Statement of Work Ft Bliss Waste Collection.docx
DOCX document 29 KB Posted
- Solicitation number
- 36C78626Q50100
About this file
This is a Statement of Work for solid waste collection and disposal services at Fort Bliss National Cemetery in El Paso, Texas. The contractor must provide comprehensive waste management including one six-yard dumpster for general waste with twice-weekly pickups (104 annual pickups), one 20-yard roll-off dumpster on an as-needed basis (estimated 12 jobs annually), and one 30-yard roll-off dumpster on an as-needed basis (estimated 5 jobs annually). The contractor must deliver on-call dumpsters within 24 hours of notification and retrieve them within 24 hours, with a maximum government holding period of five business days. Additional pickups beyond the fixed schedule must be completed within 24 hours of notification. The contract base period runs from April 1, 2026 through March 31, 2027, with four optional one-year renewal periods.
The contractor must demonstrate a minimum of three years of experience in waste services and provide key personnel information including names, titles, roles, and phone numbers. All personnel must speak English effectively, possess current Commercial Driver's Licenses with appropriate endorsements, and complete organizational driver training and OSHA safety programs. Contractors must maintain all required federal, state, and local licenses and permits, provide proof of insurance, and utilize only certified disposal facilities. All containers must be pre-approved, kept in good repair, pressure-washed twice monthly April through September and monthly October through March, steam-cleaned quarterly, and deodorized with EPA-approved products. Contractors are responsible for all damage caused by their operations, hazardous waste spill cleanup and reporting, and maintaining vehicles with required safety equipment and current DOT inspections. Monthly invoices must include itemized details with driver names, truck numbers, pickup dates, and service tickets signed by both the contractor's driver and the Contracting Officer's Representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis 36C78626Q50100.docx | DOCX document | |
| Wage Determination 2015-5229.txt | TXT text file | |
| Price Schedule Ft Bliss Waste Collection.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Bliss National Cemetery Solid Waste Removal Contract Statement of Work
1. Introduction The National Cemetery Administration is looking for interested parties who wish to submit an offer for the collection and disposal of solid waste that are generated on Government owned, and Government operated premises at Fort Bliss National Cemetery, 5200 Fred Wilson Boulevard, El Paso, TX 79916.
The contractor shall provide all management, supervision, labor, tools, materials, supplies equipment and any other items necessary to perform solid waste disposal for the National Cemetery. Contractor shall plan, schedule, coordinate and assure effective and economical completion of all contract actions described herein. This contract is for base period with the opportunity of four (4) option years.
2. Requirements
a. Requirement One - General Waste – One (1) 6 Yard Dumpster:
i. The contractor shall provide one (1) six yard dumpster for the disposal of general waste.
ii. The contractor shall perform pick-up (empty dumpster) twice weekly (104 pick-ups per year)
iii. The dumpster shall be located near the maintenance building. The contractor shall contact Fort Bliss personnel to ascertain the proper location for dumpster placement.
b. Requirement Two - General Waste On-Call - One (1) 20 Yard Roll-Off Dumpster (On-Call)
i. Upon notification of cemetery personnel, the contractor shall deliver, and pickup of one twenty-yard roll-off dumpster on an as needed basis. The government estimates that this service will be required 12 times (12 jobs) during each performance period of 12 months.
ii. The Contracting Officer Representative (COR) will contact the contractor to request the delivery of the dumpster. The contractor shall deliver the dumpster within 24 hours of receiving the call from the government. Cemetery personnel shall determine dumpster placement upon delivery of the dumpster.
iii. The Contracting Officer Representative (COR) will contact the contractor to request the retrieval of the dumpster. The contractor shall retrieve the dumpster within 24 hours of receiving the call from the government.
iv. Upon receipt, the government shall hold the on-call dumpster for no longer than five (5) business days.
c. Requirement Three - General Waste On-Call - One (1) 30 Yard Roll-Off Dumpster (On-Call)
i. Upon notification of cemetery personnel, the contractor shall deliver, and pickup of one thirty-yard roll-off dumpster on an as needed basis. The government estimates that this service will be required 5 times (5 jobs) during each performance period of 12 months.
ii. The Contracting Officer Representative (COR) will contact the contractor to request the delivery of the dumpster. The contractor shall deliver the dumpster within 24 hours of receiving the call from the government. Cemetery personnel shall determine dumpster placement upon delivery of the dumpster.
iii. The Contracting Officer Representative (COR) will contact the contractor to request the retrieval of the dumpster. The contractor shall retrieve the dumpster within 24 hours of receiving the call from the government.
iv. Upon receipt, the government shall hold the on-call dumpster for no longer than five (5) business days.
3. Goals The primary goal of this contract is for an experienced Contractor to successfully perform the “Required Service”, which is to collect and dispose of solid waste, as designated in this Statement of Work.
4. Required Service Services of this requirement will be on a fixed schedule. On occasion, the Contractor may be required to make additional pick-ups for a location on the fixed schedule. The Contracting Officer’s Representative (COR) or the designated Cemetery Staff will notify the Contractor by telephone. The Contractor shall perform within 24 hours of notification.
5. Contractor Requirements
a. Contractor Qualifications Prime Contractor shall have the necessary knowledge, skills, abilities, and resources to perform the work herein; within the best industry standards and practices; and have a minimum of three (3) years’ prior experience in the business of waste services. Furthermore, the Prime Contractor represents that it is familiar with the scope and nature of the work required by the National Cemetery and understands the conditions under which it will be obligated to operate. The Prime Contractor shall identify and submit with quote, to the Contracting Officer, the following information for the key personnel working directly on the project: name, title, role in the project and phone number. The Prime Contractor shall make no substitutions or subcontracts without obtaining prior Contracting Officer’s approval. The Prime Contractor shall describe the educational background, directly related work experience, professional development, and demonstrated performance record of key personnel.
b. Personnel Qualifications
i. Qualified personnel are essential for the performance of this contract to ensure that requests for pick-ups are responded to in a prompt, responsive, and safe manner. All Contractor personnel performing under this contract shall be able to speak English and communicate effectively.
ii. The Contractor shall provide drivers, as well as other employees necessary to work under this contract, which have participated in organizational driver training and OSHA required safety programs. Every driver performing under this contract shall possess a current, valid Commercial Driver’s License (CDL) with the appropriate endorsements when operating vehicles that require such licenses. Operators of any equipment or vehicles with-in the Cemetery shall follow all traffic rules and regulations such as but not limited to speed limits and weight restrictions.
iii. The individual proposed by the Contractor must be acceptable to the National Cemetery. There shall be no change in personnel holding this position without prior written approval of the National Cemetery. This individual is always subject to the rules and regulations of the National Cemetery Administration while on National Cemetery property. Dress and appearance must be neat and reflect the professional image of the Contractor’s company. The selected individuals shall always carry proper identification on them while on National Cemetery property.
c. Contractor Uniforms All workers on site shall be recognizable as employees of the contractor by wearing distinctive clothing bearing the name of the company, or by wearing appropriate badges which display the Contractor’s company and employee name.
d. Contractor Vehicles
i. The name or logo of the Contractor shall be clearly displayed on all vehicles used on the job site.
ii. The contractor shall use vehicles constructed to prevent loss of waste, or fluid/gray water from vehicle beds during transport and vehicles shall be covered or enclosed to prevent content from escaping. Any material thrown from or falling off the truck shall be immediately collected and returned to the truck by the Contractor. Any property damage resulting from an unsecure load or from material being thrown away shall be the responsibility of the contractor and must be reported immediately.
iii. The COR will inspect the Contractor’s vehicles, all containers, and surrounding areas for quality of service as stated in this contract.
iv. All vehicles must have required standard safety equipment, spill kits and current valid state inspection, DOT and/or other endorsements/requirements.
6. Contractor’s Representative Upon contract award, the Contractor shall furnish to the Contracting Officer the name of the person that has been designated and assigned to this contract as the Contractor’s Representative. The Contractor’s Representative will exercise overall management responsibility for the contract effort, receive technical direction, and handle problems arising under the contract, as well as serve as the primary point of contact for day-to-day operations of the program. The Contractor’s Representative is further responsible for coordinating matters of mutual concern with the Government representatives. The Contractor’s Representative may designate an inspector for purposes of this contract who may work with the contractor regarding extra pick-ups or minor issues if they arise.
7. Supervision
a. The Contractor shall supervise the removal, transportation, and disposal of the solid waste materials to ensure compliance with the terms and conditions of this contract.
b. The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance, and integrity. The Contractor shall be responsible for taking disciplinary actions with respect to Contractor’s employees as may be necessary.
c. The Contracting Officer may require removal from the job site any employee of the Contractor deemed to be unsuitable or otherwise objectionable or whose continued employment under this contract is deemed to be contrary to the public interest or inconsistent with the best interests of the Government.
8. Regulatory Compliance, Permits, Licenses.
a. The Contractor shall have applicable licenses and permits necessary to perform the work required under this contract prior to the start of performance. Copies of all such permits and licenses shall be current and valid. The Contractor shall provide to the Contracting Officer when requested, specifically, but not limited to, proof of all licenses, state, and local permits, as well as copies of organizational participation in driver training and safety programs. The Contractor shall provide evidence that every driver performing under this contract has a current and valid CDL with the appropriate endorsements if the vehicles they operate require such certification.
b. Contractor shall, without expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State, and municipal laws, codes, and regulations.
c. The Contractor shall submit to the Contracting Officer proof of insurance. The Contractor shall notify the Contracting Officer if the insurance coverage is terminated or modified below the limits originally provided to the Contracting Officer.
d. The Contractor shall perform operations associated with this contract in accordance with all current State/Federal environmental protection regulations applicable to the management of solid waste.
9. Disposal Sites and Facilities
a. The Contractor shall identify all sites/facilities to be used for waste disposal before contract performance. The Contractor shall inform the Contracting Officer at time of contract award, if any past or ongoing violations have occurred at disposal sites/facilities to be used by the Contractor. The Contractor shall notify the Contracting Officer of the specific violations, how they were rectified, if violations are ongoing, and whether the Contractor is still using that particular disposal site or facility.
b. If at any time during the course of the contract, a disposal site/facility is used by the Contractor receives a Notice of Violation, the Contractor shall immediately notify the Contracting Officer.
c. Contractor shall utilize only disposal sites/facilities that are certified by Federal, State, local agencies, and the Environmental Protection Agency. Contractor shall submit a listing (by company name, address and type of material accepted), with quote, of all disposal sites/facilities intended to be utilized under this contract to the Contracting Officer.
10. Billing
a. All payments are completed in the Tungsten e-Invoice Network. Fort Smith National Cemetery will pay the Contractor once per month for services performed.
b. For waste pickups, the Contractor shall submit an itemized invoice monthly. Invoices shall reflect the following:
i. Name and Address of the Contractor.
ii. Invoice date.
iii. Contract order number and line item(s).
iv. Description, quantity, unit of measure, unit price, and extended price of services performed.
v. Driver name(s).
vi. Truck number.
vii. Pick-up date(s).
viii. Number of containers.
ix. Container pick-up location; and
x. Name, title, phone number and mailing address of person to be notified in the event of a defective invoice.
c. All Contractor’s service tickets for trash services shall be given as proof of service performed to the COR and the designated Cemetery Staff. The Contractor shall indicate on the ticket their company name, truck number, date, and container pickup locations. Both the Contracting Officer’s Representative or designated Cemetery Staff and the Contractor’s driver shall sign the ticket upon completion of the pickup(s). The Contractor shall leave 1 copy of the ticket with the Contracting Officer’s Representative. Another copy shall be submitted with the Contractor’s monthly invoice.
d. The Contractor shall be accountable for the delivery tickets. If a ticket is voided or lost, the Contractor shall furnish the Contracting Officer with the voided ticket or a written explanation for the lost ticket.
e. The Contracting Officer will work with Contractor, after award, for the most efficient way to bill that will be agreeable to both the Government and to the Contractor. The Government will accept invoices only after services are rendered. Invoices received before the performance of service will be rejected and returned to the Contractor.
f. All quantities are estimated and not binding to the Government. The Contractor will be paid for actual services approved by the Contracting Officer and successfully performed by the Contractor.
11. Verification of Service
a. The Contractor shall forward all monthly invoices to the Contracting Officer.
b. Copies of each invoice shall be forwarded to the COR and Cemetery Director.
a. The COR will be responsible for checking the invoice against contract requirements and verifying service items indicated on the invoice. If service was not delivered or incorrectly invoiced, the COR will document in writing the discrepancies and will forward to the CO. The CO will contact the Contractor and/or return the invoice.
b. If the CO does not contact the Contractor, it will be assumed the invoice is correct and has been approved for payment. The cemetery will retain copies of the approved invoice for their records and for future reference if questions should arise.
c. Invoices will then be paid by way of electronic funds transfer.
12. Containers/Dumpsters
a. Container/Dumpster Type The containers/dumpsters shall be painted in a single uniform color. All trash containers shall be pre-approved by the COR, washable, without holes, leak-proof with tight fitting lids, durable workable wheels and with all operable drain plugs (if applicable to the container).
b. Delivery of Containers/Dumpsters After the Contractor submits a proposed delivery schedule of containers to the Contracting Officer, the Contractor shall contact the Contracting Officer’s Representative (COR) to establish the container delivery schedule. If the COR is not available to be onsite for the delivery, the COR can designate the Cemetery Staff to work with the contractor on the establishment of delivery schedule. The exact location of the placement and the approval of all container styles and types prior to placement of container(s) should be provided to the Contractor by the COR. The Contractor shall notify the COR, or the designated inspector, of any problems associated with the delivery of containers/dumpsters to resolve any logistical problems or misinformation.
c. Contractor’s Responsibility for Containers
1. The Contractor shall be responsible for the delivery, maintenance, and removal of containers/dumpsters and equipment, throughout the contract period. All containers shall be kept free from holes, vermin, or foreign matter which might cause personal injury or damage to clothing. The containers must not emit unpleasant odors, as identified by the COR or Cemetery representative. Unpleasant odors shall be immediately corrected by the Contractor at the Contractor’s expense. The Contractor must have approval in writing from the COR prior to any chemical or biological agent application or use on government land/facilities prior to application. Contractor shall provide in advance to the COR an SDS sheet for any such agent prior to approved use. Failure by the Contractor to take action to correct a container(s) defective condition will be grounds for finding the Contractor in default and could cause the termination of this contract.
2. Containers/dumpsters shall always be kept in proper repair, cleaned, and sanitized in accordance with sanitation codes (Federal or County). Container’s exterior painted surfaces, lettering and decals shall be maintained in good condition without fading or missing components or information. Containers shall be generally free of graffiti, any graffiti containing profanity or offensive material will not be acceptable. Wastewater shall be emptied into the Contractor’s truck. All containers serviced by Contractor, under the terms of this contract, shall be pressure washed with a disinfecting Green Product twice a month during the period of April, May, June, July, August, and September and once a month during the period of October, November, December, January, February, and March. The inside should be sprayed with an EPA and COR approved deodorizer after emptying. The Contractor shall submit in writing to CO the method and product proposed for deodorizing containers for approval. All containers shall be steam cleaned on a quarterly basis. The Contractor shall submit to CO the method and any product proposed for the pressure washing and steam cleaning of the containers. The Contractor shall furnish to the CO, for approval, a schedule of deodorizing and steam cleaning containers, with the submittal of intended deodorizer and intended method of use within 30 days after contract award.
3. Containers/dumpsters shall be both picked up and returned/replaced empty on the same day. Lids shall be placed tightly on all containers that are equipped with lids, after emptying. Also, all containers shall be returned substantially on the landing pad after emptying (for those areas with landing pads).
4. The Contractor shall provide substitute containers/dumpsters within 24 hours of notification of defective container/dumpster, including weekends and holidays, for areas that the CO determines to be critical. The Contractor shall provide a substitute container within 72 hours for areas determined to be non-critical by the CO.
5. All containers/dumpsters shall be approved by the COR before use.
6. The Government will not be held responsible for damage to the Contractor's equipment. All Contractor equipment shall be properly maintained by the Contractor to minimize mechanical problems and breakdowns. All vehicles shall have required standard safety equipment, spill kits and current valid state inspection, DOT and/or other endorsements/requirements. The contractor will be responsible for the immediate clean-up, proper disposal and reporting of all hazard waste spills within the Cemetery. All spills shall be reported to the COR and the Cemetery Director immediately for action and documentation. Failure to do so may result in criminal or civil action and grounds for finding the Contractor in default and could cause the termination of this contract.
7. Contractor shall remove all containers belonging to the Contractor from the site upon expiration of this contract.
13. Facility Rate Increases for Materials
a. After award, but before performance, the Contractor shall submit to the Contracting Officer unit price that correlates exclusively to the facilities rate for each unit price given for solid waste materials removal stated on this contract schedule. Also, the Contractor shall submit to the Contracting Officer written evidence of the current rates for all the facilities to be used with the performance of this contract.
b. If a significant increase in the rate dominated by the disposal facility rises and there are no less expensive substitute facilities available, the Contractor shall submit to the Contracting Officer written evidence of the facility’s new rate with a request for a price adjustment in the form of a claim in accordance with FAR 52.233-1, Disputes Clause. The CO will render a determination for the Government based on the claim. If the decision is made to agree with the Contractor, each of the Contractor’s unit prices will be evaluated using the Contractor’s own percentage of each unit price for solid waste materials and the difference with the new rate minus the old rate. The unit price will increase only in the difference in the change times the Contractor’s own percentage rate.
14. Inspection of Services – Fixed Price.
a. Definitions- “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
b. The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
c. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
d. If the Government performs inspections or tests on the premises of the Contractor or subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, without additional charge, all reasonable facilities and assistance for the safe and convenient performance of these duties.
e. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements at no increase in contract amount. When the defects in services cannot be corrected by performing the work again, the Government may (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
f. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may (1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract for default.
g. The COR will inspect the Contractor’s vehicles, all containers, and surrounding areas for the quality of service performed.
15. General Conditions
a. Negotiating Season Pick-Up/Pull Dates.
a. Where the Cemetery’s ability to provide a safe and healthy area will not be impaired, the specific days of the week that the Cemetery has specified for service may not be negotiated after award.
b. Maintaining the Container/Dumpster Sites.
a. The Contractor shall leave the service loading area in a clean and orderly condition. Contractor shall pick up debris/trash that is in immediate area (10 feet) of receptacle after each pickup. Lids shall be left in the closed position on all containers/dumpsters, where applicable, after being emptied by the contractor.
c. Receive Telephone Notification.
a. The Contractor shall receive telephone notification from the COR or designated Cemetery Staff for unscheduled pickup. Upon notification, the Contractor shall make all arrangements with the COR and the Cemetery Staff for pickup. The Contractor shall have 24 hours from the time of telephone notifications to provide the requested container/dumpster pull.
d. In Case of Damage.
a. Contractor shall be responsible for all damage to persons or property that occurs because of Contractor’s fault or negligence. The Contractor shall take proper safety and health precautions to protect the worksites, workers, the public and property of the Government and others. Any incidents/accidents involving the operation of the contractor’s vehicles or equipment shall be immediately reported to the COR and Cemetery Staff. Failure to do so may result in criminal or civil action and grounds for finding the Contractor in default and could cause the termination of this contract.
b. Contractor shall be responsible for the repair or replacement of any portion of loading docks, building structure, or landscape features, damaged by the Contractor in the performance of this contract. All substantial damage to docks and/or buildings may require NHPA compliance, documentation, and repair by historic methods. Damaged areas or materials shall be restored, repaired, or replaced to the original condition, and to the satisfaction of the Contracting Officer, at no expense to the Government. The Government reserves the right to perform work deemed of historical value, itself for which the contractor will be billed.
e. Access to Government Facilities.
a. During the life of the contract, the rights of ingress and egress to and from Government facilities for the Contractor will be made available between the hours of 7:30 a.m. and 3:30 p.m. in all areas The Government reserves the right to require Contractor’s employees to sign in upon ingress and sign out upon egress to and from Government facilities. For security purposes, keys to government facilities will not be issued to the contractor.
f. Contents
a. The trash generated is usually found at cemetery grounds, administrative offices, maintenance areas and in households.
g. Failure by the Contractor to remove the waste within the time specified or to not comply with all other terms of the contract may result in the Contractor’s default in performance of this contract.
End of Scope