This document is a Statement of Work (SOW) for the repair of a York 500-ton chiller at the Federal Correctional Institution (FCI) Aliceville in Alabama.
The SOW outlines the required services, which include providing all parts and labor to repair an oil leak on the chiller, performing a leak check and vacuum of the system, changing any necessary lubricant or filters, and completing a startup and operational verification of the chiller. The work must be performed by qualified HVAC personnel using genuine York factory parts and completed within 120 calendar days of contract award. The contractor is solely responsible for recovering and recharging the refrigerant. The government will provide electricity and restroom services, while the contractor must provide all other utilities. The contractor must adhere to various safety, security, and administrative requirements specified in the SOW.
The related federal contract opportunity is a Request for Quote (RFQ) solicitation for the chiller repair requirements, with a NAICS code of 333415. The contract type is Firm-Fixed Price, and the government will award to the responsible quoter whose offer is most advantageous based on best value, considering cost/price and past performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Chiller Cover Letter.pdf | ||
| 15B31824Q00000019 Chiller Repair.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
B&F 24Z3A2R REPAIR CHILLER
FEDERAL CORRECTIONAL INSTITUION
ALICEVILLE, ALABAMA
A. DESCRIPTION OF WORK:
The Federal Bureau of Prisons, Federal Correctional Institution (FCI) Aliceville intends to award to a responsible entity for the repair of one York 500-ton chiller at FCI
Aliceville, located at 11070 Highway 14, Aliceville, AL 35442. FCI Aliceville is located in Aliceville, AL approximately 30 miles Southeast of Columbus, MS, and 50 miles West of Tuscaloosa, AL.
B. DESCRIPTION OF SERVICE:
The Contractor shall provide all parts, materials and services to properly repair an oil leak that has been identified on a York 500-ton centrifugal chiller that was installed in 2011.
The chiller is identified as Chiller #3. The chiller has been placed out of service until the leak has been repaired. The Contractor is solely responsible for providing any and all components for the repair associated with refrigerant that will be recovered and charged during the repair of the chiller. The Contractor will be required to perform a leak check and vacuum of the system to determine all leaks are repaired. Any lubricant or filters may be changed during this leak repair associated with the repair location. The
Contractor is required to perform a start up of the chiller, and verify all operating and safety controls are in working order once all repairs have been completed. Upon completion the chiller will be placed back into operational service.
The repair service shall be completed by qualified HVAC personnel using only genuine
York factory parts. Seismic zone requirements, environmental compliance, life safety, NFPA, OSHA, federal, state, local codes and regulations will be considered during all phases of this project. All work shall be completed, equipment tested and adjusted per manufacturers recommendations and accepted by the Contracting Officer’s
Representative (COR) and Contracting Officer (CO).
FCI Aliceville’s hours of operation for this project will be Monday thru Friday, 7:00am to 3:30pm., excluding Federal Holidays. All work must be scheduled within these working hours and time frame. Any work that is required outside of this schedule must be preapproved by the COR, and Contracting Officer prior to beginning of any work.
C. SPECIFICATIONS
Manufacturer: York
Model: YKFQFQQ7-CRGS
Serial Number: SCWM518690
Refrigerant: R134A
D. PERIOD OF PERFORMANCE:
The Contractor has sole responsibility and discretion for choosing and implementing the manner and method of tasks outlined in this Statement of Work as long as the requirements are met in accordance with the policies described above. The period of performance is not to exceed 120 calendar days from the contract award.
E. DELIVERY OF MATERIALS:
All construction materials and contractor equipment needed to perform the work, that will require temporary on-site storage, will be coordinated with the COR.
All construction related deliveries, which are directly shipped to the institution on behalf of the contractor, can be received at the institutions Power House (Utility Plant) between the hours of 7:00am – 2:30pm, Monday – Friday, excluding Federal Holidays. At no point will a Bureau of Prisons (BOP) staff member sign for, or allow a drop shipment of project related materials or equipment to enter the institution if the contractor, or his representative, is not present to inspect, verify, and accept the delivery. Under no circumstance will the FCI or its staff be responsible for the acceptance of any project related deliveries.
The Contractor shall be responsible for providing their own means of loading and unloading contractor materials and equipment. At no time shall contractor materials or equipment being staged for institution entry or exit be allowed to block, impede or otherwise hinder the typical operations of the work area.
F. STORAGE AND SECURITY OF MATERIALS AND EQUIPMENT:
All construction materials and equipment shall be stored in a designated area mutually agreed upon between the COR and the contractor. If the Contractor requires on site storage, a Job box or Gang box can be left at the job, but will need to be secured daily.
The storage or box will require a double padlock with one lock belonging to the
Contractor, and one to the FCI.
All Contractor ladders that may be needed for the job, and cannot be stored in an authorized storage container, shall be stored and secured in the immediate work site area.
Such ladders will be secured to an agreed upon stationary fixture with a contractor provided padlock and chain.
The Contractor shall be required to adhere to the BOP’s tool inventory program as it pertains to contractor tools and equipment entering and exiting the institution. If an authorized on site storage container should be used by the contractor to store their job tools and equipment for the duration of the project, the Contractor shall be required to use a daily inventory check sheet to account for all items in the container. A FCI Facilities staff representative will be present to oversee and verify the inventory process. The container will be inventoried and verified at the end of every work shift prior to locking the container shut.
G. SECURITY CLEARANCE:
All Contractors assigned to work on the project that enter the institution will be required to complete the NCIC background screening process. The NCIC release forms will be available through the COR.
H. MICELLANEOUS INFORMATION:
This service is a contractual arrangement and not a personnel appointment. Payment is based on and end product or the accomplishment of a specific result. The service does not constitute an employer/employee relationship. All duties outlined in the Statement of
Work shall be performed in accordance with standards and methods generally accepted within the contractor’s own field of expertise. The contractor will not be subject to
Government supervision, except for security related matters, however contractor performance shall be monitored.
I. SAFETY AND PERSONAL PROTECTIVE EQUIPMENT:
All Contractor employees shall have, and wear required personal protective equipment prescribed by the industry standards at all times while on the job site. It is the responsibility of the contractor to provide such equipment.
J. OTHER CONSIDERATIONS:
Contractors will NOT be access their cell phones, cameras or two way communication devices into the institution. All cell phones and electronic devices will be required to stay inside a locked vehicle. The FCI Aliceville Facilities Department maintains a digital camera that will be utilized by FCI staff to document the project work. The Contractor may have copies of these documentation photos for record keeping.
All deviations of this Statement of Work must be approved in writing by the Contracting
Officer via modification to the contract.
The Contractor shall be responsible for restoring the work location / job site to the state it was prior to completion of the project.
K. UTILITIES:
The FBOP will provide electricity service (120V), for battery chargers, small hand tools, etc.
The FBOP will provide restroom services.
All other utilities must be provided by the Contractor.