This is a Draft Statement of Work (SOW) for Total Parenteral Nutrition (TPN) services at Bay Pines Veterans Affairs Healthcare System. The document outlines a five-year contract from May 2026 to April 2031, with a firm fixed unit price structure, for custom TPN IV mixture preparation and delivery. Key requirements include daily TPN production between 0900-1730 EST, order placement by 1200 EST with same-day delivery by 1500 EST, and strict labeling specifications including patient-specific details such as name, date of birth, and precise ingredient quantities.
The contract involves delivering TPN solutions to the Inpatient Pharmacy at 10,000 Bay Pines Boulevard in Florida, with comprehensive quality assurance protocols meeting JCAHO, FDA, and ISO 9000 standards. Invoicing will occur biweekly, detailing individual TPN costs per patient, and the contractor must follow specific delivery, recall, and return policies. The associated federal contract opportunity is a Sources Sought Notice seeking market research to identify qualified vendors, with responses due by January 2, 2026, to determine the appropriate acquisition method for this critical healthcare service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24826Q0181.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bay Pines Veterans Affairs Healthcare System (BPVAHCS)
STATEMENT OF WORK (DRAFT)
1.0 Introduction
Total parenteral nutrition (TPN) is an intravenous feeding method indicated for those patients who require complete bowel rest or fail to obtain nourishment from a dysfunctional gastrointestinal tract. The full daily caloric requirement can be met with parenteral delivery of macronutrients (carbohydrates, amino acids, and fats), as well as the replacement of micronutrients (electrolytes, minerals, vitamins, and other additives), tailored to the individual patient. Most calories are supplied with carbohydrates, followed by lipids, then amino acids. TPN can be a lifesaving treatment for patients who are not able to absorb nutrition from their gut, but it can also lead to many severe complications if not formulated and prepared appropriately.
TPN solutions at BPVAHCS are prepared by a technician and a pharmacist using aseptic technique in an ISO Class 7 sterile room in an ISO Class 5 Laminar Flow Hood to ensure sterility. The pharmacy staff uses a Baxter compounding machine to custom prepare the macronutrient base of the TPNs. Then the electrolytes, minerals, and other additives are individually and manually drawn up into syringes and injected into the TPN base. There are several series of double and triple checks throughout this process to ensure the complex TPN solution is formulated correctly. Currently, Bay Pines dictates a standard hang time of 1800 for all TPN solution bags; to meet this hang time, all orders should be submitted by 1300.
2.0 Requirements
2.1 Terms of contract
2.1.1 Period of Performance:
Ordering Period 1: May 01, 2026 – April 30, 2027 Ordering Period 2: May 01, 2027 – April 30, 2028 Ordering Period 3: May 01, 2028 – April 30, 2029 Ordering Period 4: May 01, 2029 – April 30, 2030 Ordering Period 5: May 01, 2030 – April 30, 2031
2.1.2 Type of contract: Firm Fixed Unit Price
2.1.3 Contract is subject to availability of VA funds
2.2 Work hours
2.2.1 Total Parenteral Nutrition Services Hours of Operation
2.2.1.1 0900 – 1730 (EST) seven (7) days per week
2.2.1.2 Contact phone numbers must be provided for all after hours inquiries
2.2.2 Order Transmission/Delivery Times
2.2.2.1 TPNs will be ordered throughout the day, seven (7) days a week
2.2.2.2 Orders placed by the 1200 (EST) will be delivered to BPVAHCS no later than 1500 (EST) the same day
2.2.2.2.1 Total Parenteral Nutrition Services will deliver all products to the Inpatient Pharmacy located on the ground floor of the BPVAHCS, 10,000 Bay Pines Boulevard, Bay Pines, Florida 33744
2.2.2.3 Receipt of delivery
2.2.2.3.1 A packing slip in duplicate copies will be delivered along with the TPNs and signed by a pharmacy staff member to verify the shipment is complete. BPVAHCS will keep the copy of the packing slip and the yellow copy will be returned to Total Parenteral Nutrition Services.
2.2.3 Nonstandard/Late Deliveries
2.2.3.1 Total Parenteral Nutrition Services will make every effort to accommodate late or early orders. Delivery will be arranged on a per case basis.
2.2.3.2 In the event orders are sent after the 1200 (EST) cut-off time, BPVAHCS pharmacist must contact Total Parenteral Nutrition Services personnel. Total Parenteral Nutrition Services pharmacist will work with BPVAHCS to determine delivery time of the product.
2.2.3.3 Total Parenteral Nutrition Services will notify BPVAHCS if a delivery is late in leaving the Total Parenteral Nutrition Services facility and may result in a late delivery to the healthcare center.
| 2.3 | Product Labeling | |
| 2.3.1 | Each TPN must contain a label containing the following elements: | |
| 2.3.1.1 | Patient first and last name | |
| 2.3.1.2 | Patient date of birth | |
| 2.3.1.3 | All ingredients listed in patient specific prescription | |
| 2.3.1.4 | Specific quantities contained in product for each ingredient | |
| 2.4 | Discontinued Dose Policy | |
| 2.4.1 | If a TPN order is discontinued and/or is changed and Total Parenteral Nutrition Services is notified 1 hour prior to the delivery leaving Total Parenteral Nutrition Services, BPVAHCS will not be charged for the prescription. | |
| 2.4.2 | The completed order cannot be returned for credit. | |
| 2.5 | Product Recall | |
| 2.5.1 | Contractor shall notify the Contracting Officer administering the contract, within three (3) business days of any recall, removal, modification, or defective items supplied under contract, for appropriate action. Resolutions in such circumstance may be made by replacement of item at no cost to the Government, full credit of item towards future purchase, or any other method agreeable to both parties. Any freight costs incurred as a result shall be borne by the Contractor or credited to the Government, as appropriate. | |
| 2.6 | Returns | |
| 2.6.1 | Any item found to be defective or technically unacceptable as verified by the Contractor, shall be returned to the Contractor and replaced or credited in the same manner as specified under Product Recall. Returns of items for any other reason shall be determined at the mutual discretion of the Government and Contractor. The Contractor shall not be liable for replacement or crediting the Government for any item due to misuse or abuse by Government personnel. | |
| 2.7 | Quality Improvement | |
| 2.7.1 | Total Parenteral Nutrition Services participates in a continuous quality assessment and improvement program, which meets requirements, developed by JCAHO, the FDA, and ISO 9000. | |
| 2.7.2 | Total Parenteral Nutrition Services will meet all Federal, State, and JCAHO requirements for quality assurance. | |
| 2.8 | Product Cost/Packing List or Invoice | |
| 2.8.1 | An invoice will be delivered to BPVAHCS every two weeks showing the individual cost of each TPN per patient. Include the cost of delivery. | |
| 2.8.2 | Total Parenteral Nutrition Services will provide a packing slip with all deliveries, which includes patient names and product being delivered. | |
| 2.9 | Contract administration data | |
| 2.9.1 | The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract. The Contractor shall communicate with the contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitments or issue changes, which will affect price, quantity or quality of performance of this contract. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority, and no adjustment will be made in contract price to cover any increase in costs incurred as a result thereof. | |
| 2.10 | Identification, parking, smoking, and VA regulations | |
| 2.10.1 | The Contractor’s personnel shall always wear visible identification while on the premises of the VAHCS. It is the responsibility of the contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Service. The VA will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited on BPVAHCS campus. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violation of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, State or Municipal court. |