This is a Statement of Work for a one-time repair service at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The Department of Veterans Affairs requires a contractor to replace tube bundles and control valves on three Aquaplex domestic hot water heaters (Model 150L5A-ISD, Serial No. 1214139097) in the facility's boiler plant, along with the installation of three secondary steam isolation valves. The scope of work includes proper disposal of existing components, plumbing verification, installation of new tube bundles and control valves, system testing, operational verification, and comprehensive startup training and documentation for VA employees. The contractor must provide all labor, materials, supplies, tools, equipment, and qualified personnel, with only new standard parts manufactured by the equipment maker or approved equivalents permitted for use.

Contractor qualifications require demonstrated experience in removal, rebuilding, and replacement of Aquaplex tube bundles, control valves, and secondary steam isolation systems, along with startup and commissioning capabilities. The contractor must furnish all tools, test equipment, service manuals, and technical documentation necessary for the work and maintain adequate personal liability and property damage insurance. Work shall be performed Monday through Friday from 7:30 a.m. to 4:00 p.m., with scheduling coordinated two weeks in advance for any operations that may disrupt medical center activities. The contract period of performance is 90 days from award, with all work completed at the facility located at 1700 N. Wheeling Street, Aurora, Colorado 80045. Payment will be made in arrears upon satisfactory completion and submission of properly prepared invoices through the Tungsten system, and all contractor employees must complete VA records management training.

View the file

Other files

File Type Posted
36C25926Q0635 0001.docx DOCX document
RFO 52.225-2 Buy American Certificate.pdf PDF
36C25926Q0635.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS – Eastern Colorado Healthcare Boiler Plant Domestic Hot Water Heater Bundle Repair

STATEMENT OF WORK

1. Background

The Rocky Mountain Regional VA Medical Center (RMRVAMC) has three (3) Aquaplex domestic hot water heaters that provide efficient and reliable hot water heating for various applications throughout the facility. The purpose of this service contract is to have a contractor furnish all labor, materials, supplies, tools, equipment, and qualified personnel to replace Aquaplex tube bundles or equivalent tube bundles along with control valves sized for current load in the Boiler Plant while adding three secondary steam isolations. Equipment is located in the Boiler Plant at the Rocky Mountain Regional VA Medical Center, 1700 N Wheeling Street, Aurora, CO 80045.

2. Objective:

· Replacement of one (1) set of tube bundles

· Replacement of three (3) sets of control valves on Aquaplex domestic hot water heaters

· Add three (3) secondary steam isolation to Aquaplex domestic hot water heater

3. Scope:

· Proper disposal of all spent tube bundles and control valves

· Check plumbing for proper isolation of each domestic water heater

· Installation of the new tube bundles, properly and according to specifications

· Installation of the new control valves, properly and according to specifications

· Verify and check all operating parameters are within safe levels

· Provide start-up and training of the system to VA employees

· Test and ensure full operation is restored

· Complete detailed report for review and training of the units

4. Site Specific Equipment Information:

Aquaplex Hot Water Heater

· Model: 150L5A-ISD

· Serial No. 1214139097 Control Valves

· MVF461H50-30/ BPZ:MVF461H50-30

· MVF461H32-12/ BPZ:MVF461H32-12

5. Contractor Qualifications and Responsibilities:

· Contractors shall be qualified and skilled employees with previous work experience in removal, rebuilding and replacing Aquaplex tube bundles or equivalent tube bundles.

· Contractors shall be qualified and skilled employees with previous work experience in removal, rebuilding and replacing control valves and secondary steam isolation

· Contractors must demonstrate having performed labor, start-up and commissioning of these units

· The contractor shall furnish all spare and replacement parts needed to service the equipment. The price of all parts used to perform all scheduled preventive, and unscheduled maintenance shall be included in the coverage. The Government will not pay for any parts provided (during either scheduled or unscheduled maintenance), by the contractor. Only new standard parts (manufactured by the maker of the equipment, or equal) shall be furnished to maintain the equipment.

· The contractor shall provide tools, (test) equipment, service manuals or service diagnostic software. The contractor shall obtain, have on file, and make available to its FSE's all operational and technical documentation (such as operational and service manuals, schematics, and parts list) necessary to meet the performance requirements and repair of the medical equipment. A reference list of applicable.

· Contractor shall take all precautions necessary to protect people and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees’ fault or negligence. Contractors shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government.

· The Government reserves the right to accept or reject Contractor’s employees for the rendering of services. Complaints concerning Contract Personnel’s performance or conduct will be dealt with by the Contractor and POC with the final decision being made by the Contracting Officer.

6. Report Requirements:

· Furnish report within one week of each facility inspection in “Microsoft Word” format by email to the FMS POC.

7. Resources:

· The Government will not furnish any resources for the fulfillment of the services required under this contract. The contractor must provide all tools, equipment, materials, transportation, professional expertise, personnel, and supervision for maintenance services required under this contract. The contractor shall remove all debris and trash from facility upon completion of work.

8. Hours of Work and Scheduling A. Scheduling

· The work will be performed Monday through Friday from 7:30am to 4:00pm. The majority of the work will have minimal impact on the operation of the VA Medical Center.

· Any potential disruption to ongoing medical center operations shall be coordinated 2 weeks in advance and shall be subject to review and approval by the CO/POC.

· Any other disruption of operations in any building shall be scheduled at least one week in advance with the CO/POC. Work shall be scheduled to allow continuous operation of all facilities to the greatest extent possible.

Federal Holidays:

New Year’s Day Martin Luther King Jr’s Day Presidents Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

If the holiday falls on a Sunday, the following Monday will be observed as a national holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.

B. Contractor Check-In

· All Contractor personnel working onsite at the VA facility shall check in and out with the POC located in Building L (ENC). Access to work areas, and performance monitoring, will be provided by the POC. In all cases, the CO/POC shall be notified of any changes which may affect the response time of vital equipment.

9. Period of Performance

· This requirement is for a one-time service request to be completed within 90 days of award.

10. Place of Performance All work will be performed at Rocky Mountain Regional VA Medical Center at 1700 N. Wheeling Street, Aurora, Colorado, 80045

11. Invoicing and Payment:

· Payment of services rendered under this contract shall be made in arrears upon satisfactory completion of each service and receipt of a properly prepared invoice and submitted by the Contractor to the payment address specified by Contracting. Invoices shall reference the Contract Number and Purchase Order Number, Manifest Number(s), provide a complete and accurate description of services/ supplies delivered/ rendered, including dates of performance, amounts, unit prices, extended totals and any other data relevant for payment purposes.

· Payments also must be submitted through Tungsten to be paid

12. Records Management Language A. This clause applies to all contractors whose employees create, work with, or otherwise handle Federal records, as defined below:

“Federal Record” as defined in 44 U.S.C. 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the information value of data in them.

The term Federal Record:

1. Includes (Agency) records.

2. Does not include personal materials.

3. Applies to records created, received, or maintained by Contractors to the (Agency) contract.

4. May include deliverables and documentation as associated with deliverables.

13. TRAINING: All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

14. FLOWDOWN OF REQUIREMENTS TO SUBCONTRACTORS:

1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract, and require written subcontractor acknowledgement of same.

2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.