Statement of Work_RB-M Insulation Renewal.pdf

PDF 93 KB Posted

Attached to
USCG Base Miami Beach CG 45751 Hull Insulation Renewal
Solicitation number
52050PR260000001
Issued by

About this file

This document is a Statement of Work (SOW) for insulation renewal on a 45-foot Response Boat - Medium (RB-M) for the U.S. Coast Guard at the Miami Beach Industrial Production Facility. The contractor will install insulation in the Engine Room Machinery Space using Pyrotek "QUADZERO" sound attenuation barrier and Owens Corning 2" Foil-Faced "Insul-Quick" insulation, following a specific installation process that includes applying barriers, insulation, speed washers, and trim pins.

The project is scheduled for late November to early December 2025, with work performed Monday through Friday from 6:30 am to 3:00 pm. The contractor is responsible for providing all necessary personnel, tools, and consumables, including pins and caps, and arranging disposal of existing lead-lined insulation. Overtime must be pre-approved by Base Miami Beach officials, and the Contracting Officer's Technical Representative (COTR) will schedule the exact performance periods at least two weeks in advance. The primary contacts are LT Allie Doris and Mr. Bryan Goltz at 305-535-4332 and 305-535-4337, respectively.

View the file

Other files

File Type Posted
Insulation Details 45-RB-M-635-002 Rev C.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION/SPECIFICATION/WORK STATEMENT

FOR INSULATION RENEWAL ON 45’ RESPONSE BOAT - MEDIUM

Work Statement

In the performance of this contract, the contractor shall provide the services to perform insulation renewal on a 45-foot Response Boat – Medium (RB-M) while the vessel is dry-docked at USCG Base Miami Beach Industrial Production Facility located at 100 MacArthur Causeway Miami Beach, FL 33139. The contact person for this contract is LT Allie Doris, 305-535-4332, or Mr. Bryan Goltz, 305-535-4337.

Scope of Services

The contractor shall furnish trained, qualified personnel, and any required special tools or equipment necessary to complete the following work:

1. Install insulation in the entirety of the Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, IAW Drawing 45-RB-M-635-002, Rev C.

2. Installation material will be as follows:

a. Sound attenuation barrier: Pyrotek “QUADZERO” #17763007

b. Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation

3. Installation process is as follows:

Bulkhead > QUADZERO > Insulation Speed Washer > 2” Insul-Quick Hullboard > Insulation Speed Washer > Trim Pin (if necessary) > Insulation Cap

4. Tape all boundaries.

5. All consumables, Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation, Pyrotek insulation, and stud gun will be provided by the contractor.

6. Contractor will provide pins and caps. Contractor will replace any damaged pins found upon insulation removal.

7. Contractor will arrange for disposal of existing lead-lined insulation. Existing lead-line insulation will be removed and packaged prior to Contractor arrival.

Contractor Performance Requirements

(1) Installation period of performance will be scheduled as determined by the vessel’s production schedule; estimated late November to early December 2025.

(2) Exact periods of performance will be scheduled by the COTR at least two weeks prior to start and will be performed Monday through Friday excluding holidays, during the following work hours:

6:30 am to 3:00 pm

(3) If overtime is required, the contractor must notify the COTR 24 hours in advance and must be approved by Base Miami Beach officials.

File details come from the government source that posted it. Updated .