Statement of Work for MCAAP B190E Monorail System DRAFT FOR RFI.pdf
PDF 6 MB Posted
- Solicitation number
- W519TC25RMONORFI
About this file
This document is a Purchase Description for a B190 East Monorail System for Inert Preparation at the McAlester Army Ammunition Plant (MCAAP). The project involves designing, fabricating, and installing a new overhead monorail system with specific technical requirements, including eight independent powered sections to convey loaded trolleys through various processing stations such as height-shifting interconnecting sections, an empty hanger transfer section, a grit blaster, drop station entry and exit, heating/curing tunnel, and a heating tunnel for melt-out operations.
Key technical specifications include a manual (free) type monorail with some powered sections, a minimum trolley capacity of 2,000 pounds, a minimum of 60 trolleys, and a clearance of 11'6" from the facility floor. The system must integrate with the existing west side monorail, have pneumatically or electrically actuated track path switches, and include five spinner mechanisms for rotating hangers in various processing stations. The installation is scheduled between April 2028 and March 2029, with multiple design review stages at 30%, 60%, and 90% completion. The contractor must provide comprehensive documentation, including operational and maintenance manuals, and a one-year warranty against defective materials and workmanship.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Monorail Drawings Only RFI Purpose.pdf | ||
| MCAAP Monorail RFI.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04 MARCH 2025
P a g e 1 | 14
Purchase Description for
B190 East Monorail System for Inert preparation
1. General Project Scope:
1.1. Scope:
This purchase description establishes design criteria, performance, and acceptance criteria for the overhead monorail system for inert preparation of bomb bodies.
1.2. Classification:
The equipment and services supplied under this purchase description shall be performed by a contractor regularly engaged in the design and integration of material handling equipment and conveyance systems. The contractor shall have a minimum of five (5) years of experience providing such equipment and services to industry other than for its own use. Unless otherwise specified in the contract, or purchase order, the contractor will be required to provide a product that meets all drawing details and requirements.
2. Applicable Documents:
2.1. Standards and Regulations:
The following documents form a part of this purchase description to the extent specified herein. Unless otherwise specified, the issues currently in effect on the date of the solicitation shall be applied.
i. OSHA 29 1910 CFR – Occupational Health and Safety Administration standards and regulations.
P a g e 2 | 14
ii. Department of the Army Pamphlet (DA Pam) 385-64 Ammunition and
Explosives Safety Standards.
iii. National Fire Protection Association (NFPA) 70 National Electrical Code (NEC).
iv. NEMA – National Electrical Manufacturers Association Standards.
v. ISO 9001:2000 – Quality Management System.
vi. TB 43-0142 – Safety Inspection and Testing of Lifting Devices
2.2. Additional Documents:
The following documents shall be in effect on the date of invitation for bids or requests for proposals and form a part of this purchase description.
i. 5166 - Monorail Concept Flow for B190 East Inert Preparation Operations
ii. D3035 - Hanger Assembly for 2,000lb Bombs
iii. D4486 - Bomb Rail Cart Assembly
iv. B2695 - Bomb Cart General Assembly
v. B2696 - Bomb Cart General Assembly & MK82 Attachments
vi. B2697 - Bomb Cart General Assembly & MK83 Attachments
vii. B2698 - Bomb Cart General Assembly & MK84 Attachments
viii. B2699 - Bomb Cart General Assembly & Penetrator 2000lb Attachments
3. Requirements:
3.1. Design:
3.1.1. Prior to final design the contractor shall verify and confirm building column locations, all integral facility features, critical dimensions, and equipment locations with government personnel.
3.1.2. System shall meet all applicable OSHA standards and regulations.
3.1.3. Elimination of pinch points is to be considered during design of the monorail system. Guards and plaques will be added where needed.
P a g e 3 | 14
3.1.4. Only open frame members (S-beam, C-channel, L-angle, etc.) shall be used in the construction of the framework. Tubular members shall not be used. All exposed materials shall be coated/painted or made of non-ferrous materials to prevent corrosion.
3.1.5. Ease of maintenance shall be a design consideration for all portions of the monorail system.
3.1.6. The design should utilize commercial-off-the-shelf items whenever possible to facilitate repair and replacement of worn and/or damaged parts.
3.1.7. Monorail shall be primarily of the manual (free) type with some short sections which are powered.
3.1.8. Monorail shall follow the path as shown in drawing 5166 – Monorail Concept
Flow for B190 East Inert Preparation Operations. Any changes or variations must be approved by McAAP engineering and management.
3.1.9. Monorail shall have a clearance from the facility floor to the bottom of the monorail trolley of eleven feet and six inches (11’ 6”).
3.1.10. Overall height of the monorail system shall not exceed fifteen feet (15’) except over the cart loading area.
3.1.11. Monorail must be made to fully integrate with existing monorail system on the west side of the specified facility as shown on 5166. The conveyors and trolleys must function seamlessly, run in either direction throughout the system, and be fully versatile to run on either track without component changeout. (Further referenced in 3.1.22.2)
3.1.12. Modifications to the existing monorail must also be made to add a rail connection between the east rail heading north to the hanger holding loop as indicated on the process flow drawing, 5166.
3.1.13. The addition of four trolley/hanger holding rails must be included as stated and shown on the included process flow drawing, 5166.
3.1.14. Items moved along monorail shall range from a length of ninety-nine inches (99”) with a diameter of eighteen inches (18”) to a length of forty-five inches (45”) with a diameter of nine inches (9”).
P a g e 4 | 14
3.1.15. Monorail trollies shall have a minimum capacity of two thousand (2,000) pounds. The distance from center line to center line between trollies when placed directly next to each other on the rail shall not exceed twenty four (24) inches.
3.1.16. A minimum of sixty (60) trollies will be provided.
3.1.17. Overall minimum load capacity for the monorail shall be such that any section will be able fully capable of supporting fully loaded trollies placed directly next to one another across the section. This shall hold true for the entire monorail except for those sections designated for empty trolley return and storage and those sections which are powered.
3.1.18. Every effort shall be employed to minimize the number of columns required to support the monorail as floor space will need to be clear for production operations and forklift traffic.
3.1.19. All overhead support structures (gussets, etc.) for the monorail shall be at a minimum height of nine feet (9’) to provide clearance for personnel and forklift traffic.
3.1.20. Monorail track path switches shall be pneumatically or electrically actuated and shall have individual control boxes for activating the switch located near the switches for operational use. The monorail shall have safety stops to prevent trollies from falling from monorail while switch is in motion.
3.1.21. Column design must not require new concrete piers or concrete rework to support the new monorail system.
3.1.22. Powered Sections
3.1.22.1. Monorail shall have eight (8) independent powered sections. The powered sections convey a loaded trolley through two height-shifting interconnecting sections with the existing monorail system, one empty hanger transfer section, a grit blaster in one section, two for the entry and exit out of the drop station, a heating/curing tunnel, and a heating tunnel used for melt-out operations. Conveyance speed shall be variable and controlled electronically by a variable frequency drive or similar electronic method.
P a g e 5 | 14
3.1.22.2. The powered sections for the two height-shifting interconnecting sections are approximately 11.5’ liner feet for the North section and 35.5’ for the South section. The elevation change from one floor to the other is approximately 19”. Final design and integration to be determined during the design phase after the award and must be approved by McAAP OM, AO, and Safety departments. Full transference from the old to new monorail and back is essential to gain the redundant capabilities specified in this project.
3.1.22.3. The powered empty hanger transport section will be approximately
65.5’ long. These sections will not need to meet the high load capacities as previously stated, since only empty hangers will travel on this section.
3.1.22.4. Powered monorail section for the grit blaster shall be a minimum of eighteen feet (18’) long. It shall have spinner mechanism located at the center of the monorail section and another spinner located approximately fifty-six inches (56”) past center (verify during site visit). This section should have a means of stopping and/or dropping from the drive when a loaded trolley is in the above mentioned positions and picking back-up when the grit blaster has finished its cycle.
3.1.22.5. The powered sections for the entry and exit sections of the monorail leading into the drop station are approximately 25.0’ liner feet for the
Entry section and 28.5’ for the Exit section. These areas are not easily accessible to personnel, so limited user interface must be utilized to ensure easy flow of loaded bomb hangers in and empty bomb hangers out.
3.1.22.6. The powered sections for the heat tunnel and tar melt-out heat tunnel shall be a minimum of twenty-one (21’) long each.
3.1.23.Spinner Mechanism
3.1.23.1. A total of five (5) mechanisms shall be provided that will spin the hanger suspended from the monorail trolley. Two of these shall be located in the grit blaster powered section of the monorail mentioned in
P a g e 6 | 14 section 3.1.22.4. One each of the others shall be located in the paint booth, thermal coat booth, and thermal arc booth.
3.1.23.2. The mechanism shall be designed such that it functions to spin the hanger depicted in drawing D3035 – Hanger Assembly for 2000Lbs.
Bombs.
3.1.23.3. At the paint booths and the thermal arc booth the spinner shall be accompanied by actuator “kick-out” device to kick or move the carrier away from the spinner and out of the booth. This actuator should be able to move the carrier four feet (4’) for the paint booths and six feet (6’) for the thermal coat and thermal arc booths.
3.1.23.4. Mechanism shall be either electrically or pneumatically powered. The operational speed of mechanism shall be adjustable.
3.1.23.5. If required, the government can provide an example drawing of a spinner used in similar operations.
3.1.24. Cart Loading Station
3.1.24.1. The monorail system shall have a station for unloading the monorail carriers into carts. The station shall be capable of raising and lowering the fully loaded carriers as required to load the carts. The carts will be in of various configurations as shown in the cart drawings referenced in the additional documents section of this document.
3.1.24.2. Station should be capable of raising and lowering two (2) carriers simultaneously. See profile notes 1 and 2 on supplied drawing 5166 for the estimated required drop height.
3.1.24.3. Reference table below for bomb assets being loaded:
Bomb Body Length (inches) Dia. (inches) Cart Loading Location
BLU-109 95 14.5 Top
BLU-137B 98 14.5 Top
Mark 84 99 18.0 Top
Mark 83 75 14.0 Top
Mark 82 67 10.8 Top
Mark 81 45 9.0 Top
P a g e 7 | 14
3.1.24.4. Station should be equipped with safety stops to prevent a trolley from inadvertently coming off the track.
3.1.24.5. Station should be equipped with some form of secondary stopping mechanism in the event of a failure of the primary lifting/lowering mechanism.
3.2. Electrical
3.2.1. The system will be designed to use 480 volt, 3 phase, 60 hertz alternating current power.
3.2.2. Controls
3.2.2.1. A control station for each powered monorail section, spinner mechanism, and kick-out device shall be located nearby for convenient operation.
3.2.2.2. The track switch controls shall be located so that they can be easily accessed by an operator pushing the trollies.
3.2.2.3. The control station for the loading station shall be mounted to and accessed from a work platform provided by the government.
3.2.2.4. All control components near or above the paint, stripping, and thermal coating booths are to be rated for hazardous environments.
3.3. INSTALLATION, CERTIFICATION, AND TRAINING
3.3.1. Installation
The monorail shall be installed by the contractor in the designated building and extension between the dates of April 2028 and March 2029. The government will provide supply power to the main panel location, but the contractor shall be responsible for all electrical installation of the monorail.
This will include tie-in’s with the existing monorail as required by the design to make a fully integrated system.
P a g e 8 | 14
Contractor shall verify building column locations, elevation changes, dimensions, and any other design altering facility characteristics before installation. All estimated dimensions given by this document and on the supplemental drawing are for reference only.
3.3.2. Certification
In the event any component requires certification upon final installation, then this will be considered part of the installation of the system. Any certification shall be the responsibility of the contractor. As such final acceptance will not be made until certification is complete. It is the sole purview of the MCAAP
Engineering Office personnel to waive the necessity of these certifications.
3.3.3.Training
The contractor shall provide a factory representative to train all necessary personnel in operation and maintenance.
4. Prior to Award:
4.1. PRE-SUBMISSION SITE VISIT: A site visited is recommended for all bidders to fully assess the scope of the project, take applicable measurements and notes, and question McAAP personnel concerning pertinent topics. McAAP will arrange a site visit opportunity in a reasonable time frame, so that all interested parties are shown the facility and current set-up. We can then go over what we require of the new monorail system, identify all essential equipment and vital operational features, and finalize the list of deliverables. These actions will be vital in bidders successfully and accurately providing bids that will satisfy the scope of this procurement action.
4.2. DETAILED DESCRIPTION REQUIRED PRIOR TO AWARD: The MCAAP
Operations Management, Planning Division, Engineering Branch will validate
P a g e 9 | 14 and verify/approve the contractor’s listed equipment concept before award is granted. In order to meet this review requirement, the offeror shall submit with their proposal a detailed technical description of each item. The offeror’s description submittal shall account for each one of the required product features located in this qualifying statement. The description shall also clearly portray/describe how each item will function. Conceptual drawings that are not labeled “as built” drawings are required for submittal with the detailed description. Drawing must provide overall height, width, and length dimensions.
It should depict the locations of key components. If there is a picture of the equipment or portions of the equipment, such as from a brochure, then that picture(s) should be included with the data. It is advantageous for the contractor to supply as much data as possible as the government will use this to approve the proposed equipment, as related to this purchase description, for production and/or purchase.
5. After Award Reviews:
After an award, the contractor shall provide the government with, at minimum, a
30% progress/status update, a 60% progress/status update, a 90% progress/status update, and a notification when the item is shipped. If there are any unforeseen delays the government contract officer should be notified immediately. It is the sole purview of the MCAAP Engineering personnel to waive the necessity of these progress/status updates. The progress/status updates shall take the form of design reviews as necessitated by the procurement type and determined by government personnel. The design resign reviews shall have the minimum listed requirements below:
5.1 30% Concept Design and Data Review:
A 30% conceptual design review will be held between the contractor and
MCAAP personnel within four (4) months of the award. Contractor shall supply preliminary drawings related to the construction and final assembly as specified
P a g e 10 | 14 by this purchase description to the MCAAP Operations Management, Planning
Division, Engineering Branch for approval. Any specific facility, mechanical, or controls requirements that McAAP will need to fulfill must be openly conveyed and accepted at this point. These drawings should include installation and/or operational envelope dimensions, utility requirements, and connection locations along with any other pertinent data. If there is a picture of the equipment or portions of the equipment, such as from a brochure, then that picture(s) should be included with the data. It is advantageous for the contractor to supply as much data as possible as the government will use this to approve the proposed equipment, as related to this purchase description, for production and/or purchase. This set of drawings/data shall be in electronic format. The preferred format is “.dwg” or “.dxf” for 2-D data and Solid Works (.sldprt, .sldasm) format or
STEP (.stp) format for 3-D data. All drawings/data shall be authorized for reproduction and distribution to end users of the equipment.
5.2 60% Preliminary Design and Review:
A 60% design review will be held between the contractor and MCAAP personnel upon the date agreed upon during the 30% design review. Contractor shall supply in-process drawings related to the construction and final assembly as specified by this qualifying statement to the MCAAP Operations Management
Planning Division for approval. These drawings should include finalized installation and/or operational envelope dimensions, utility requirements, and connection locations along with any other pertinent data. All equipment the government must procure to support the item in this procurement that would constitute a “long lead time” should be identified at this time. Any changes to the design from the previous review should be incorporated. If there is a picture of the equipment or portions of the equipment, such as from a brochure, then that picture(s) should be included with the data. It is advantageous for the contractor to supply as much data as possible as the government will use this to approve the proposed equipment, as related to this purchase description, for production and/or purchase. This set of drawings/data shall be in electronic format. The
P a g e 11 | 14 preferred format is Solid Works (.sldprt, .sldasm) format or STEP (.stp) format 3-
D data and “.dwg” or “.dxf” for 2-D data if 3-D data is not available. All drawings/data shall be authorized for reproduction and distribution to end users of the equipment.
5.3 90% Detailed Design and Review:
A 90% design review will be held between the contractor and MCAAP personnel upon the date agreed upon during the 60% design review. Contractor shall supply in-process drawings related to the construction and final assembly as specified by this qualifying statement to the MCAAP Operations Management
Planning Division for approval. A 90% design package should only require minimal changes at this point. Examples of this would be cleaning up of drawings, incorporating redlines, and finalizing bill of materials. No changes to the scope should be made at this time. This set of drawings/data shall be in electronic format. The preferred format is Solid Works (.sldprt, .sldasm) format or
STEP (.stp) format 3-D data and “.dwg” or “.dxf” for 2-D data if 3-D data is not available. All drawings/data shall be authorized for reproduction and distribution to end users of the equipment.
6. Finalized Drawings and Data:
The contractor shall provide two (2) complete sets of as-built reproducible drawings/data. The drawings/data shall include, at minimum, the requirements of the paragraph above. One (1) complete hard copy set of finalized drawings/data shall be provided with the equipment. The other will be in electronic format. The format must be capable of being read as “.dwg” or “.dxf” for 2-D data and Solid
Works (.sldprt, .sldasm) format or STEP (.stp) format for 3-D data. All drawings/data shall be authorized for reproduction and distribution to end users of the equipment. The drawings and data should hold to all pertinent industrial and government standards including, but not limited to, the following: ASME Y14.5-
2018, ASME Y14.38-2019, and ASME Y14.1-2020 (or the newest revision to these standards). A copy of all software programs is included in this requirement, and
P a g e 12 | 14 the format and transmission will need to be coordinated with McAAP OMP-AIT personnel.
7. Operational, Maintenance, and Parts Manuals:
The contractor shall furnish under this purchase description two (2) sets of operational, maintenance, and parts manuals as necessitated by the equipment.
The manuals shall be specific (not canned statements about the system in general) to the system supplied. There shall be a brief description concerning the purpose of the specific equipment supplied and the rated operating capacities.
The manuals shall contain a complete parts list to include (at minimum) all information necessary (manufacturer’s name, address, phone number, P/N, S/N, size, model number, type, etc.) to re-order the part if necessary. The manuals shall include all preventive maintenance procedures/schedules specific to the equipment supplied. These manuals shall be applicable to the equipment provided only and shall include all safety precautions/warnings associated with the operation. All manuals shall be authorized for reproduction and distribution to end users of the equipment. One (1) set of hard copy versions of the manuals shall be provided with the equipment. One (1) set of the manuals shall be electronic in form (on CD) and must be capable of being read in either a “.pdf” or a “.doc” format.
8. Delivery:
Delivery is to be coordinated at the earliest possible convenience with the
MCAAP Operations Management, Planning Division to facilitate an orderly receipt of the system. MCAAP can store the system if the contractor chooses to deliver before the April 2028 – March 2029 installation window. The final system will be offloaded at the final MCAAP destination by the contractor. If base employee equipment or personnel are required, this must be fully stated and approved prior to award acceptance.
P a g e 13 | 14
9. Acceptance Review:
Upon shipment of components to MCAAP, an acceptance review by government personnel will be conducted. If the system or its components are found to be unacceptable, those components shall be shipped back to the contractor/manufacturer for repair and/or replacement. It is the sole purview of the MCAAP Engineering personnel to waive the necessity of these reviews.
10. Spare Parts Inventory:
A full and comprehensive spart parts list and inventory shall be provided to
McAAP upon delivery. Along with this, a full maintenance and upkeep plan is to be included to assist in documenting and performing preventive maintenance actions. If changes are noted during testing and prove-out, the contractor will be required to provide updated maintenance plans, spare parts lists, and the spare parts themselves to compensate for the change. The spare parts inventory should cover items with quantities sufficient to support demil operations for one year after system prove out.
11. Quality Assurance Provisions:
12.1 Responsibility for Inspection:
Unless otherwise specified in the contract or purchase description the contractor is responsible for the performance of all inspection requirements specified herein. Except as otherwise specified the contractor may use their own facilities or any commercial laboratory acceptable to the government. The government reserves the right to witness or separately perform any of the inspections set forth in the purchase description where such inspections are deemed necessary to assure supplies and services conform to prescribed
P a g e 14 | 14 requirements. The contractor shall notify the contracting officer at least 15 working days prior to shipment so a government representative(s) can make arrangements to be present to perform an acceptance inspection if necessary. Final acceptance of the contract shall be the responsibility of the government contracting officer.
12.2 Quality Management:
Contractor must show proof of internal quality management system in accordance with MIL-I-45208A, ISO 9001: 2000 or equivalent quality assurance programs. The contractor shall certify and maintain substantiating evidence that the product meets the provided drawing specification, and quality assurance requirements. This includes manufacturing and welding requirements. The manufacturer may use their own inspection facility or any commercial facility agreeable to the government. The government reserves the right to witness the inspections of all components of this system for conformity of specifications.
12. Warranty:
Contractor shall provide a warranty against defective material, parts, and workmanship for a period no less than 1 year from the final commissioning date.
13. Intended Use Statement:
When government drawings, specifications, or other data are used for any purpose other than in connection with related Government Procurement
Operations, the Unites States Government thereby incurs no responsibility or any obligation whatsoever. The fact that the government may have furnished, formulated, or in any way, supplied the said drawings, specifications, or other data, is not to be regarded by implication, or otherwise in any manner licensing the holder or any other person, or corporation, or conveying any rights or permission to manufacture, use, or sell any patented invention that may be in any way related thereto.
DROP STATION
THERMAL COAT
& PAINT BOOTH
PAINT &
STRIPPING
TAR SYSTEM
A-LINE WEST
INTERFACE
THERMAL ARC
GRIT BLASTER
TILT STATION
SPUR RAIL
OPTION
CURRENT TAR
SYSTEM
EQUIPMENT
HEAT TUNNEL
P
P
P
P
P
P
P P P
P
S/P
S/P
S/P
S/P
P
P
-POWERED SECTION
-SPINNER AND PUSH-OUT
P
P
E->W
OPT1
E->W OPT2
BOMB
REMOVAL
STATION
OPTION
RAIL DOOR
P P
P
P
PULL TEST
HOLDING SPUR
THERMAL ARC
RETURN LEG
W->E
SECTION
W->E
OPT2*
*OPTION REQUIRES SUBSTANTIAL ELECTRICAL REWORK IN THE WEST BAY.
OPTION 1:
PAINT/HOLD
LOOP
EAST TO WEST MONORAIL CONNECTION ALTERNATIVES:
PREFERRED: OPTION 1
SECONDARY: OPTION 2
PAINT BOOTH ALTERNATIVES:
PREFERENCE: BOTH OPTION 1 AND OPTION 2
SECONDARY: OPTION 1 ONLY
ADDITIONAL PREFERRED OPTIONS:
1) HANGER HOLDING RAILS FOR HANGER STORAGE
AND MORE EFFICIENT LINE PREPARATION.
2) BOMB REMOVAL STATION FOR SAFER AND MORE
EFFICIENT ASSET REMOVAL FROM THE LINE.
3) TAR MELT OUT LINE FOR ASPHALT REJECTS.
TAR MELT OUT OPTION
SANDING
BOOTH
PROFILE 2
PROFILE 1
P P
N
RAIL DOOR
WEST TO EAST
CONTINGENCY
PATH HANGER
RETURN RAIL
HANGER HOLDING
RAILS OPTION
UPGRADE THE EXISTING
HANGER HOLDING LOOP
TO MATCH THE LOAD
CAPACITY OF THE PRIMARY
SECTION OF MONORAIL.
B190 EAST
MONORAIL
PROCESS FLOW FOR
MODERNIZATION
NOTES:
1) THIS PROCESS FLOW IS NOT FINALIZED. FURTHER INPUT AND CHANGES WILL OCCUR.
2) DIFFERENT PATH OPTIONS ARE SHOWN IN THREE LOCATIONS AS DENOTED BY THE
DASHED LINES (TWO AT THE INTERFACES BETWEEN A-LINE EAST AND A-LINE WEST, ONE
IN THE PAINT CYCLE), AND THESE WILL BE RESOLVED BEFORE THE MONORAIL GOES TO
CONTRACT.
3) THE TAR STATION AS SHOWN HAS THE NEW STATIONS AND WALKING BEAM LIKE B175
AND B190 WEST. THIS OPTION HAS NOT BE FUNDED OR FULLY AGREED UPON AT THIS
STAGE. WE ARE IN THE PROCESS OF WORKING IT UP THE CHAIN FOR APPROVAL.
'E->W' DENOTES THE EAST TO WEST "DOWNHILL" POWERED INTERFACE SECTION.
'W->E' DENOTES THE WEST TO EAST "UPHILL" POWERED INTERFACE SECTION.
Legend:
COPY
DATE: 13 NOV 24
LOG# 6023
CONCEPT ONLY
NOT APPROVED
PROFILE 1 : BOMB CART TRACK ELEVATION CHANGE
~19"
~54"
~36"
MAIN FLOOR WORK PLATFORM
CART LANE BASE
BLDG. 190 EAST FLOOR LEVEL
BLDG. 190 WEST
FLOOR LEVEL
PROFILE 2 : EAST-WEST BUILDING ELEVATION CHANGE
APPROVAL SIGNATURES FILED
ELECTRONICALLY ON FORM MF
750-45
NOCRITICAL SAFETY ITEM:
DRAWING NO.
THIRD ANGLE PROJECTION
D
SIZE
NONE
REV.
MORGAN SENNETT
WEIGHT:
LBS 12/11/2024
MORGAN SENNETT
BLDG:
MCALESTER, OKLAHOMA
DEPARTMENT OF THE ARMY
MCALESTER ARMY AMMUNITION PLANT
DRAWN
DESIGNED
MCAAP APPROVAL:
SCALE: SHEET 1 OF 1
UNLESS OTHERWISE SPECIFIED:
DIMENSIONS ARE IN INCHES
TOLERANCES:
FRAC 1/64 ANGLE 2°
2 PL .01 3PL .005
DIMENSIONS IN () ARE REFERENCE ONLY.
REMOVE BURRS AND SHARP EDGES DIE STAMP/ETCH
DRAWING NUMBER ON FINISHED PRODUCT.
USER SHALL ENSURE THAT THE DRAWING IS THE LATEST
REVISION AND THAT COPIES SHALL BE DESTROYED AFTER
INITIAL USE OR WHEN SUPERSEDED .
MATERIAL:
DATE:
A A
B B
C C
D D
.05
5.50
2X .656 THRU
.755 THRU
4.25 2.13
R1.813
4.25
6.25
3.63
ITEM 6
5/8-11 UNC
TYP
7.63
5.38
A
A
13 2X
16 2X
SECTION A-A
.19
AT FINAL
ASSEMBLY
1.75
3.500
8.25
4.500
1.50 3.25
1.50
.624+ .000 .002
.748+ .000 .002
R.015
MIN. TOOL
RADIUS
KEY CHANNEL
3/16 WIDE
3/32 DEPTH
BEVEL EDGES
3/4-10 UNC
5/8-18 UNF
2.50
2.3 2.2 .13
.13
5.50
3.00
4.25 2.13
2X .656 THRU
2.1
.50 .75
1.377+ .000 .005
2.587
.688 THRU
1.813
.75 .63
.13 2.75
.21 1.11
1/4-28 UNF 1.00
.98
E
E
5.50
4.25 2.13
2X .656 THRU ALL
.75 THRU ALL
.63
1.00
1.11
2.484 2.587
.200
.600
R.015
R.015 F
SECTION E-E
.781.750
1.6245+ .0010 .0000
1.188
R.015
R.015
DETAIL F
SCALE 1 : 1
NOTES:
DRILL ITEMS 1 & 6 AND PIN CASTLE NUTS (ITEMS 15 & 16) AT FINAL ASSEMBLY.1.
LOAD TEST IAW TB 43-0142. WLL 2,100 LBS.2.
ITEMS 10 IS TO BE PRESS FIT INTO ITEM 5.3.
GREASE THRUST BEARING SO THAT THE BEARING CAVITY IS 1/3 TO 1/2 FULL.4.
HANGER ASSEMBLY
ITEM 1
ITEM 2
WELDMENT
ITEM 3 ITEM 4 ITEM 5
D
D
D
D
C
C
C
B
B
B
B
A
A
A
D
D
D
D
D
D
D
D C
D
D
E
E
D
F
F
REV. DESCRIPTION DATE REVISED BY APPROVED
A ADDED TOLERANCE TO ITEM #3, CHANGED DIM ON ITEM #4, CHANGED BEARING ON
ASSEMBLY 8/20/14 N/A JD
B CHANGED TO AS BUILT DIA. 10/21/15 TUCKER JD
C CHANGED THREADED SHAFT COLLARS AND SPROCKET AND GEAR 6/19/19 CALDWELL ANGELI
D REPLACE RADIAL BEARING (NO LONGER AVAILABLE). REPLACE THRUST BEARING. VARIOUS
DESIGN CHANGES TO MACHINED PARTS. CONVERT TO SOLID WORKS DRAWING. 9/12/19 DAY DUGAN
E BOM CHANGES 11/13/19 DAY DUGAN
F MATERIAL AND DESIGN CHANGES TO ITEMS 2 & 6 3/19/20 DAY ANGELI
16 5/8-11 UNC SLOTTED HEX NUT, GRADE 8 N/A PURCHASE 2
15 5/8-18 UNF SLOTTED HEX NUT, GRADE 8 N/A PURCHASE 1
14 MCMASTER PN: 6438K24; THREADED SHAFT COLLAR, 5/8-18 UNF N/A PURCHASE 1
13 5/8-11 UNC (THIN) HEX JAM NUT, GRADE 8 N/A PURCHASE 2
12 STEEL GREASE FITTING, STRAIGHT, 1/4-28 SAE-LT MALE, 35/64 OVERALL LENGTH N/A PURCHASE 1
11 3/16" KEY STOCK 1.50" PURCHASE 1
10 MCMASTER PN: 6384K770; SEALED BALL BEARING, #3028-2RS, 5/8" SHAFT DIA. N/A PURCHASE 1
SKF PN: 51207; (NO SUBSTITUTE) THRUST BALL BEARING, SINGLE DIRECTION,
2.4409 OD, 1.378 ID, .7087 HEIGHT, BASIC DYNAMIC LOAD RATING 7,891 LBF.,
BASIC STATIC LOAD RATING 16,523 LBF.
N/A PURCHASE 1
8 MCMASTER PN: 3274T44; 3/4-10 FORGED OVAL EYE NUT, WLL OF 10,600 LBS. N/A PURCHASE 1
7 MARTIN SPROCKET & GEAR BK62 3/4 - MOTION INDUSTRIES; V-BELT PULLEY - A,
4L, B, 5L BELT, 1 GROOVE, 5.2 PITCH DIA., 5.95 OD, .75 BORE, CAST IRON N/A PURCHASE 1
6 U-BOLT; AMERICAN SENTINEL PART NUMBER: UB358X614X58X358THR N/A 1040 STEEL 1
5 6.00 X 6.00 X 2.00 PLATE N/A 1040 STEEL 1
4 16 GAUGE SHEET 6.00 X 6.00 N/A ALUMINUM 1
3 2.75 DIA. RND. STK. 1.00" 1040 STEEL 1
2 WELDMENT N/A SEE CUT LIST 1
1 .75" DIA. RND. STK. 8.25" 1040 STEEL 1
ITEM
NO. DESCRIPTION LENGTH MATERIAL QTY.
2.3 16 GAUGE SHEET 3.00 X 3.00 6061 ALUMINUM 1
2.2 MCMASTER 9056K41 OR EQUAL: RND. TUBE 1/8" WALL, 3" O.D. 6061 ALUMINUM 1
2.1 6.00 X 6.00 X .25 SHEET 6061 ALUMINUM 1
2 WELDMENT SEE ABOVE 1
ITEM
NO. DESCRIPTION MATERIAL QTY.
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
E
F
E
F
SHEET 1 OF 1
UNLESS OTHERWISE SPECIFIED:
DO NOT
SCALE FROM
DRAWING
WEIGHT:
MCAAP APPROVAL DATE
DIRECTOR DE (FINAL APPROVAL)
DESIGNED
DRAWN
AS SPECIFIED
AS SPECIFIED
FINISH
MATERIAL
DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL 1/64
ANGULAR 2
TWO PLACE DECIMAL .01
THREE PLACE DECIMAL .005
REMOVE BURRS AND SHARP
EDGES
DIE STAMP DRAWING NUMBER
ON FINISHED PRODUCT
APPLICATION
USED ONNEXT ASSY
DEPARTMENT OF THE ARMY
MCALESTER ARMY AMMUNITION PLANT
MCALESTER, OKLAHOMA
DRAWING NO.
BLDG. NO.
AO
ENGRG DEE
CHECKED BYSAFETY
ALL COPIES OF THIS
DRAWING ARE TO
BE DESTROYED
AFTER INITIAL USE,
OR WHEN LATER
REVISIONS ARE
AVAILABLE.
USER SHALL CHECK
TO ENSURE THAT
COPIES OF THIS
DRAWING ARE THE
LATEST REVISION
PRIOR TO USE.
DRAWING USE:
COMPUTER GENERATED DRAWING SOFTWARE VERSION: SOLIDWORKS 2019
CPS
CPS
07/11/02 07/11/02
23 LBS. 175
HANGER
ASSEMBLY 2000
LB BOMBS
D
REASNOR
DLK
DAY
WATSON
F
D3035FORIGINAL
SIGNED
76.13
17.77
MARK 84 CART SETUP
B
A
54.39
MARK 82 CART SETUP
54.21
MARK 81 CART SETUP
1 2
A
1 A
B
ORIG
INAL S
IG
NED
A
NOTES:
APPLICABLE STANDARDS/SPECIFICATION:1.
ASME Y14.5-2009, DIMENSIONING AND TOLERANCING1.
ASME Y14.38-2007, ABBREVIATIONS AND ACRONYMS2.
THE MK 81 AND 82 CONFIGURATIONS ARE LOADED FROM THE TOP. 2
THE MK 84 AND BLU-109 CONFIGURATIONS ARE LOADED FROM THE
SIDE.
B
ITEM NO. DESCRIPTION MFR./SUPPLIER PART NO. PROCUREMENT MK84/QTY. MK81/QTY. MK82/QTY. BLU-
109/QTY.
9 BOMB RACK ASSEMBLY FOR PENETRATORS MCAAP D4487 FABRICATE - - - 1
8 NUT, HEX, STEEL, GRADE 8, 5/8"-11 UN FASTENAL 36414 STK./PURC. 6 1 6 6
7 WASHER, LOCK, SPLIT, REGULAR, STEEL, 5/8" FASTENAL 33630 STK./PURC. 6 1 6 6
6 WASHER, FLAT, SAE, 5/8" NOMINAL FASTENAL 33090 STK./PURC. 6 1 6 6
5 SCREW, CAP, HEX HEAD, GRADE 8, 5/8"-11 X 3.00 FASTENAL 15315 STK./PURC. 6 1 6 6
4 BOMB RACK ASSEMBLY, MK82 MCAAP D4472 STK./PURCH. - - 1 -
3 BOMB RACK ASSEMBLY, MK81 MCAAP D4472 STK./PURCH. - 1 - -
2 B OMB RACK ASSEMBLY FOR 2000 LBS BOMBS MCAAP D4473 STK./PURCH. 1 - - -
1 RAIL TRANSPORT CART (SEE SOURCE CONTROL
DRAWING B3206)
HAMILTON CASTER
AND MFG. COMPANY XT3012 PROCUREMENT 1 1 1 1
REVISIONS
ZONE REV. DESCRIPTION DATE REVISED BY APPROVED
A4, B2, B5, C5 A ADDED BOM DETAILS AND DRAWING NUMBER FOR
CART SOURCE CONTROL. ADDED NOTES. 4/12/2018 D. HOWELL J. DUGAN
A4, C7, D7, 2-
B6
B ADDED BLU-109 CART CONFIGURATION ON SHEET 2.
ADDED MISSING DIMENSIONS. 9/18/2018 D. HOWELL J. DUGAN
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
E
F
E
F
SHEET 1 OF 2
UNLESS OTHERWISE SPECIFIED:
DO NOT
SCALE FROM
DRAWING
WEIGHT:
MCAAP APPROVAL DATE
DIRECTOR DE (FINAL APPROVAL)
DESIGNED
DRAWN
AS SPECIFIED
AS SPECIFIED
FINISH
MATERIAL
DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL 1/64
ANGULAR 2
TWO PLACE DECIMAL .01
THREE PLACE DECIMAL .005
REMOVE BURRS AND SHARP
EDGES
DIE STAMP DRAWING NUMBER
ON FINISHED PRODUCT
APPLICATION
USED ONNEXT ASSY
DEPARTMENT OF THE ARMY
MCALESTER ARMY AMMUNITION PLANT
MCALESTER, OKLAHOMA
DRAWING NO.
BLDG. NO.
AO
ENGRG DEE
CHECKED BYSAFETY
ALL COPIES OF THIS
DRAWING ARE TO
BE DESTROYED
AFTER INITIAL USE,
OR WHEN LATER
REVISIONS ARE
AVAILABLE.
USER SHALL CHECK
TO ENSURE THAT
COPIES OF THIS
DRAWING ARE THE
LATEST REVISION
PRIOR TO USE.
DRAWING USE:
COMPUTER GENERATED DRAWING SOFTWARE VERSION: SOLIDWORKS 2016
D. HOWELL
D. HOWELL
16 JAN 18
16 JAN 18
700 LBS 175/190
D4486B
BOMB RAIL CART
ASSEMBLY
D
S. COX
T. BUCKNER
J. DUGAN
J. HAMMONDS M. ANGELI
B
23.75
BLU-109 PENETRATOR CART CONFIGURATION B2
82.63
124.63
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
E
F
E
F
SHEET 2 OF 2
DO NOT
SCALE FROM
DRAWING
DEPARTMENT OF THE ARMY
MCALESTER ARMY AMMUNITION PLANT
DRAWING NO.
BLDG. NO. D4486BWEIGHT:
D
175/190700 LBS
B
File details come from the government source that posted it. Updated .