Statement of Work - HAZMAT Removal Services.pdf
PDF 627 KB Posted
- Attached to
- 82 CES HAZMAT Removal Services
- Solicitation number
- FA302026Q0096
About this file
This is a Statement of Work for soil remediation of petroleum (POL) contamination at Sheppard Air Force Base in Wichita County, Texas. The work involves excavation and removal of approximately 8 cubic yards of POL-contaminated soil and grass, with a performance period of 60 calendar days from the Notice to Proceed.
The contractor must conduct initial contamination sampling and three clearance samples in accordance with Texas Commission on Environmental Quality Risk Reduction Program requirements, utilizing NELAP-accredited laboratories for testing including Total Petroleum Hydrocarbons (TPH), BTEX, and other analyses as required by the disposal facility. All sample results must be submitted to 82 CES/CEIE in writing prior to soil excavation and removal. The contractor is responsible for identifying the disposal landfill/facility destination, authorized transporters, container specifications, and all transport and disposal costs. Contaminated soil must be containerized to prevent water infiltration and stored adjacent to the excavation site until clearance samples approve transport. The contractor must provide weight tickets and final manifests within 30 days of delivery, with government signature required on manifests as waste generator. Upon clearance, the contractor shall replace excavated areas with clean fill dirt meeting specific requirements and restore grass using the sodding method with approved species from the Integrated Natural Resource Management Plan, matching pre-existing conditions. Work is scheduled for 7:30 a.m. to 4:30 p.m., Monday through Friday, with provisions for after-hours or weekend work at no additional cost. The contractor must comply with all environmental, safety, and fire regulations, obtain AF Form 103 digging permits, maintain an on-site project superintendent, complete required environmental management system training, and comply with storm water permit requirements, hazardous materials handling protocols, and natural resource protection guidelines including tree replacement and bird protection measures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question and Answers - HAZMAT.pdf | ||
| Amendemnt 1. CES Hazmat Services.pdf | ||
| TCEQ TRRP Table 5.pdf | ||
| Provisions and Clauses.pdf | ||
| RFO Combo - HAZMAT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Soil Remediation for POL Contamination - 1
CUI
CUI
STATEMENT OF WORK FOR
Soil Remediation for POL Contamination
August 2026
PREPARED BY
Rhonda Lofgren
82 CES/CEIE
SHEPPARD AFB TX 76311
PROJECT MANAGER: Rhonda Lofgren
PHONE: (940) 676-5715
STATEMENT OF WORK
Statement of Work Soil Remediation for POL Contamination - 1
CUI
CUI
PART 1 - GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS:
Project Description: The work to be performed under this contract and in accordance with these contract documents consists of furnishing all necessary plant, labor, materials, and incidental related work in execution of remediation of approximately eight (8) cubic yards of POL contaminated soils/grasses and performing all work shown and described in the contract documents. The contractor shall retrieve: 1. Initial contaminated soil sample, and 3. Clearance samples IAW TCEQ TX Risk Reduction
Program response action requirements table for remediation. (see attached table with highlighted area on page 16 for desired clean-up level). (after excavation; 3# could be multiple samples depending on excavation depth/width of contaminated area). Send all samples to a laboratory that is NELAP accredited for Texas. Testing to include TPH, BTEX and any other analytical tests as required by the disposal landfill/facility. Sample results packages must be provided to 82 CES/CEIE in writing for review prior to soil excavation/removal/transport.
The contractor shall report to 82 CES/CEIE; the disposal landfill/facility destination, in writing for waste profile determination.
The contractor shall provide 82 CES/CEIE names of authorized transporter/billing company/container type and size in writing. Transport and disposal costs are the responsibility of the contractor.
The contractor shall excavate POL contaminated soil/grasses to the extent of confirmed absence of contamination. The contractor shall retrieve: Clearance samples to match background sample analysis. (after excavation; could be multiple samples depending on excavation depth/width of contaminated area). Send all samples to a laboratory that is
NELAP accredited for Texas. Testing to include TPH, BTEX and any other analytical tests as required by the disposal landfill/facility.
Sample results package must be provided to 82 CES/CEIE in writing for review prior to transport.
The contractor shall containerize remediated soil in such a fashion as to protect water from entering the container, until clearance sample result review renders the area of concern free of POL contaminants. This container will be adjacent to the excavation site until such time as transport has been approved by 82 CES/CEIE.
The contractor is required to transport with manifest that must have government
Statement of Work Soil Remediation for POL Contamination - 2
CUI
signature as the generator of waste (must give 24-hour notice prior to transport).
The contractor is required to provide a copy of weight ticket and final manifest from receiving landfill/facility to 82 CES/CEIE no later than 30 days from delivery of waste.
The contractor shall replace soil/grass such that the grass that was present in pre-existing conditions is replaced and/or restored with the same type of grass to its condition in as good or better condition as prior to remediation. IAW Sheppard AFB INRMP, Section 7.7.1: The topsoil sources must be inspected by the Grounds Contracting Officer's Representative, USDA Wildlife Biologist, or Natural Resource Manager to determine if the selected soils meet the following requirements. The topsoil must be a sandy loam or sandy clay loam from the top four- to six-inch layer of soil. Topsoil must be fertile, friable, natural surface soil, free of subsoil, clods, shale, trash, toxic substances, stones, Johnsongrass (Sorghum halepense), all grasses from the Cyperaceae family, and other objectionable or hard-to-eradicate vegetation. Vegetation of the clean fill dirt will need to occur in accordance with the table below that details the times and manners that are acceptable for revegetating the area. Please see table below:
Statement of Work Soil Remediation for POL Contamination - 3
CUI
Grass replacement shall be accomplished using the sodding method as provided for in the specifications and shall be considered subsidiary to the project cost and reflected in the price bid for the remediation project.
The Contractor shall always maintain the existing Security fence integrity. The
Contractor must apply fence fabric and other safety hazard warning indicators to excavation site which would prohibit access. There will be no excavation access left
Statement of Work Soil Remediation for POL Contamination - 4
CUI
open while waiting for the backfill and restoration. Site opening must remain secure until such time.
A. Location: The work shall be located at Sheppard Air Force Base (SAFB) which is located in Wichita County, in the northern part of Wichita Falls, TX. Project performance period will be a total of 60 calendar days from the notice to proceed (NTP) date to include time to design/construct/deliver materials/assemble/install.
B. Work hours, utility outages and special conditions: 1. Work hours are 7:30 a.m. to 4:30 p.m., Monday through Friday, exclusive of Federal holidays. At the government’s option and with approval of the contracting officer, work may be permitted on Federal holidays, weekends or after 4:30 p.m. daily at no additional cost to the government. The contractor shall provide written notice to the contracting officer at least 48 hours before starting the scheduled work. 2. Occupancy of Premises: The contractor will perform all work with the immediate work unoccupied. The contractor shall coordinate all work with the facility managers, the contracting officer (CO), and the construction inspector. Before work is started, the contractor shall arrange with the CO a sequence of procedures, means of access, and space for storage of materials and equipment. 3. Utility Outages: When an extended utility outage is necessary to perform the contract work in an occupied facility, regardless of whether or not the work area itself is occupied, the contractor shall perform the outage during non-duty hours at no additional cost to the government, unless otherwise approved by the contracting officer. The contractor shall give written notice two weeks in advance of any scheduled outage. 4. Base Fire Regulations: The contractor shall comply with Base Fire Regulations in SAFBI 32-2001, 29 Dec 10. The contractor shall use no explosives or fire in performing the work.
The contractor shall understand and comply with current Occupational Safety and Health Administration welding and cutting requirements. 5. Safety: The contractor shall comply with all applicable federal, state and local safety requirements. The contractor is also required to comply with the American General Contractors' Safety Manual and the Occupational Safety and Health Act. 6. Antiterrorism Force Protection: Sheppard Air Force Base has an antiterrorism program that is responsible for helping secure and protect the base and its personnel from terrorist attacks. As a contractor working on Sheppard Air Force Base, you and your sub-contractors are required to obey all orders from Security Forces and adhere to all security measures implemented as a result of Force Protection Condition changes (security posture changes). Additionally, you and your subcontractors are expected to report to base security forces any suspicious activities, packages, or items you see while conducting work on Sheppard Air Force Base. Suspicious activities could include personnel conducting surveillance of the installation, unauthorized personnel requesting access to the installation, or somebody asking a lot of questions about the base. In an effort to help familiarize you, your employees, and sub-contractors about antiterrorism, Sheppard Air Force Base has an antiterrorism binder with all of the pertinent information for awareness training available for mandatory review at the Pass and Registration Office located at the Missile Rd Gate (building #1405) of Sheppard Air Force Base, Texas. 7. Tobacco Use of Air Force Installations: Executive Order 13058 and 41 CFR 102-74 establishes that it is the policy of the executive branch to establish a smoke-free environment
Statement of Work Soil Remediation for POL Contamination - 5
CUI
for Federal employees and members of the public visiting or using Federal facilities. IAW AFI 40-102, tobacco use is prohibited on AF installations, except in “Designated Tobacco Areas.” Tobacco includes, but is not limited to, cigars, cigarettes, electronic cigarettes (e-cigarettes), stem pipes, water pipes, hookahs, and smokeless products that are chewed, dipped, or sniffed. 8. Use of Cellular Telephones While Operating a Vehicle is Prohibited: In accordance with Air Force Instruction 31-218(I), Para 4-2c(3), vehicle operators on a DOD installation and operators of Government owned vehicles will not use cell phones unless the vehicle is safely parked or unless they are using a hand–free device. The wearing of any other portable headphones, earphones, or other listening devices (except for hands–free cellular phones) while operating a motor vehicle is prohibited. Use of those devices impairs driving and masks or prevents recognition of emergency signals, alarms, announcements, the approach of vehicles, and human speech.
1.2 REFERENCES: (NOT USED.)
1.3 CONTRACT DRAWINGS: (NOT USED.)
1.4 EXISTING WORK: In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
A. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
B. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the CO. At the completion of operations, existing work shall be in a condition equal to that which existed before new work started as approved by the CO.
C. The contractor shall provide documentation in the form of drawing markups and/or photographs of existing damage within the work area prior to beginning construction. Any damage that is found that was not documented as existing shall become the responsibility of the contractor to repair.
1.5 ON-SITE PERMITS:
A. Authorization for Work: The contractor shall complete AF Form 103, Base Civil Engineering Work Clearance Report (commonly referred to as a “Digging Permit”) prior to starting any work regardless of if excavation will be necessary. Submit the completed form to the construction inspector.
B. Approval for Excavation: Before performing any excavation, grading, trenching or other operations whereby existing underground utilities may be damaged, the contractor shall complete AF Form 103. The form, as received by the contractor, will list points of contact and telephone numbers for each of the various underground utilities (telephone, gas, water, electrical, etc.) existing in the work area. It is the contractor’s responsibility to contact the point of contact for each utility listed, request that any utilities existing in the work area be marked and obtain each point of contact's certification on the form. After each point of contact has been contacted and has certified such by signing or initialing the form, the form must then be delivered to the construction inspector.
1.6 CHARACTER OF WORK AND MECHANICS: The contractor shall execute the work in the best and most workmanlike manner by qualified, careful and efficient mechanics skilled in the trade.
The contractor’s work must be in strict accordance with the contract documents and standards of the industry. Only certified journeymen in respective trades, or apprentices under the direct
Statement of Work Soil Remediation for POL Contamination - 6
CUI
supervision of certified journeymen, may install, supervise installation of, or alter or repair electrical and mechanical systems. Electrical and mechanical systems include, but are not limited to pipe, plumbing, HVAC systems, electrical wiring, fire protection systems, welding, equipment and devices. The contracting officer will recognize as certification a current state or municipal tested and issued plumbing/gas/air conditioning and electrical license upon approval. The license must be available for government inspection at the pre-work conference and from mechanics and electricians at the jobsite throughout contract operations. For those trades not requiring a license, the contractor shall have a minimum of three years’ experience in the trade. The government reserves the right to request work references.
1.7 SITE PROJECT SUPERINTENDENT: The contractor is responsible for quality control and shall establish and maintain an effective quality control system to include a designated project superintendent who will be on-site at all times while work is in progress. The quality control system shall consist of plans, procedures and organization necessary to produce an end product which complies with the contract requirements. The system shall cover all construction operations, both on-site and off-site. The site project superintendent will be held responsible for the quality of work on the job and shall ensure that all work performed by the general contractor’s forces and by subcontractors is in full compliance with the construction documents. The site project superintendent will be responsible for the overall construction activities at the site, including scheduling, quality and production. The site project superintendent shall maintain a physical presence at the site and shall be responsible for all construction and construction- related activities at the site. Prior to the pre-construction conference, the general contractor shall provide the name and cell phone number of the designated on-site project superintendent in writing to the contracting officer. This information shall remain on file with the contracting officer throughout the duration of the contract and shall be updated in writing by the general contractor in the event of, and at least two working days prior to, a personnel change. The designated on-site project superintendent shall be required to attend the pre-construction conference. The project superintendent shall accomplish the AF Form 103 (Sheppard Air Force Base Construction Permit) prior to starting any work. The project superintendent shall submit the daily manpower and equipment report each day work is accomplished.
PART 2 - TECHNICAL REQUIREMENTS
2.1 GENERAL: Materials, equipment, and installation shall be in accordance with the requirements of the latest version of the applicable codes. For example, National Electrical Code.
PART 3 - ENVIRONMENTAL REQUIREMENTS Compliance with Environmental Laws: The contractor shall comply, and ensure that all subcontractors comply, with all applicable air force, federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Typically, environmental laws and regulations are codified and can be found in the Code of Federal regulations (CFR). The contractor shall also comply and assure us that all subcontractors comply with all applicable specific instructions, policies or references contained herein.
3.2 ENVIRONMENTAL MANAGEMENT SYSTEM TRAINING REQUIREMENTS: The Contractor must complete Air Force-provided initial environmental management system (EMS) awareness-level training. The awareness-level training need only be completed by supervisory personnel. The training can be obtained through The Environmental Awareness Course Hub (TEACH). The website is https://usaf.learningbuilder.com (no password is required to begin registration). The Contractor must complete the following awareness-level training.
A. Sheppard-Specific Environmental Management System (EMS), Compliance, and Pollution Prevention Training (Course # EMS110VNVP00468)
Statement of Work Soil Remediation for POL Contamination - 7
CUI
B. Prior to beginning any work on SAFB, the Contractor shall ensure and certify to the CO that all on-site supervisory personnel have completed the required training course. Any questions regarding TEACH training shall be addressed with the Installation Environmental Management System (EMS) Coordinator at 676-2001.
3.3 Hazardous Materials (HM): The contractor shall comply with all local, state and federal rules and regulations dealing with the handling, storage and use of HM. A product, chemical or substance is a HM if listed or described in 49 CFR 172.101 and 40 CFR 302-304. Additionally, all paints, thinners, adhesives, refrigerants, solvents, acids, petroleum products (such as greases, oils, or other lubricants), compressed gases or similar materials are subject to the same reporting and approval requirements as HM, defined above.
A. Executive Order 13423 directs to the maximum extent possible the reduction in usage of the following five priority chemicals: cadmium, lead, polychlorinated biphenyls (PCBs), mercury and naphthalene. There are known alternatives to the priority chemicals or products containing them. For example, electronic thermostats can be used in place of mercury-bearing switches;
solders containing copper or silver can substitute for solder containing lead. The contractor shall, to the maximum extent practicable, submit for approval product alternatives to HM. Their use is subject to disapproval if viable alternatives exist. 1. The contractor shall submit documentation specified below and obtain approval from the CO an authorization to use each HM intended for use on the project, or any other material that has potential risk to pollute or cause environmental harm. Submissions must provide the Safety Data Sheet (SDS), container size, and other appropriate supporting documentation for each HM used. The contractor shall submit the documentation to and obtain from the CO any change in approved type or container size of HM. 2. The contractor shall track and report use of the HM on the job site. At project completion the contractor shall report to the CO quantities used and remove all unused HM from SAFB.
The contractor shall not dispose of HM in base dumpsters, sewer inlets, grounds, or other unauthorized locations. The contractor shall remediate contamination resulting from unauthorized disposal of HM, as directed by the CO. 3. The contractor shall submit a request and obtain approval from the CO authorization to store HM on SAFB. The request shall explain contractor storage practices, which must comply with regulations, policies, plans, and procedures outlined within this SOW or as prescribed by the CO. The contractor shall store all hazardous materials in a contractor supplied trailer or storage unit, which shall be leak proof or contain secondary containment devices. All storage shall be secured when contract personnel are not present.
3.4 Non-Hazardous Solid Waste Management: In accordance with DoD Integrated Solid Waste Management Metrics, SAFB will divert 65% of non-hazardous solid waste by Fiscal Year (FY) 2030. SAFB will also divert 75% of Construction and Demolition (C&D) Debris by FY 2030. The contractor will make every attempt to divert as much non-hazardous solid waste and C&D debris from landfills as possible.
A. Place solid waste (excluding clearing debris) in containers which are emptied on a regular schedule. Handling, storage, and disposal must be conducted to prevent contamination. Employ segregation measures so that no hazardous or toxic waste will become co-mingled with solid waste. Containers should be covered to prevent wind from blowing waste out of containers, prevent rain infiltration into wastes, and prevent random disposal of non-project wastes.
Transport solid waste off government property and dispose of it in compliance with federal, state, and local requirements for solid waste disposal. A Subtitle D RCRA permitted landfill will be the minimum acceptable offsite solid waste disposal option. Verify that the selected transporters and
Statement of Work Soil Remediation for POL Contamination - 8
CUI
disposal facilities have the necessary permits and licenses to operate. Comply with federal, state, and local laws and regulations pertaining to the use of landfill areas.
B. Records shall be maintained to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed of by landfill or incineration. Quantities may be measured by weight or by volume but must be consistent throughout. List each type of waste separately noting the disposal or diversion date. Identify the landfill, recycling center, waste processor, or other organizations used to process or receive the solid waste. Provide explanations for any waste not recycled or reused. With each waste report, submit updated documentation for solid waste disposal and diversion, and submit manifests, weight tickets, receipts, and invoices specifically identifying the project and waste material. The records shall be made available to the Contracting Officer during construction, and a copy of the records shall be delivered to the Contracting Officer and 82 CES/CEIE upon completion of the construction.
3.5 Hazardous and Special Waste Generated by the Contractor:
A. With exception of wastes specified below, hazardous and special wastes are identified and defined in 40 CFR 261. Additionally waste materials are subject to the requirements of this document if they are identified or defined as either Hazardous or Special Waste by the Texas Commission on Environmental Quality (TCEQ) in 30 Texas Administrative Code (TAC) 324, 330-335. The contractor shall advise the Contracting Officer and 82 CES/CEIE immediately of any generation of hazardous or special waste.
B. Disposal: The Contractor shall identify, characterize (to include sampling per disposal facility requirements), containerize, and transport hazardous wastes to a permitted disposal facility in accordance with the requirements of 40 CFR 260-279, 30 TAC 324, 330-335, and the SAFB Hazardous Waste Management Plan. The contractor shall coordinate with 82 CES/CEIE to determine the testing requirements and coordinate the profiling of the waste and manifests for the shipment. The manifest will be provided by 82 CES/CEIE and must be signed by the designated government representative at the time of shipment. The contractor shall submit a copy of the completed manifest and certificates of destruction and/or recycling to the Contracting Officer and 82 CES/CEIE no later than thirty (30) days after the waste has been shipped from SAFB. The manifest must show proper receiving and disposal of waste.
3.6 Unidentified or Inadvertent Disturbance of Hazardous or Regulated Material/Waste Encountered by the Contractor: The contractor shall immediately notify the CO upon encountering any material not identified as such in the contract documents and thought to be hazardous to workers, personnel, or the environment.
A. Should the contractor encounter previously unidentified, but suspected ACM or LBP that must be disturbed to comply with the contract documents, the contractor shall cease all work that would disturb the suspect material and shall immediately notify the CO and CEIE. The government shall take steps as appropriate, to ascertain the material’s composition and determine any remedial actions necessary. The possibility exists for piping that is underground to unknowingly have asbestos wraps and/or adhesive sealers. The contractor shall notify the CO and CEIE should suspected material of this kind be encountered.
B. The contractor shall immediately report to the CO any disturbance of ACM or LBP, either through incidental, accidental or purposeful actions, not scheduled for removal under contract provisions contained elsewhere in this document.
3.7 Nuisance and Polluting Activity: The contractor shall not dump, discharge, or otherwise dispose of any harmful, nuisance, or regulated materials (such as concrete truck washout, vehicle
Statement of Work Soil Remediation for POL Contamination - 9
CUI
maintenance fluids, residue from saw cutting operations, solid waste and hazardous substances, etc.) into building drains, site drains, streams, waterways, holding ponds or to the ground surface.
The contractor shall not construct, place haul roads, stockpiles, staging areas, or other project specific locations (PSLs) in or near waters of the United States. The contractor shall not place, nor discharge, solid materials, including building materials into water of the state, except as authorized by the CO. The contractor shall, if directed by the CO, perform other tasks necessary to remediate contamination as a result of improper polluting activity.
3.8 Natural Resources: Per the Sheppard Air Force Base Integrated Natural Resource Management Plan (INRMP): “Contractors and base personnel will use necessary effective means to prevent construction related injury to trees and shrubs near construction sites.” In order to protect the trees and plants located within the project site that are not included within clearing areas, the following guidelines are provided:
1) On-site traffic which is required for construction activities should utilize existing roads to the maximum extent possible to prevent damage to vegetation/ground cover and trees which otherwise would not be disturbed.
2) Construction activities adjacent to vegetation, or in areas that do not require disturbance, should be conducted to prevent unnecessary damage to the vegetated areas. ALL vehicle operators should be made aware of vegetated areas in which construction and/or transport activities are not to occur. Physical barriers such as fences or barricades around individuals or groups of trees or plants can be used.
3) Material stockpiles or equipment storage should not be located within vegetated areas that are not already slated for alteration. Per the INRMP: “Vehicles or equipment will never be parked within the drip line (outermost circumference of a tree canopy) of any tree.”
4) Trees and vegetative matter that require removal in order to complete contract requirements should be removed without damage to adjacent trees and plants. Trained personnel should conduct such removals.
5) Existing trees cannot be used as anchors for any activities occurring on-site. Trees that are not slated for removal cannot be used for the placement of signs, placards, hooks, or any similar devices that would injure the tree. Limbs of trees that are to be retained shall not be used for the hanging of any materials. When possible, excavation within the root circumference of trees that are to be retained should be avoided.
*Trees to be retained that are damaged unnecessarily during construction activities should be repaired or replaced per the INRMP at no expense to the government.
Trees and shrubs located on or near the proposed construction site that are removed will be replaced in accordance with the INRMP tree policy. If a tree less than 10 inches diameter at breast height (DBH) has been slated for removal, it will be replaced on a two-for-one basis, using trees greater than 2.5 inches DBH. Trees greater than 10 inches DBH will be replaced on a three- for-one basis using trees greater than 2.5 inches DBH. The cost to relocate, replace, or remove trees located on a proposed facility construction site will be funded as part of the supporting utilities.
Replacement trees will be chosen from the INRMP list of approved trees.
The contractor shall avoid the take of non-game birds and migratory birds, their young, and their nests, in compliance with the Texas Parks and Wildlife Code Title 5: Wildlife and Plant Conservation, Subtitle B, Hunting and Fishing, Chapter 64, Birds Subchapter A: General Provisions. Measures will be taken to comply with the following:
Sec.64.002. PROTECTION OF NON-GAME BIRDS. (a) Except as provided by this code, no
Statement of Work Soil Remediation for POL Contamination - 10
CUI
person may:
(1) catch, kill, injure, pursue, or possess, dead or alive, or purchase, sell, expose for sale, transport, ship, or receive or deliver for transportation, a bird that is not a game bird;
(2) possess any part of the plumage, skin, or body of a bird that is not a game bird; or
(3) disturb or destroy the eggs, nest, or young of a bird that is not a game bird. Sec.64.003.
DESTROYING NESTS OR EGGS. No person may destroy or take the nest, eggs, or young of any wild game bird, wild bird, or wild fowl protected by this code except as provided in this code.
Sec.64.005. PENALTY. A person who violates a provision of this subchapter commits an offense that is a Class C Parks and Wildlife Code misdemeanor.
3.9 Cultural Resources: The policy of SAFB concerning cultural resources is found in the SAFB Integrated Cultural Resources Management Plan (ICRMP) which prescribes procedures and guidance for the conservation, maintenance and protection of cultural resources and facilities, compatible with the military mission and in accordance with Department of Defense policy (required by DAFMAN 32-7003). Cultural resources, in this context, refer to physical remains of any prehistoric, Native American, or historic district, site, building, structure or object significant in American history, architecture, archaeology, engineering, or culture. Apparent archaeological materials would include accumulations of broken (or whole) pottery vessels, stone tools like arrowheads, sharp flakes that could have served as knives or scraping implements or grinding implements (manos or metates), bones, charcoal stains possibly with broken rock fragments, and rock or adobe concentrations suggestive of walls. The contractor shall immediately STOP work and notify the CO should suspected archeological sites or materials, as described above, be encountered in the project area. At its discretion, the government may investigate the site/artifacts in accordance with Section 106 of the National Historic Preservation Act. Until resolution of the matter, the contractor may be stopped from continuing work at the discretion of the CO.
3.10 Site Maintenance and Storage:
A. The contractor shall keep all storage areas free of debris, refuse, spills, leaks, stains, splashes and excessive materials and maintain them in a neat, clean and safe condition. The contractor shall immediately clean up HM spills and dispose of waste by means specified elsewhere in this SOW. The contractor shall, if directed by the CO, perform other tasks, such as soil analysis, necessary to remediate the spill site.
B. The contractor’s storage and parking will be near the job site, as designated by the contracting officer.
3.11 Temporary Erosion, Sedimentation, and Environmental Permits and Controls:
A. Storm Water Requirements: TCEQ reissued (effective Mar 5, 2023) the TPDES Construction General Permit TXR150000, which authorizes the discharge of storm water runoff associated with small and large construction sites and certain non-storm water discharges into surface water in the state. SAFB is a primary operator, and the contractor is a secondary operator as identified by the CGP. Under the provisions of Part III, Section A of the permit, SAFB has provided and received approval from the TCEQ a SWP3, in compliance with the CGP; the contractor, under this permit section, is responsible to submit an application for a permit and to implement SWP3 for the project site. 1. Area Disturbed: Determination of the total disturbed area of this project is outlined by the permit. Should there be multiple locations of construction activities on this project, the sum of areas from the non-contiguous sites are added to determine total disturbed area. 2. Permit Application and Approval: The contractor shall submit to the TECQ an application compliant with the CGP. A fact sheet providing information on application for a permit may
Statement of Work Soil Remediation for POL Contamination - 11
CUI
be found on the following TCEQ website:
https://www.tceq.texas.gov/downloads/permitting/stormwater/general/construction/2023-cgp-factsheet.pdf 3. Detailed rules for submitting an application are found on the following TCEQ website:
https://www.tceq.texas.gov/permitting/stormwater/construction 4. Best Management Practices (BMPs) and Site Maintenance: BMPs and other requirements required of the operator by the permit are determined by the amount of disturbed area. The contractor shall conduct construction activities using BMPs regardless of area disturbed, and shall outline those BMPs in the SWP3, should it be required. The contractor shall remove off-site accumulations of sediment should they escape from the project site at a frequency sufficient to minimize off-site impacts and shall remove fugitive sediment from streets or highways within 24-hours and prior to next rain event to prevent washing into sewers or base outfalls.
B. TCEQ Construction Storm Water Permit and Storm Water Pollution Prevention Plan (SWP3) Authorization: The contractor shall submit and obtain approval from the CO a SWP3 if the amount of disturbed area for the total construction site(s) exceeds one acre. The SWP3 must comply with the required information prescribed by Part III of the CGP, and include contractor proposals for storm water inspections, pre and post storm water run-off mitigation plans, soil erosion and control requirements, pollution prevention measures, and storm water run-off monitoring. Once the SWP3 is approved by CO, the contractor shall submit a Notice of Intent (NOI), if required, to the TCEQ for authorization to commence construction activities and shall not begin any work that will disturb any area until that authorization is received and forwarded to the CO. If required by the areal extent of the disturbed area, the contractor shall submit to the TCEQ a Notice of Change (NOC), Notice of Termination (NOT), if required by the permit.
C. Construction Site Notices and Inspections: The contractor shall comply with the requirements of the SWP3 approved by the TECQ. Requirements may include posting of the construction site notice. The contractor shall conduct regular site inspection and rainfall event inspection in accordance with the SWP3. The contractor shall provide to the inspector documentation from those inspections within 24 hours of their completion.
3.12 Other Storm Water Permits The contractor will comply with the Texas Pollutant Discharge Elimination System (TPDES) General Permit TXR040087 for Small Municipal Separate Storm Sewer Systems (MS4) dated effective 13 Dec 13 and its Storm Water Management Program (SWMP). This requires all TCEQ (storm water) construction sites to be available for government compliance inspection to assure compliance with all provisions of the permit discussed above.
3.13 Petroleum Storage: The contractor shall store all fuel or petroleum products, whether new or used, in appropriate containers and within a concrete, or earthen berm area with an impermeable liner (40 Mil), or other containment as approved by the BCE. All storage areas shall be marked with appropriate signs (i.e., Flammable Storage - No Smoking Within 50 ft). All fuel tanks and petroleum storage containers shall be structurally sound and in good condition, be kept sealed when not in use, and be grounded and bonded in accordance with NFPA guidelines. The containment area shall be sized to hold fluid volume equal to 110% of the largest storage container, with a minimum of one foot of freeboard. The contractor shall maintain the containment area to its original conditions throughout the duration of use. The contractor shall immediately clean up and dispose of any evidence of a fuel or oil spill in conformance with all federal and state regulations.
Contaminated soil from petroleum product storage/spills shall be considered special waste in compliance with 30 TAC 324, 330-335 and shall be handled, stored, transported, and disposed as such in accordance with the SAFB Hazardous Waste Management Plan. Costs of all soil tests, transportation, disposal, backfill, etc. associated with any spill caused by the contractor shall be a
Statement of Work Soil Remediation for POL Contamination - 12
CUI
responsibility of the contractor. The contractor shall drain any accumulation of uncontaminated rainwater from the secondary containment area in accordance with SAFB Storm Water Pollution Prevention Plan (SWP3).
Attachments:
1) AF Form 103
2) TCEQ TRRP Table
END OF SECTION