This document is a Statement of Work (SOW) for the insulation renewal on a 45-foot Response Boat - Medium (RB-M) for the U.S. Coast Guard.

The SOW requires the contractor to furnish trained, qualified personnel and necessary equipment to install insulation in the Engine Room Machinery Space, including the Port and Starboard Engine Room Air Intakes, of the RB-M vessel while it is dry-docked at the USCG Base Miami Beach Industrial Production Facility. The installation period is estimated to be in mid to late July 2024, with the exact schedule determined by the COTR at least two weeks prior. The contractor must use specific insulation materials and follow a defined installation process. All consumables, pins, and caps are to be provided by the contractor, who is also responsible for disposing of the existing lead-lined insulation.

The related federal contract opportunity, Solicitation Number 52050PR240000338, is a Small Business Set-Aside for insulation renewal services on the 45-foot RB-M. Proposals are due by 3 PM on July 8, 2024, and the contract will be awarded based on Best Value, considering cost and past performance. The anticipated award date is 7 business days after the solicitation closes, on or about July 17, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to INSULATION RENEWAL ON 45’ RESPONSE BOAT - MEDIUM, newest first.
File Type Posted
Insulation Details 45-RB-M-635-002 Rev C.pdf PDF
CG 45740 Insulation Spec.pdf PDF
Synopsis Solicitation 45740 Insulation Renewal.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION/SPECIFICATION/WORK STATEMENT

FOR INSULATION RENEWAL ON 45’ RESPONSE BOAT - MEDIUM

Work Statement

In the performance of this contract, the contractor shall provide the services to perform insulation renewal on a 45-foot Response Boat – Medium (RB-M) while the vessel is dry-docked at USCG Base Miami Beach Industrial Production Facility located at 100

MacArthur Causeway Miami Beach, FL 33139. The contact person for this contract is LT

Julia Ferris, 305-535-4332, or Mr. Bryan Goltz, 305-535-4337.

Scope of Services

The contractor shall furnish trained, qualified personnel, and any required special tools or equipment necessary to complete the following work:

1. Install insulation in the entirety of the Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, IAW Drawing 45-RB-M-635-002, Rev C.

Contractor Performance Requirements

(1) Installation period of performance will be scheduled as determined by the vessel’s production schedule; estimated mid to late July 2024.

(2) Exact periods of performance will be scheduled by the COTR at least two weeks prior to start and will be performed Monday through Friday excluding holidays, during the following work hours:

6:30 am to 3:00 pm

(3) If overtime is required, the contractor must notify the COTR 24 hours in advance and must be approved by Base Miami Beach officials.

2. Installation material will be as follows:

a. Sound attenuation barrier: Pyrotek “QUADZERO” #17763007

b. Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation

3. Installation process is as follows:

Bulkhead > QUADZERO > Insulation Speed Washer > 2” Insul-Quick Hullboard > Insulation Speed Washer > Trim Pin (if necessary) > Insulation Cap

4. Tape all boundaries.

5. All consumables, Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation, Pyrotek insulation, and stud gun will be provided by the contractor.

6. Contractor will provide pins and caps. Contractor will replace any damaged pins found upon insulation removal.

7. Contractor will arrange for disposal of existing lead-lined insulation. Existing lead-line insulation will be removed and packaged prior to Contractor arrival