Statement of Work_RB-M Insulation Renewal 45625.pdf

PDF 111 KB Posted

Attached to
INSULATION RENEWAL ON 45’ RESPONSE BOAT - MEDIUM
Solicitation number
52050PR250000289
Issued by

About this file

This document is a Statement of Work for insulation renewal on a 45-foot Response Boat - Medium (RB-M) for the U.S. Coast Guard. The scope of services requires the contractor to install insulation in the entire Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, and approximately 50 square feet of the Pilot House, in accordance with Drawing 45-RB-M-635-002, Rev C.

The work will be performed at USCG Base Miami Beach Industrial Production Facility, with an estimated performance period of late May/early June 2025. Work hours are 6:30 am to 3:00 pm, Monday through Friday, excluding holidays. The contractor must provide trained personnel, special tools, and equipment. Overtime requires 24-hour advance notification and approval from Base Miami Beach officials. The contract is a small business set-aside with a fixed-price structure, and the government will award based on best value, considering cost and past performance.

View the file

Other files

File Type Posted
PICTURE 2.pdf PDF
wage determinations 2015-4543.pdf PDF
PICTURE 1.pdf PDF
PICTURE 4.pdf PDF
Synopsis Solicitation USCG 45625 (RB-M-45) Insulation Renewal.pdf PDF
Insulation Details 45-RB-M-635-002 Rev C.pdf PDF
PICTURE 3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION/SPECIFICATION/WORK STATEMENT

FOR INSULATION RENEWAL ON 45’ RESPONSE BOAT - MEDIUM

Work Statement

In the performance of this contract, the contractor shall provide the services to perform insulation renewal on a 45-foot Response Boat – Medium (RB-M) while the vessel is dry-docked at USCG Base Miami Beach Industrial Production Facility located at 100 MacArthur Causeway Miami Beach, FL 33139. The contact person for this contract is LT Julia Ferris, 305-535-4332, or Mr. Bryan Goltz, 305-535-4337.

Scope of Services

The contractor shall furnish trained, qualified personnel, and any required special tools or equipment necessary to complete the following work:

1. Install insulation in the entirety of the Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, IAW Drawing 45-RB-M-635-002, Rev C.

2. Install insulation approx. 50 square feet of the Pilot House. IAW Drawing 45-RB- M-635-002, Rev C.

Contractor Performance Requirements

(1) Installation period of performance will be scheduled as determined by the vessel’s production schedule; estimated late May/ early June.

(2) Exact periods of performance will be scheduled by the COTR at least two weeks prior to start and will be performed Monday through Friday excluding holidays, during the following work hours:

6:30 am to 3:00 pm

(3) If overtime is required, the contractor must notify the COTR 24 hours in advance and must be approved by Base Miami Beach officials.