Statement of Work (SOW) Bobcat Repair.pdf
PDF 179 KB Posted
- Solicitation number
- 31040RFQ260001463
About this file
This is a Statement of Work (SOW) for comprehensive repair and maintenance services on one government-owned Bobcat T870 Compact Track Loader located at USCG Base Portsmouth, Virginia.
The contractor must provide certified labor, tooling, parts, materials, and transportation to pick up the equipment from USCG Base Portsmouth (4000 Coast Guard Blvd, Portsmouth, VA 23703), perform diagnostics, replace the hydraulic pump and final drive assemblies, conduct complete hydraulic system flushing and calibration to Original Equipment Manufacturer (OEM) specifications, perform full operational load testing, and deliver the fully certified machine back to the base. The scope includes three primary tasks: (1) round-trip transportation using DOT-compliant vehicles and certified operators; (2) comprehensive diagnostic assessment of hydraulic and drive systems with submission of a detailed Report of Findings and cost estimate for any additional faulty components requiring authorization via contract modification; and (3) overhaul/repair/replacement of primary components, full contamination control flushing of all hydraulic lines and reservoir, replacement of all hydraulic filters with new OEM filters, system refill with manufacturer-approved fluid, full electronic and hydrostatic calibrations, and certified operational load testing. The contractor must provide a minimum one-year warranty covering all parts and labor. The contract period of performance must not exceed 90 working days after award. All work must comply with federal safety regulations (29 CFR 1910 and 1926), environmental regulations (40 CFR), and USCG Base Portsmouth security and facility requirements. The project manager must be available to the Quality Assurance Evaluator (QAE) via telephone between 0700 and 1530 EST Monday through Friday, responding to technical issues within 24 hours. All written reports must be provided in electronic format compatible with Microsoft Office Applications. Travel and all facilities, materials, and equipment are contractor-furnished and included in overall project costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| SF-30 solicitation cancellation.pdf | ||
| SF-18.pdf | ||
| Poster SCA Poster.pdf | ||
| RFQ .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1/5
STATEMENT OF WORK (SOW)
FOR
Bobcat T870 Compact Track Loader Repair
1.0 GENERAL
1.1 SCOPE
The Contractor shall provide all necessary personnel, certified labor, tooling, parts, materials, and transportation required to perform comprehensive repair and maintenance services on one
(1) government-owned Bobcat T870 Compact Track Loader. The scope includes picking up the equipment from USCG Base Portsmouth (4000 Coast Guard Blvd, Portsmouth, VA 23703), replacing the hydraulic pump and final drive assemblies. The Contractor shall execute a complete hydraulic system flushing and system calibration to Original Equipment Manufacturer (OEM) specifications. Following successful testing, the Contractor shall deliver the fully certified machine back to USCG Base Portsmouth and provide a minimum one-year warranty covering all parts and labor.
2.1 TASK ONE. Transportation of the loader
2.1.1 The Contractor shall furnish all necessary transport vehicles, rigging, securing equipment, and certified operators in full compliance with federal, state, and local Department of Transportation (DOT) safety regulations. The Contractor shall be responsible for the safe round-trip transportation of one (1) Bobcat T870 Compact Track Loader from USCG Base Portsmouth, VA, to an authorized repair facility and return delivery upon completion.
2.2 TASK TWO. Diagnostic Assessment of the Loader’s Hydraulic and Drive systems
2.2.1 Contractor shall conduct a comprehensive diagnostic assessment of the loader’s hydraulic and drive systems, specifically evaluating the primary hydraulic pump, hydrostatic drive pumps, charge circuit, auxiliary systems, and left/right final drive track motors.
2.2.2. If during the diagnostic assessment, the contractor identifies any adjacent or interrelated hydraulic and drive system components, including control valves, relief valves or other parts that are faulty, damaged, or fail to meet OEM tolerances and factory specifications, the Contractor shall document these findings. The Contractor shall submit a detailed written Report of Findings and itemized cost estimate (specifying genuine Bobcat OEM parts and labor) to the Contracting Officer (KO). No work on these additional components shall commence until authorized in writing via an executed contract modification from the Contracting Officer. All replacement parts authorized under any change order shall be contractor-furnished genuine Bobcat OEM parts or equivalent parts as authorized by the government.
2.3 TASK THREE. Overhaul, Repair, or Replace
../SCOPE%20PARAGRAPHS.doc
PAGE 2/5
2.3.1 After the diagnostic assessment is complete, the Contractor shall replace the main hydraulic pump and final drive assemblies.
2.3.2 Following all mechanical repairs, the Contractor shall perform a full contamination control flush across the entire machine. This entails thoroughly flushing and decontaminating all hydraulic supply and return lines, the main hydraulic reservoir tank, manifold assemblies, and all hydraulic cylinders to remove any metal particulates, shavings, or degraded fluid. The Contractor shall replace all hydraulic filters with new OEM filters and refill the system to operating capacity with manufacturer-approved hydraulic fluid.
2.3.3 Upon completion of repairs and fluid servicing, the certified technician shall perform full electronic and hydrostatic calibrations, ensuring drive pump displacement, track tracking, and steering response are aligned with zero mechanical drift.
2.34 The Contractor shall perform full operational load testing across all functions and provide certified documentation verifying that all system pressures meet Bobcat OEM specifications.
3.0KEY PERSONNEL
Project Manager
3.1 PROJECT MANAGER
3.1.1 The Project Manager must be available to the QAE via telephone between the hours of 0700 and 1530 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 24 hours of notification.
3.2 EMPLOYEE IDENTIFICATION
3.2.1 The QAE will provide a Base Access request form. The Contractor will need to return the Base Access form with list of all employees to the QAE Representative five (5) days prior to commencing work. The USCG Base Portsmouth Security Office will be given a copy of the employee list, and a pass will be issued for entry. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
3.3 EMPLOYEE CONDUCT
Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees always present a professional appearance and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project
PAGE 3/5
Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.
Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
3.5 DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE
Nathan Chappell. (206)815-2176 Nathan.C.Chappell@uscg.mil.
3.5.1 CONDITIONS AFFECTING THE WORK
The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. All contractors that require Base access will have to be pre-vetted for entry prior to commencement of work.
3.6 SECURITY
Each contractor that does not have Real ID on their Driver licenses will need to present one of the following credentials:
. U.S. Department of Defense ID, including IDs issued to Active Duty, Reserve, National Guard, retirees and dependents.
. RAPIDGate Credential . HSPD-12 PIV card . State-issued Enhanced Driver's License . U.S. passport . U.S. passport card . DHS trusted traveler cards (Global Entry, NEXUS, SENTRI, FAST) . Permanent resident card . Border crossing card . Federally recognized Tribal Nation/Indian Tribe, including Enhanced Tribal Cards (ETCs) . Foreign government-issued passport . Canadian provincial driver's license or Indian and Northern Affairs Canada card . Transportation worker identification credential . U.S. Citizenship and Immigration Services Employment Authorization Card (I-766) . U.S. Merchant Mariner Credential . Veteran Health Identification Card (VHIC) mailto:Nathan.C.Chappell@uscg.mil
PAGE 4/5
3.7 AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.
4.0 PERIOD OF PERFORMANCE
The period of performance for this contract must not exceed 90 working days after contract award or as negotiated with Contracting Officer and Facilities Engineering.
4.1 TRAVEL
Travel shall not be included as an additional/separate line item. Travel is required for delivery and installation purposes and shall be included as part of the overall cost.
4.2 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
4.3 CONTRACTOR FURNISHED PROPERTY
The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract.
4.4 GOVERNMENT ACCEPTANCE PERIOD
Upon completion of work, contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.
4.4.1 The QAE will conduct an inspection of the work conducted by the Contractor and will have the right to reject or require correction of any deficiencies found that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the QAE of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
5.0 OTHER APPLICABLE CONDITIONS
5.1 SECURITY/SAFETY
All contractors working on CG Base Portsmouth shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.
Written notification must be provided to the Base Safety Officer; in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the
PAGE 5/5
Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.
Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Base Portsmouth. A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.
Every employee working on Base Portsmouth has the right to a safe and healthy work place.
The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
5.2 ENVIRONMENTAL PROTECTION REQUIREMENTS:
All contractors working on CG Base Portsmouth shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractors written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.
Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Base Portsmouth. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.
Hazardous materials used by a contractor are required to be disposed of by that contractor.
Disposal must be in accordance with federal, state, and local guidelines.
5.3 PERMITS: The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.
5.4 WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory for the Contracting Officer.
5.5 ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
File details come from the government source that posted it. Updated .