Statement of Work for Pelican Hook (REV A) (002) N00244-26-Q-0068.pdf

PDF 126 KB Posted

Attached to
Pelican Hook Assembly for Towing Operations for USS Curtis Wilbur (DDG-54)
Solicitation number
N00244-26-Q-0068
Issued by

About this file

This is a Statement of Work (SOW) for the procurement of a Pelican Hook Assembly for USS Curtis Wilbur (DDG-54). The vendor is required to provide one Pelican Hook measuring 3-1/2" with associated hardware (pieces 8-15 per NAVSEA Drawing 804-4759441 REV A). The Pelican Hook must comply with specifications outlined in Table #4 for Hawser Rope Size 11 and 12, and fabrication shall follow DET 18-C General Notes (7) and (12), and Note 6 of the referenced drawing. The finish for the Pelican Hook and all associated hardware must be TT-V-51. The procurement is critical for the ship's upcoming MOB-S inspection.

The vendor is responsible for delivery to USS Curtis Wilbur (DDG-54), ATTN: BMC Lomax, 3581 Cummings Road, Bldg. 3581, San Diego, CA 92136-3581. The required delivery date is no later than 01 October 2026. The primary point of contact is BMC Lomax, Gregory, with the Ship's Supply Officer serving as the alternate contact. The SOW also references NAVSEA Drawing 804-860000 REV G (Chain Stoppers for ¾ to 4-3/4 Anchor Chain Assembly and Details) as a supporting specification document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USS Curtis Wilbur (DDG-54) Statement of Work

Title: Procurement of Pelican Hook Assembly for Towing Operations

1. Scope:

This statement is for the procurement of Pelican Hook Assembly to replace missing

Pelican Hook with a towing assembly. The replacement of the Pelican Hook Assembly is critical for the ships’ upcoming MOB-S inspection.

2. References:

a. NAVSEA Drawing 804-4759441 REV A (Emergency Towing Gear Assembly)

b. NAVSEA Drawing 804-860000 REV G (Chain Stoppers for ¾ to 4-3/4 Anchor Chain

Assembly and Details)

3. Requirements:

3.1 The vendor shall provide (1) each Pelican Hook with associated hardware, which includes pieces 8-15 of reference (a). The Pelican Hook shall be 3-1/2” and IAW

Table # 4 for Hawser Rope Size 11, 12 of reference (a). Fabrication shall be IAW

DET 18-C, General Note (7) and (12), and Note 6 of reference (a). The finish of the

Pelican Hook and associated hardware shall have a finish of TT-V-51.

3.2 The vendor shall be responsible for delivering the ordered material to the ship or ship the material to the following address:

Ship’s Address:

M/F: USS Curtis Wilbur (DDG-54)

ATTN: BMC Lomax

3581 Cummings Road, Bldg. 3581, San Diego, CA 92136-3581

4. Notes:

4.1 The required delivery date (RDD) shall be NLT. 01 OCT 2026.

4.2 Ship’s Point of Contact: BMC Lomax, Gregory

Primary

Title:

Name:

Email:

Phone:

Alternate:

Ship’s Supply Officer

Email:

Phone:

File details come from the government source that posted it. Updated .