Statement of Work Mobile Bay Pipe Insulation 2123403Y61A2398001.doc
DOC document 38 KB Posted
- Attached to
- INSULATE AND COVER PIPING
- Solicitation number
- 70Z04023Q61171Y00
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 140-WTGB_514_19_1_-_A.pdf | ||
| 70Z04023Q61171Y00 RFQ.docx | DOCX document | |
| 140-WTGB_528_8_1_-_A.pdf | ||
| 140-WTGB_514_16_1_-_B.pdf | ||
| 140-WTGB_528_6_1_-_F.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
Chill Water Pipe Covering/Insulation Services
PR # 2123403Y61A2398001
140’ CGC MOBILE BAY
YARD POC: Carl Weiland (410) 320-9154
TENTATIVE START DATE: 05/15/23
FINAL START DATE WILL BE IDENTIFIED BY THE POC
Location: 36 South Neenah Ave., Sturgeon Bay, Wisconsin, 54235 The Coast Guard requires contractor services for marine pipe cover / insulator services to occur in Sturgeon Bay, Wisconsin. The services required shall be performed on-board 140’ Mobile Bay. The contractor services shall insulate the Condensate Drain, Chilled, & Hot water piping system using the Coast Guard drawing as references.
The piping to be insulated will vary in size from 1/2” to 4”. The type of insulation to be installed shall be Armaflex, rubber or equal to. The type of jacket to be installed is brattice cloth and sealfas over the Armaflex insulation. The thickness of the insulation is ¾” (MIL-P-15280). The contractor will be required to insulate approximately 1500 linear feet of piping including various irregular shaped items such as valves, fittings and flanges. In addition, the contractor shall provide all materials, personal and equipment needed to perform all work as required. Insulation should be snug to the piping with no gaps. The insulation services will be required in various locations on-board the ship.
The insulation of the Chill Water, Hot Water, & Condensate Drain Piping system is required upon completion of the cutters availability. Piping installation may not be 100% IAW the drawings, so a site survey will be required to insure all pipe sizes and materials needed. The CG YARD prefers the contractor shall perform these tasks on second shift, starting anytime after 1600. Contractor shall check in with the Ship’s Superintendent, Pipe Shop Foreman, or Leader at the beginning of each work day. The Coast Guard Yard will provide system drawings for insulating guidance.
No ship check is required for the bidding process.