Statement_of_Work_-_Rehab_Comfort_Station.pdf
PDF 142 KB Posted
- Solicitation number
- 140P5425R0022
About this file
This Statement of Work (SOW) details a comprehensive renovation project for visitor restrooms at Biscayne National Park's Visitor Center. The project involves a full renovation of the restrooms, including demolition and removal of existing components, installation of new fixtures, tiles, partitions, and accessories, with a focus on enhancing functionality, accessibility, and aesthetics. Key specifications include installing water-efficient, ADA-compliant toilets and urinals, quartz countertops with integrated sinks, solid plastic partitions, 12x24 white gloss ceramic wall tiles, and 6x24 gray wood-style porcelain floor tiles.
The renovation will be completed in a phased approach, with each restroom unit taking approximately 45 days, minimizing disruption to park operations. The project emphasizes compliance with National Park Service facility standards, ADA Accessibility Guidelines, International Building Code, and OSHA safety regulations. A site-specific safety plan will be implemented, including worker safety measures with proper PPE and public safety considerations such as signage and barriers to redirect foot traffic during work hours. The contractor will provide weekly progress updates and conduct a final inspection to ensure all elements meet quality standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage_Determination.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Statement_of_Work_-_Replace_Decking.pdf | ||
| Sol_140P5425R0022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Project Title: Visitor Restroom Renovation Location: Biscayne National Park, Visitor Center
1. Objective
To perform a comprehensive renovation of the visitor restrooms at Biscayne National Park Visitor Center to enhance functionality, accessibility, and overall aesthetics. The project aims to modernize the restroom facilities to improve visitor satisfaction, ensure compliance with current accessibility standards, and provide durable, easy-to-maintain surfaces and fixtures suitable for high-traffic public use.
2. Scope of Work
The awarded contractor will provide all labor, tools, materials, equipment, supervision, and project oversight required to execute the full renovation of the Visitor Center restrooms. Work will be completed in a phased approach, with one restroom renovated at a time to ensure minimal disruption to park operations and visitor access.
Tasks Include:
1. Demolition & Removal:
o Safely disconnect and remove all existing restroom components including stalls, fixtures, vanities, tiles, and flooring.
o Properly dispose of all materials in accordance with environmental and park service guidelines.
o Ensure all demolition debris is contained and does not impact surrounding areas.
2. Installation:
o Panels and Partitions: Install new, high-durability solid plastic partitions and urinal screens that are resistant to moisture and vandalism.
o Plumbing Fixtures: Install water-efficient toilets and urinals that meet ADA and environmental standards. Ensure all plumbing connections are leak-tested and meet code requirements.
o Vanity & Mirrors: Install quartz countertops with integrated sinks, supported by ADA-compliant cabinetry. Install shatter-resistant frameless mirrors (36x48 and 36x24) at appropriate heights for accessibility.
o Flooring: Lay new commercial-grade floor tiles designed for slip resistance and easy maintenance. Proper subfloor preparation will be conducted to ensure longevity.
o Wall Tiles: Apply 12x24 white gloss ceramic wall tiles in a consistent layout to enhance brightness and ease of cleaning.
o Accessories: Install soap dispensers, paper towel holders, hand dryers, grab bars, and other necessary accessories per ADA guidelines.
3. Compliance & Safety:
o All work will adhere to Federal, State, and local building codes, as well as ADA accessibility requirements and OSHA safety regulations.
o Implement job-specific health and safety measures including signage, PPE, and restricted access zones.
4. Clean-Up & Disposal:
o Remove all construction waste daily to maintain a clean and safe site.
o Final clean-up will include deep cleaning of all surfaces and restoration of any adjacent areas affected by construction.
5. Finalization:
o Conduct a thorough inspection to ensure all elements are installed correctly and meet quality standards.
o Submit a detailed project report including photographs, compliance checklists, and warranty documentation.
o Facilitate a final walkthrough with park staff to confirm satisfaction and obtain approvals.
3. Design & Material Recommendations
• Wall Tiles: 12x24 White Gloss Ceramic – bright, clean aesthetic and easy to maintain.
• Floor Tiles: 6x24 Gray Wood-Style Porcelain or approved alternatives – slip-resistant and durable.
• Countertops: Quartz Sparkling White – non-porous and resistant to staining.
• Partitions: Solid plastic partitions and urinal screens – long-lasting and low maintenance.
• Mirrors: Frameless polished mirrors (36x48 and 36x24) – safety glass compliant with public facility standards.
4. Schedule
• Estimated Duration: 45 days per restroom unit, including demolition, installation, inspection, and finalization.
• Work Phasing: One restroom will be completed before the next begins, minimizing disruption.
• Reporting: Weekly progress updates with photos and milestones.
• Contingencies: Timeline may be adjusted based on weather conditions or unforeseen site conditions.
5. Safety & Emergency Planning
• Site-Specific Safety Plan (SSSP): Developed and implemented for this project, addressing risks, emergency response, and communication procedures.
• Worker Safety: All personnel will be equipped with PPE and trained in site-specific hazards.
• Public Safety: Signage and barriers will be used to keep visitors safe and redirect foot traffic during work hours.
6. Compliance
• All work will comply with:
o National Park Service facility standards o ADA Accessibility Guidelines (ADAAG) o International Building Code (IBC) o OSHA construction safety regulations o Applicable local and state codes
| 1. Objective |
| 2. Scope of Work |
| Tasks Include: |
| 3. Design & Material Recommendations |
| 4. Schedule |
| 5. Safety & Emergency Planning |
| 6. Compliance |
File details come from the government source that posted it. Updated .