This statement of work outlines requirements for a 752nd Special Operations Aircraft Maintenance Squadron at Royal Air Force Mildenhall to procure a mini crane. The statement specifies the crane must have a capacity of 2.9 tons with a maximum working radius of 14.45 meters and maximum boom length of 14.61 meters. It must be diesel powered and electric with radio remote control as standard. The statement provides requirements for contractor management, subcontractor management if applicable, and work hours. It also specifies security, safety, and installation access requirements and provides shipping instructions for delivery to RAF Mildenhall in the United Kingdom. The related federal contract opportunity is solicitation number FA558723Q0104 for procurement of this 752 SOAMXS mini crane from the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.

View the file

Other files for this federal contract opportunity

Other files attached to 752 SOAMXS Mini Crane, newest first.
File Type Posted
Solicitation - FA558723Q0104.pdf PDF
Quote Sheet - 727 SOAMXS Mini Crane.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

(SOW)

752 SOAMXS Mini Crane at

Royal Air Force (RAF) Mildehall

2nd August 2023

1.0 Introduction

1.1 Mission: The primary mission of the 752nd Special Operations Aircraft Maintenance Squadron (752 SOAMXS) Maintenance Unit is to provide safe and reliable aircraft by performing general aircraft servicing and air worthiness maintenance on the CV22 Osprey based at Royal Air Force (RAF) Mildenhall, United Kingdom. Several of the maintenance actions required to maintain this aircraft require the use of an overhead lifting device. The current methods used to lift components are either limited in scope or require a substantial set-up time both degrading our ability to produce safe reliable aircraft in a timely manner.

Acquiring this style of crane will ensure we have this overhead lifting capability at any location, no matter the terrain which will reduce the turnround time of downed aircraft and enhance our ability to meet our flying hour commitment.

1.2 Background: The 752 SOAMXS currently does not have any powered, mobile crane capability other than the hoist inside of our hangar and the non-powered portable maintenance crane. Both capabilities are limited which often leads to more time and manpower required to execute the required maintenance. The hangar’s overhead hoist only covers 50% of the hangar allowing for only two aircraft hoist maintenance locations.

This limited availability causes multiple tows consisting of 6 maintainers each tow team to reposition the aircraft as required. This typically causes several hours per aircraft tow in delays. The manual powered portable maintenance cranes require a minimum 45-minute setup time due to the number of attachments required to be constructed and installed on the crane. Additionally, the manual powered maintenance crane must be position exactly under the nacelle to pull components. If the crane is off by inches, it must be reposition causing another 30 minutes in delays. The amount of down time it takes to position an aircraft for hoisting capabilities, set-up and safely operate a portable maintenance crane, or request cranes from other agencies significantly impacts the CV-22 Flying Hour Program.

1.3 Scope: The required motorized, mobile crane will eliminate the need to request for any outside agency’s crane to perform any normal CV-22 maintenance action. This new capability will allow more effective replacement of components on any terrain at any location saving countless man hours (towing or repositioning aircraft) and any substantial downtime while waiting for a contractor or agency’s assistance.

The overall impact of this Mini Crane is the increase in efficiency and effectiveness of our maintenance effort.

2.0 General Requirements

2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.

2.2 Contract Management & Administration

2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.

2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The

Contractor shall assign resources in order to maintain proper and accurate records related to this contract.

2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.

2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays. Work hours are from 0800 to 1700 local UK time.

3.0 Product Specifications & Installation Requirements

3.1 The 752nd Special Operations Aircraft Maintenance Squadron (752 SOAMXS) have a requirement for a one (1) Mini Crane Brand Name or Equal to the UNIC Mini Spider Crane (P/N: URW-376) to be delivered to Royal Air Force (RAF) Mildenhall, United Kingdom. The Mini Crane must be equal in compliance to the following characteristics at a minimum:

Capacity 2.9t X 2.5m Total Width 1.3m Max Working Radius 14.45m Max Boom Length 14.61m Diesel Powered Tier 4 and 415v Mains Electric Zero Length Increase with Electric Option Operator Control of Outrigger Extension Intelligent Voice Warning System Radio Remote Control as Standard Working Area Limitation Intelligent Throttle Activation for Economy and Ecology

The Mini Crane must be a mid-capacity machine that can be controlled either from the onboard operator’s seat or from a distance using radio remote control. The Contractor shall provide the following standard equipment:

Computer Controlled Moment Limiter (Safe Load Indicator), Overload Warning Lamps, Intelligent Voice Warning System, Radio Remote Control, Intelligent Throttle Activation.

4.0 Special Requirements

4.1 Security & Safety

4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.

4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.

4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.

4.3 Shipping Instructions

4.3.1 For vendors located inside the United Kingdom.

4.3.1.1 Shipment shall be FOB Destination.

4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).

4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2 For vendors located outside of the United Kingdom.

4.3.2.1 Option One: United States Postal Service.

4.3.2.1.1 Shipping shall be FOB Destination.

4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.

4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.1.5 Hazardous material is not submitted.

4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.

4.3.2.2 Option Two: Commercial small parcel carrier.

4.3.2.2.1 Shipping shall be FOB Destination.

4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.

4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.

4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2.3 Option Three: Consolidated Shipping Point.

4.3.2.3.1 Shipping shall be FOB Destination.

4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.3.3 Weight of individual shipments must exceed 300lbs.

4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).

4.3.2.3.5 Hazardous material may be shipped via this method.

4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.

4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED

STATES AIR FORCE” in order to ensure shipments clear customs.

4.3.2.3.8 48 FW logistics points of contact are provided for in 4.3.3.

4.3.3 Contact Information; 48th Logistical Readiness Squadron (48 LRS)

4.3.3.1 48 LRS/Inbound Customs; 48lrs.lgrddc.inboundcustoms@us.af.mil.

4.3.3.2 48 LRS/Inbound Cargo; 48lrs.inboundcargo@us.af.mil.

4.3.3.3 Commercial phone number; +44 01638 52620.