This is a Statement of Work (SOW) for the manufacture, qualification, inspection, and delivery of MK-82 Motor Adapter Seal Assemblies (Part Number 5974788 Rev L), dated May 28, 2026. The work supports the Naval Surface Warfare Center (NSWC) Crane Division, which serves as the designated overhaul point for the MK-82 Director, a subsystem of the MK-99 Fire Control System. The contractor must furnish all equipment, parts, and labor necessary to manufacture the Seal Assembly and is responsible for all shipment logistics to and from NSWC Crane, Building 3168. Deliverables include marking per MIL-STD-129P, equipment identification per MIL-STD-130N, and packaging per drawing 5974788 paragraph 5.1.
Testing requirements mandate vendor-provided reports and data per drawing 5974788 paragraphs 4.2.5, 4.2.6, and 4.2.8, with results documented in a Test Inspection Report (CDRL A002). The contractor must provide Certificates of Compliance (CDRL A003) for each manufactured item and submit a Technical Data Package (CDRL A001) and any Engineering Change Proposals (CDRL A004) for deviations due to obsolescence or diminished manufacturing sources. Quality requirements include compliance with FAR 46.202-4 higher-level contract quality requirements, with provisions for monitoring critical processes, continuous improvement, and root cause analysis. All manufactured subassemblies must meet specification drawings, use only approved vendor-manufactured parts, maintain "Like New" appearance, and any workmanship defects or transportation damage must be reworked at no additional cost to the Government. Government inspection and acceptance will occur at destination within a 30-day acceptance period for item-level inspection and verification testing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION STATEMENT A. Approved for public release: distribution is unlimited.
STATEMENT OF WORK
MK-82 MOTOR ADAPTER SEAL ASSEMBLY
28-May-2026
1. BACKGROUND AND SCOPE
This Statement of Work (SOW) establishes the requirements for the manufacture, qualification, inspection, and delivery of the Rate Integrating Gyroscope, MIL-G-81168/ 5B used in the MK-82
Gun and Guided Missile Director. Naval Surface Warfare Center (NSWC) Crane Division is the designated overhaul point for the MK-82 Director, a subsystem of the MK-99 Fire Control
System (FCS).
2 APPLICABLE DOCUMENTS
5974788 Rev L Assembly, Seal
3 REQUIREMENTS
3.1 General Requirements:
3.1.1 The contractor shall furnish all equipment, parts, and labor necessary to manufacture the
Seal Assembly (PN 5974788)
3.1.2 The contractor shall be responsible for shipment of all manufactured MK-82 Motor
Adapter Seal Assemblies to and from NSWC Crane, Building 3168.
3.1.3 For Motor Adapter Seal Assemblies to be delivered to the Government, the contractor shall perform marking for shipment and storage processes using MIL-STD-129P.
3.1.4 For Motor Adapter Seal Assemblies to be delivered to the Government, the contractor shall apply equipment markings and identification processes using MIL-STD-130N.
3.1.5 In the event it is necessary to deviate from the drawings provided based on obsolescence or diminished manufacturing sources and material shortages (DMSMS). The contractor shall formally request the change in an engineering change proposal (ECP) and submit it to the government for approval. The government will require adequate time to review ECPs based on the magnitude of the change. Furthermore, an updated technical drawing package reflecting the changes must be provided to the government. (CDRL A001, Technical Data
Package; CDRL 0004, Engineering Change Proposal)
3.1.6 For Motor Adapter Seal Assemblies to be delivered to the Government, the contractor shall package IAW drawing number 5974788 paragraph 5.1
3.2 Testing Requirements
3.2.1 5974788 – Seal Assembly (CDRL A002, Test Inspection Report)
3.2.1.1 Vendor shall provide all reports/data per drawing number 5974788 Paragraph 4.2.5
3.2.1.2 Vendor shall provide all reports/data per drawing number 5974788 Paragraph 4.2.6
3.2.1.3 Vendor shall provide all reports/data per drawing number 5974788 Paragraph 4.2.8
3.3 Component Certifications
3.3.1 As specified in the drawing specifications of each assemblies’ components, certificates of conformance shall be delivered to the government with each order.
3.3.2 Contractor shall inspect each manufactured item and/or purchased item against drawings/specifications, and shall provide a Certificate of Compliance (COC) to document conformance of each hardware item with item drawings/specifications. The contractor shall provide a hard copy of the COC with each hardware item produced IAW with this SOW. Contractor shall make electronic copies of the COCs available to the
Government upon request. (CDRL A003, Certificate of Compliance)
4 GOVERNMENT FURNISHED ITEMS
4.1 GOVERNMENT FURNISHED INFORMATION (GFI): The documents/drawings listed in section 2 of this SOW will be provided along with associated part lists and subassembly drawings owned by the government.
4.2 GOVERNMENT FURNISHED MATERIAL (GFM): The Government will not provide any manufacturing, parts or materials for this tasking.
5 DATA DELIVERABLES
The contractor shall submit the following data deliverables shall in accordance with the requirements listed in the Contractor Data Requirements Lists (CDRLs).
CDRL: A001
DID Number: DI-SESS-80776A
DID Title: Technical Data Package
DID Sub-Title: Manufacturing Technical Data Package
SOW Paragraph: 3.1.5
CDRL: A002
DID Number: DI-NDTI-80809B
DID Title: Test Inspection Report
DID Sub-Title: Test Report
SOW Paragraph: 3.2.1
CDRL: A003
DID Number: DI-MISC-81356A
DID Title: Certificate of Compliance
DID Sub-Title: Component Certificate of Compliance
SOW Paragraph: 3.3.2
CDRL: A004
DID Number: DI-SESS-80639D
DID Title: Engineering Change Proposal (ECP)
DID Sub-Title: Manufacturing ECP
SOW Paragraph: 3.1.5
6 SPECIAL CONDITIONS
6.1 Inspection and Acceptance.
6.1.1 Manufactured Components: Inspection and acceptance will be conducted at destination by the Government Quality Acceptance Representative or other designated
Government representative. An acceptance period of 30 days will be required for delivery of manufactured subassemblies for item level inspection and Government verification testing.
6.2 Place of Performance - The work under this contract shall be performed at the prime contractor’s facility, and/or subcontractor facilities as designated in this SOW.
6.3 Quality:
6.3.1 Quality Program: The contractor shall have a quality program that is compliant with
FAR 46.202-4 Higher-level contract quality requirements, or meets the following requirements: monitor and control critical processes; continuously improve processes;
establish mechanisms for performance feedback; and maintain an effective root cause analysis and corrective action system.
6.3.2 Quality Assurance. The contractor shall ensure each manufactured subassembly meets all specifications IAW the applicable drawings and subsequent referenced documents.
The contractor shall ensure that only approved vendor manufactured parts were used to fulfill requirements of this SOW. The contractor shall ensure that each manufactured assembly has a
“Like New” appearance. Workmanship defects and/or transportation damage found upon delivery to the Government will not be accepted. Workmanship defects and/or transportation damage shall be reworked by the contractor at no additional cost to the Government.
File details come from the government source that posted it. Updated .