Statement of Work_Shoring Device.pdf

PDF 42 KB Posted

Attached to
Shoring Device
Solicitation number
FA462625Q0009
Issued by

About this file

This Statement of Work outlines requirements for delivery of a modular trench shielding system to Malmstrom AFB, MT for the Department of the Air Force Global Strike Command. The system must protect workers in trenches up to 10 feet deep and 40 feet long, with width adjustability between 3-7 feet.

Key specifications include modular components weighing under 1000 lbs per assembled box, complete with keeper pins, corner posts, spreaders, lifting/stacking hardware, and adjustable leveling legs. The contractor must deliver within 60 days of award, provide on-site training for assembly/disassembly, safe operation, and maintenance, and supply all documentation including manuals and engineering drawings. The system includes a 1-year warranty on all components, with payment made upon successful delivery and acceptance after inspection. The contractor is responsible for design, manufacturing, procurement of materials, delivery to Malmstrom AFB, and ongoing technical support.

View the file

Other files

File Type Posted
Answers to Submitted Questions.pdf PDF
Contractor QA.pdf PDF
Solicitation - FA462625Q0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work – Trench Shoring Device

1. Introduction

This Statement of Work (SOW) outlines the requirements for the delivery of a modular trench shielding system to Malmstrom AFB, MT. The system will be used to protect workers in trenches up to 10 feet deep and 40 feet long.

2. Scope of Work

The Contractor shall provide and deliver a complete trench shoring system meeting the following specifications:

• System Requirements:

o Depth Capacity: Capable of safely shoring trenches up to 10 feet deep.

o Length Capacity: Capable of shoring trenches up to 40 feet long.

o Width Adjustability: Adjustable to accommodate trench widths between 3 and 7 feet.

o Modularity:

Easily assembled and disassembled by a small crew.

Modular components for efficient transportation and storage.

o Weight Limitations:

Each assembled box should weigh under 1000 lbs. for efficient handling and transportation.

o Components:

Includes all necessary components, including:

Keeper pins

Corner posts

Spreaders

Lifting hardware

Stacking hardware

Leveling legs with adjustable height o Transportation:

Compact and easily transportable, fitting into an enclosed storage trailer.

• Delivery:

o Delivery of the complete trench shoring system to Malmstrom AFB, MT.

o Delivery Date: 60 Days after date of award.

• Training:

o Provide on-site training to Malmstrom AFB personnel on:

Proper assembly and disassembly of the system.

Safe operation and use of the system.

Maintenance and inspection procedures.

• Documentation:

o Provide all relevant documentation, including:

Operating manuals

Maintenance manuals

Safety manuals

Engineering drawings and specifications

3. Contractor Responsibilities

The Contractor is responsible for:

• System Design and Manufacturing:

o Designing and manufacturing the trench shoring system to meet all specified requirements.

• Procurement and Delivery:

o Procuring all necessary materials and components.

o Delivering the complete system to Malmstrom AFB, MT, as per the agreed-upon schedule.

• Documentation and Support:

o Providing all required documentation and ongoing technical support.

4. Acceptance Criteria

The trench shoring system will be accepted upon successful completion of the following:

• Delivery:

o All components of the system have been delivered to Malmstrom AFB, MT.

• Inspection:

o A thorough inspection of the system has been conducted to ensure compliance with all specifications.

5. Warranty

The Contractor shall provide a 1-year warranty on all components of the trench shoring system.

6. Payment

Payment will be made to the Contractor upon successful completion and acceptance of all deliverables as outlined in this SOW.

File details come from the government source that posted it. Updated .