide the total contract cost as one firm-fixed price covering all materials, components, and warranty requirements described in this SOW.

7.0 Inspection and Acceptance

A representative from the 341st Missile Wing Logistics Readiness Squadron, Vehicle

Management, will inspect the delivered lift assemblies prior to acceptance.

Acceptance will occur only after the product is verified to meet all specifications in this

SOW.

7.0 Delivery

Delivery terms, schedule, and location shall be in accordance with the awarded contract and any applicable modifications.

File details come from the government source that posted it. Updated .