Statement of Work_FEMA Region 6 Watch Control Room Consoles and Furniture_9.4.2026.pdf
PDF 267 KB Posted
- Solicitation number
- 70FBR626Q00000036
- Issued by
-
Federal Emergency Management Agency
About this file
Statement of Work Summary
This is a Statement of Work (SOW) for the FEMA Region 6 Watch Control Room Consoles and Furniture refresh project, issued by the Department of Homeland Security (DHS) with Raymond Hixon Jr. as the Contracting Officer's Representative. The project will be performed at the Denton, Texas Federal Regional Center (800 N. Loop 288, Denton, Texas 76209) and is critical to ensure FEMA maintains 100% operational capability to provide situational awareness and coordinate federal disaster response operations across FEMA Region 6 and five states (Arkansas, Oklahoma, New Mexico, Louisiana, and Texas).
The contractor shall provide procurement, full assembly, positioning, and installation of the following new furniture items: up to eight (8) Control Room Console units with motorized sit-stand capability, integrated cable management, task lighting, monitor arm mounts supporting up to four (4) monitors each, and capacity for three (3) computer towers; eight (8) BRISA Standard Next24I2707SKYP 24/7 ergonomic task chairs with adjustable features for extended shifts; one (1) AELITE AIR 24/7 Conference Table (96" x 50.4") in grey with LED lighting and connectivity boxes; and eight (8) Think Chair conference room chairs. All products must be manufactured new, meet ANSI/BIFMA standards, feature Class-A flame-spread fabrics, and be fully assembled and functional prior to Government acceptance. The contractor is responsible for removing and disposing of all existing furniture using commercial disposal practices (not government waste receptacles) and must maintain the site clean and organized throughout performance. Work hours are limited to 8:00 a.m. to 4:00 p.m. Central Time, Monday through Friday, requiring coordination with the Contracting Officer or COR. The contractor must provide a Project Manager as a single point of contact, present on-site during all work, and all contractor personnel must be U.S. citizens (or obtain a compelling waiver) and pass background investigations per FEMA security requirements. Upon completion, the contractor has five (5) business days to correct any deficiencies identified during final inspection, and delays are not excusable unless covered under FAR 52.249-14, as project delays may cause financial loss to the Government and interfere with a subsequent R6 Watch Center AV Upgrade project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
FEMA Region 6 Watch
Control Room Consoles and Furniture
The Department of Homeland Security (DHS)
Raymond Hixon Jr., COR
6 September 2026
1.0 GENERAL
1. 1 Background
The Federal Emergency Management Agency (FEMA) coordinates the Federal Government's role in all presidentially declared Emergencies and Major Disasters, whether natural or human- caused, including acts of terror. To accomplish this mission FEMA maintains 24-hour situational awareness through the FEMA Watch program. The program provides situational awareness that enables leadership at all levels to make informed decisions whether to activate incident support/management personnel and provides continual monitoring of incidents during activations.
Elements that support the FEMA’s Watch capability, from the National Watch Center (NWC) to the Regional
Watch Center (RWC) functions, fulfill unique responsibilities, operate under distinct authorities, and provide specialized capabilities, and are charged with providing for a common mission, maintaining awareness of potential and occurring incidents, conducting analysis to identify potential threats and determine impacts, notifying appropriate stakeholders of incident activity, and disseminating reports during the initial stages of incidents.
This project will take place at Denton, Texas Federal Regional Center (FRC), located with FEMA Region 6.
This refresh focuses on the Regional Watch mission, which serves as the 24-hour ‘Watch capability’ for
FEMA Region 6 and the five states in their Area-Of- Responsibility (AOR) – Arkansas, Oklahoma, New
Mexico, Louisiana, and Texas, as well as the Tribal Nations within those geographic boundaries. The Watch is responsible for maintaining around-the-clock situational awareness; providing timely alerts, notification, and decision-making support; the preparation, coordination and dissemination of day-to-day Watch and initial incident reports; and the operational transition of incidents to activated region response elements.
Updating the Control Room Consoles and Furniture in the Watch is critical to ensure that FEMA possesses a baseline set of capabilities necessary to perform the mission, that requires 100% capability to provide situational awareness and effectively coordinate federal disaster response operations.
1.2 Scope
The scope of this document is to refresh the Control Room Consoles, Office Chairs, and Conference Table which includes procurement of items and associated materials and supplies; installation, and assembly of new items; removal of old furniture from workspaces, and labor services necessary to complete the tasks and requirements defined within this SOW. Specifically, the intent is to upgrade the components in the watch room located on the upper floor of the FRC office building, which is on the Region 6 Federal Regional Center, specifically 800 N. Loop 288, Denton, Texas 76209.
2.0 SPECIFIC REQUIREMENTS/TASKS
The Contractor shall provide all materials and labor to complete the tasks outlined in this SOW.
Furniture, Fixtures and Equipment Requirements
The contractor shall provide all furniture components, hardware, and parts necessary for proper use. Contractor shall be responsible for providing, fully assembling, positioning, and installing of Control Room Consoles, Chairs, and
Conference Room Table. All items shall be fully functional prior to acceptance by the Government.
a. All products shall be manufactured as new. Used, reworked, or refurbished products are not acceptable.
b. No items shall be discontinued at the time of order.
c. All products shall meet or exceed all applicable ANSI / BIFMA performance standards denoted in furniture specifications.
d. All items shall have the ability to be configured with commonly available tools. Any special tools required to assemble the product shall be provided at no cost. The contractor is responsible for full assembly and installation.
e. All fabrics shall have a Class-A flame spread rating.
Control Room Consoles:
a. The contractor shall provide up to eight (8) Control Room Console units.
b. All console units shall have storage for a desktop computer and multiple storage drawers.
c. All console units shall have the capability to hold a minimum of three (3) computer towers, while allowing proper venting and air flow for the computer towers to alleviate heating issues.
d. All console units shall have workstation monitor arm mounts with the capability to support up to four (4) computer monitors, measuring up to 42” in size.
e. All console units should have a solid surface desktop that is either white or light gray in color.
f. All console units have integrated cable management to hide all required power and PC cabling.
g. All console units shall have the ability to raise and lower the entire desk surface, with a motorized feature, for sitting or standing operation. The motorized sit-stand feature shall accommodate the weight of all items on the desk surface, including but not limited to, computer monitors.
h. All console units shall be equipped with task lighting.
i. All console units shall be sturdy and durable, with the capability to hold up to 250lbs of weight.
j. All console units shall be manufactured specifically for 24/7/365 usage in an operation’s center environment. Traditional office furniture is not acceptable.
k. All console units shall have a lower back privacy panel, under the desk surface.
l. The console unit shall not have an upper back paneling that would obstruct or limit visibility for the user when sitting at the console and facing either the back or front TV walls.
m. The contractor shall remove and dispose of all current control room consoles currently located in the R6
Watch Center. Contractor will be utilizing practices that meet current commercial standards and green initiatives. The contractor is not allowed to dispose of the console units using any government waste receptacles or onsite dumpsters. The contractor is responsible for hauling away all debris.
Workstation Chairs
The contractor shall provide, deliver, assemble, and install eight (8) BRISA Standard Next24I2707SKYP configuration 24/7 ergonomic task chairs, or approved brand-name equivalent if permitted by the solicitation, for use in the FEMA Region 6 Watch Center. Chairs shall be standard-size, commercial-grade, intensive-use ergonomic task chairs designed for 24/7/365 watch center operations and shared use by multiple personnel across rotating shifts. Each chair shall include adjustable ergonomic features, durable construction, pressure-reducing seating materials, heavy-duty base, and all components associated with the specified configuration.
Model type: BRISA - STANDARD Next24I2707SKYP:B15:C7:YHDS:SS:A4L:CUSLC:A4R:CUS-
LC:7.13:AL:S1S:AH2
Each chair should provide ergonomic support suitable for personnel working extended shifts in a watch center environment. At a minimum, each chair shall include:
• Adjustable seat height
• Adjustable seat depth or seat positioning
• Adjustable lumbar support
• Adjustable backrest support
• Independent backrest tilt and/or back angle adjustment
• Adjustable armrests
• Multi-user adjustability suitable for shared shift operations
• The chair shall allow users to adjust quickly and without specialized tools.
Each chair shall include seating materials and construction designed to reduce pressure points and operator fatigue during extended seated work periods. The chair should provide long-duration comfort appropriate for emergency management, watch center, and control room environments.
Each chair shall include a standard-size ergonomic seat and back suitable for 24/7 operational use. Materials shall be durable, commercial-grade, and appropriate for repeated daily use in a shared work environment.
The chairs shall support continuous operations 24 hours per day, 7 days per week, 365 days per year watch center environment where multiple users may share seating across rotating shifts.
The contractor shall provide full installation services for all eight chairs. Installation shall include, at a minimum:
• Delivery to the designated installation area within the facility
• Unpacking of all chair components
• Assembly of each chair, if not preassembled
• Placement of each chair in the Government-designated watch center location
• Adjustment checks to verify each chair’s major ergonomic functions operate properly
• Removal and disposal of all packaging materials, pallets, wrapping, and debris
• Confirmation that all eight chairs are fully functional and ready for use
Conference Table:
The contractor shall provide one (1) Conference table.
Conference table must be at least 96 inches long and 50 inches wide and color matched to control room console units. Conference Table Type AELITE AIR 24/7 - 10x OP DIMENSIONS: 96" x 50.4" x 29.3" - 2x Foot LED -
4x Corner LED- 2x Connectivity power/data box.
1) ASTM Class 1 - fire rating, and Contract Grade Class 31 - commercial grade.
2) Grey in color.
Conference Room Chairs
The contractor shall provide all labor, materials, equipment, supervision, delivery, assembly, and installation necessary to furnish eight (8) 65A300 Think Chair, 3D Knit 5064, Monochromatic, Black Licorice, Plastic Base
PG1-6205 Black, No Headrest, Adjustable Arms, Lumbar Support, Hard Casters, No Soil Retardant, for the
FEMA Region 6 Watch Conference Room. The contractor shall ensure all chairs are delivered in new condition, assembled as required, placed in the Government-designated secured conference room, and fully functional upon completion. The contractor should remove all packaging and debris from the site and provide applicable manufacturer warranty documentation.
Model type: 65A300 Think Chair - 3D Knit 5064, Monochromatic. Black Licorice. Plastic base-PG1-6205-Black.
No headrest, Adjustable arms, Lumbar. Hard casters. No soil retardant
The contractor shall remove and relocate all current furniture and chairs currently located in the R6 Watch Center utilizing the on campus East Storage Shed in coordination with the COR.
The contractor is not allowed to dispose of the console units using any government waste receptacles or onsite dumpsters. The contractor is responsible for hauling away all debris.
3.0 CONTRACTOR PERSONNEL, EQUIPMENT, USE OF PREMISES, WASTE, AND
LOADING DOCK
3.1 CONDUCT AND BEHAVIOR
The Contractor shall ensure that a safe and professional environment is maintained around all
Contractor activities. The spaces in which the work is being performed may have FEMA staff meetings or other business sessions during the performance of this contract. Contractor personnel shall always maintain an appropriate decorum. The Contractors and his/her personnel shall not create interruptions, noise or offensive situations that may interfere with the FEMA work environment. In the event FEMA receives a complaint regarding the behavior of a
Contractor personnel, the Contractor will be notified. Upon receipt of notification, the Contractor shall promptly remove the Contractor personnel from the premises and take immediate steps to ensure that performance under this contract will not be reduced or interrupted.
3.2 RESTROOMS
All Contractor personnel are to use the designated restrooms within the building. FEMA will advise of the appropriate location for each building.
3.3 SMOKING
H.R. 2118, Prohibit Smoking in Federal Buildings. This order prohibits the smoking of tobacco products prohibits in, and on all:
• Interior GSA-occupied space;
• Exterior GSA-occupied space, including courtyards, garages, loading docks, stairwells, rooftops and balconies;
• Other outdoor areas under GSA control within 25 feet of doorways and building air intake ducts; and
• Government-owned or -leased vehicles assigned to GSA.
• It is the Contractor’s responsibility to inform their personnel of the Agency's no smoking policy.
3.4 WORKFORCE
All Contractor personnel shall be fully trained and dressed in clean, standardized company uniforms with a standardized method of identifying personnel. Contractor personnel who are not trained or not in uniform will be asked to leave the premises. Contractor personnel shall be trained in the operation of all safety equipment required for this project.
The Contractor shall ensure adequate workforce and equipment commitments. If there are delays in the services because of any shortages, any associated time and material costs shall be at the
Contractor’s expense.
Contractor personnel shall not accept gratuity. Contractor personnel shall not perform work other than the tasks outlined in the SOW, without prior approval and authorization from the CO. If the
Contractor performs work outside of the SOW, and without approval and authorization from the
CO, they do so at their own risk, including non-payment of unauthorized work.
3.5 STAFFING
Work may be conducted simultaneously throughout all the areas outlined in this SOW. Contractor personnel and/or supervisors shall have an organized approach to properly coordinate activity.
3.6 BUILDING PROTECTION
The Contractor shall not block access to emergency ingress/egress points of building infrastructure hubs with staged and/or stored items. This includes, but is not limited to stairwells, elevators, main corridors, electrical closets, communications closets, and mechanical rooms.
3.5 RESPONSIBILITY
FEMA will not be held liable for, or incur any additional expenses for:
• Damage to furniture, equipment, facilities, flooring, walls, elevators, loading docks, or other government property caused by Contractor personnel during delivery, movement, assembly, or installation.
• Loss, theft, or misplacement of furniture, parts, tools, materials, or equipment while in the Contractor’s custody or control.
• Failure to deliver furniture, parts, tools, or materials to the correct location, floor, room, workstation, or designated staging area.
• Delays caused by Contractor failure to coordinate delivery schedules, building access, loading dock use, elevator reservations, or escort requirements in advance.
• Delays or additional costs resulting from incomplete, incorrect, or missing delivery documentation, packing lists, bills of lading, installation drawings, or inventory records.
• Contractor failure to provide sufficient labor, supervision, tools, dollies, carts, protective materials, or equipment necessary to safely complete delivery and setup.
• Improper assembly, installation, leveling, anchoring, or configuration of furniture according to manufacturer instructions, approved layouts, or FEMA COR direction.
• Failure to remove and properly dispose of packing materials, pallets, crates, debris, trash, or excess materials generated during delivery and setup.
• Failure to protect existing building surfaces, including floors, walls, doors, elevators, and common areas, during delivery and installation.
• Inability to complete work during approved delivery windows, business hours, after-hours periods, or other scheduled access times.
• Additional costs resulting from re-delivery, re-handling, storage, or return trips caused by Contractor error, incomplete shipments, incorrect shipments, or failure to bring required tools or materials.
• Failure to comply with building rules, site safety requirements, security procedures, loading dock restrictions, parking requirements, or escort protocols.
• Injuries, accidents, or safety incidents involving Contractor personnel, subcontractors, or delivery crews during furniture delivery, movement, assembly, or setup.
• Failure to verify quantities, condition, model numbers, finishes, dimensions, or configuration of delivered furniture against the purchase order, task order, or approved furniture plan.
• Delivery or installation of damaged, defective, incorrect, incomplete, or nonconforming furniture, parts, hardware, or materials.
• Failure to correct punch list items, deficiencies, missing components, damaged items, or installation issues within the required timeframe.
• Failure to maintain required insurance, licenses, certifications, or qualifications needed to perform furniture delivery, assembly, or installation services.
• Any costs associated with temporary storage, warehousing, staging, or rescheduling due to Contractor delays, missed delivery windows, incomplete delivery, or lack of coordination.
3.6 EQUIPMENT AND STORAGE
The Contractor shall provide all equipment associated with the entire project, operate in a safe manner, and adhere to all OSHA and GSA standards.
The Contractor shall provide and store all equipment and materials required to complete the project. The equipment and materials are required to be kept organized throughout the duration of the project.
3.7 CONTRACTOR USE OF THE PREMISES
During the period of the project, the Contractor shall have access to the site, during the following hours only: 8:00 a.m. to 4:00 p.m. Central Time, Monday through Friday. No on-site work shall be performed outside these hours or on holidays unless otherwise approved by the CO. The Contractor shall coordinate with the CO or COR to arrange access to the
Denton, Texas Federal Regional Center. The Contractor shall not cause any damage to parking lots, hallways, walls, or any other exterior and interior areas during the performance of this contract.
The Contractor shall be held responsible for any damage caused by the Contractor’s employees and shall repair the damage at the Contractor’s expense.
The parking lot shall be available for contractor use and staging during that time period only through coordination with FEMA and all parking is to be by mutual agreement with the COR or Facility Manager. The contractor may park one supply trailer on campus in a location designated by the COR or Facilities Manager. All other vehicles and materials must be removed from the parking lot at the end of each workday.
Work in the FEMA Office will require coordination. The contractor shall contact the designated COR to coordinate arrangements upon behalf of the project. Limit use of the premises to the immediate work area will be allowed.
The following are required of the contractor:
• Shall not disturb portions of the Office Complex beyond the immediate work area
• Shall repair or replace damage to existing site features caused by construction.
• Shall protect the building during the construction period
• Shall keep driveways, loading docks, elevators, elevator entrances, and building entrances clear; these areas are not authorized for parking or material storage without permission
• Shall schedule deliveries to minimize on-site storage of materials and equipment
• Shall designate a representative to receive building materials; FEMA personnel are not authorized to receive shipments or deliveries upon behalf of a construction contractor.
3.8 WASTE MANAGEMENT
DHS, FEMA R6 has established that this project shall generate the least amount of waste possible.
The Contractor shall employ processes which ensure the generation of as little waste as possible and avoid the generation of waste due to over-packaging, error, poor planning/layout, breakage, contamination, damage from weather, etc. Of the inevitable waste that is generated, as many of the waste materials as economically feasible shall be reused, salvaged, or recycled. Waste disposal to a landfill shall be minimized to the greatest extent possible.
The Contractor is responsible for all debris removal related to work being performed under this contract.
3.9 LOADING DOCK
The Contractor shall coordinate deliveries of supplies and materials with CO or COR to avoid conflict with FEMA Region 6 day-today work conditions at the site. The Contractor may use the loading dock, with prior approval from the CO or COR.
4.0 SECURITY
All personnel require access to unclassified information only. Contractors must ensure contractor employees receive a favorably background investigation prior to entry on duty (EOD). All individuals will be U.S. citizens. The contractor shall follow the standards established within DHS and FEMA policy.
Background Investigations:
All contractor personnel who require access to DHS or FEMA information systems, routine access to DHS or FEMA facilities, or access to sensitive information, including but not limited to Personally Identifiable Information (PII), shall be subject to a full background investigation commensurate with the level of the risk associated with the job function or work being performed. FEMA’s Personnel Security Division (PSD) will determine the risk designation for each contractor position by comparing the functions and duties of the position against those of a same or similar federal position, applying the same standard for evaluating the associated potential for impact on the integrity and efficiency of federal service.
Low Risk without Information System Access:
Contractor personnel occupying positions or performing functions with a Low-Risk designation and who do not require access to DHS or FEMA information systems may undergo a Tier 1 investigation with a credit check and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract. (also reference Facility
Access).
Low Risk with Information System Access:
Contractor personnel occupying positions or performing functions with a Low-Risk designation and who require access to
DHS or FEMA information systems shall undergo a Tier 2 Suitability Background Investigation (T2) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.
Moderate Risk:
Contractor personnel occupying positions or performing functions with a Moderate Risk designation shall undergo a Tier
2 Suitability Background Investigation (T2) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.
High Risk:
Contractor personnel occupying positions or performing functions with a High Risk designation shall undergo a Tier 4
Suitability Background Investigation (T4) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.
Background Investigation Process:
To initiate the request to process contractor personnel, the Contractor shall provide the FEMA Contracting Officer’s
Representative (COR) with all required information and comply with all necessary instructions to complete Section II of the FEMA Form 121-3-1-6, “Contract Fitness/Security Screening Request.” The FEMA COR shall ensure that all other applicable sections of the FEMA Form 121-3-1-6 are complete prior to submitting the form to FEMA PSD for processing.
The Contractor shall also provide the FEMA COR with completed OF 306, “Declaration for Federal Employment,” forms for all contractor personnel.
Contractor personnel who already have a favorably adjudicated background investigation, may be eligible to perform work under this contract without further processing by FEMA PSD if:
• The investigation was completed within the last five years,
• It meets or exceeds the minimum requirement for the position they will occupy or functions they will perform on this contract,
• The contractor personnel have not had a break in employment since the prior favorable adjudication, and,
• FEMA PSD has verified the investigation and confirmed that no new derogatory information has been disclosed which may require a reinvestigation.
FEMA PSD will notify the COR of the names of the contractor personnel eligible to work based on prior, favorable adjudication. The COR will, in turn, notify the Contractor of the names of the favorably adjudicated contractor personnel, at which time the favorably adjudicated contractor personnel will be eligible to begin work under this contract.
For those contractor personnel who do not have an acceptable, prior, favorable adjudication or who otherwise require reinvestigation, FEMA PSD will issue an electronic notification via email directly to the contractor applicant/personnel that contains the following documents, which are incorporated into this contract by reference, along with a link to the
National Background Investigation Services (NBIS) e-Application (eAPP) online system and instructions for submitting the necessary information:
• Standard Form 85P, “Questionnaire for Public Trust Positions”
• Optional Form 306, “Declaration for Federal Employment”
• SF 87, “Fingerprint Card” (2 copies)
• DHS Form 11000-6, “Non-Disclosure Agreement”
• DHS Form 11000-9, “Disclosure and Authorization Pertaining to Consumer Reports Pursuant to the Fair Credit
Reporting Act”
FEMA PSD will only accept complete packages consisting of all of the above document and Standard Form 85P, which must be completed electronically through the National Background Investigation Services (NBIS) e-Application (eAPP) online system. The Contractor is responsible for ensuring that all contractor personnel timely and properly submit all required background information.
Once contractor personnel have properly submitted the complete package of all required background information, FEMA’s Personnel Security Division, at its sole discretion, may grant contractor personnel temporary eligibility to perform work under this contract prior to completion of the full background investigation if the Personnel Security
Division’s initial review of the contractor personnel’s background information reveals no issues of concern. In such cases, FEMA’s Personnel Security Division will provide notice of such temporary eligibility to the COR who will then notify the Prime Contractor, at which time the identified contractor personnel will be temporarily eligible to begin work under this contract. Neither the Prime Contractor nor the contractor personnel has any right to such a grant of temporary eligibility. The grant of such temporary eligibility shall not be considered as assurance that the contactor personnel will remain eligible to perform work under this contract upon completion of and final adjudication of the full background investigation.
Upon favorable adjudication of the full background investigation, FEMA’s Personnel Security Division will update the contractor personnel’s security file and take no further action. In any instance where the final adjudication results in an unfavorable determination, FEMA’s Personnel Security Division will notify the contractor personnel directly, in writing, of the decision and will provide the COR with the name(s) of the contractor personnel whose adjudication was unfavorable. The COR will then forward that information to the Contractor. Contractor personnel who receive an unfavorable adjudication shall be ineligible to perform work under this contract. Unfavorable adjudications are final and not subject to review or appeal.
Continued Eligibility and Reinvestigation:
Eligibility determinations based on a Low Risk T1, Moderate Risk T2S or High Risk T4 are valid for five years from the date that the investigation was completed and closed. Contractor personnel required to undergo a background investigation to perform work under this contract shall be ineligible to perform work under this contract upon the expiration the background investigation unless and until the contractor personnel have undergone a reinvestigation and
FEMA’s Personnel Security Division has renewed their eligibility to perform work under this contract.
Exclusion by Contracting Officer:
The Contracting Officer, independent of FEMA’s Personnel Security Division, may direct the Contractor be excluded from working on this contract. Any contractor found or deemed to be unfit or whose continued employment on the contract is deemed contrary to the public interest or inconsistent with the best interest of the agency may be removed.
OPSEC Training:
Contractors and Subcontractors who are working on this contract shall receive the OPSEC Awareness Brief.
Access to the briefing can be obtained at OPSEC Awareness for Military Members, DOD Employees and Contractors
(usalearning.gov)
Send the certificate of completion to the FEMA Contracting Officer Representative no later than 30 calendar days after awarded contract. New employees entering the contract must receive the briefing within ten (10) business days of joining the contract.
Insider Threat Training:
Insider Threat training for Contractors can be found at: Insider Threat Awareness (usalearning.gov)
Certificate of training is required for all cleared contractor employees who are working with classified or unclassified information. All certificates must be sent to the assigned FEMA Contracting Officer Representative, before the
Contractor or Subcontractor is granted access to classified or unclassified information but no later than 30 calendar days after awarded contract. All cleared contractor personnel are required to recertify Insider Threat training annually thereafter. New employees entering the contract must receive the briefing within ten (10) business days of joining the contract.
Facility Access:
The Contractor shall comply with FEMA Directive 121-1 “FEMA Personal Identity Verification Guidance,” FEMA
Directive 121-3 “Facility Access,” and FEMA Manual 121-3-1 “FEMA Credentialing Access Manual,” to arrange for contractor personnel’s access to FEMA facilities, which includes, but is not limited to, arrangements to obtain any necessary identity badges for contractor personnel.
Contractor personnel working within any FEMA facility who do not require access to DHS or FEMA IT systems and do not qualify for a PIV Card may be issued a Facility Access Card (FAC). FACs cannot exceed 180 days; all contractors requiring access greater than 180 days will need to qualify for and receive a PIV card before being allowed facility access beyond 180 days.
Contractor personnel shall not receive a FAC until they have submitted a SF 87, “Fingerprint Card,” and an OF306, Declaration for Federal Employment, and receive approval from FEMA PSD. Contractor personnel using a FAC for access to FEMA facilities must be escorted in Critical Infrastructure areas (i.e., server rooms, weapons rooms, mechanical rooms, etc.) at all times.
FEMA may deny facility access to any contractor personnel whom FEMA’s Office of the Chief Security Officer has determined to be a potential security threat.
Separation of Contract:
The Contractor shall notify the FEMA COR of all terminations/resignations within five calendar days of occurrence. The
Contractor must account for all forms of Government-provided identification issued to contractor employees under a contract (i.e., the PIV cards or other similar badges) must return such identification to FEMA as soon as any of the following occurs:
• When no longer needed for contract performance.
• Upon completion of a contractor employee’s employment.
• Upon contract completion or termination.
If an identification card or building pass is not available to be returned, the Contractor shall submit a report to the FEMA
COR, referencing the pass or card number, name of the individual to whom it was issued, and the last known location and disposition of the pass or card.
The Contractor or contractor personnel’s failure to return all DHS- or FEMA-issued identification cards and building passes upon expiration, upon the contractor personnel’s removal from the contract, or upon demand by DHS or FEMA may subject the contractor personnel and the Contractor to civil and criminal liability.
The contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this SOW. The Project Manager shall be present on site anytime work is being performed and shall be a single point of contact for the Contracting Officer and the COR. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project
Manager, shall be provided to the Government as part of the Contractor's proposal. The Project
Manager is further designated as Key by the Government. During any absence of the Project
Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates shall be able to read, write, speak, and understand English. Additionally, the contractor shall not replace the
Project Manager without prior approval from the Contracting Officer. A list of names and proof of
U.S. citizenship for contractor personnel supporting this project, shall be required from the awardee/contractor, and submitted to FEMA.
For a waiver to be granted: There must be a compelling reason for using this individual as opposed to a U. S. citizen; and the waiver must be in the best interest of the Government. Contractors shall identify in their quotes the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the contracting officer.
5.0 PERIOD OF PERFORMANCE
Contractor shall provide a detailed project timeline from notification of award to full project completion, to include cleanup of site. Vendors shall propose a delivery and installation schedule. The Government will evaluate the proposed schedule as part of technical acceptability.
A separate R6 Watch Center AV Upgrade project will begin after all tasks for this project have been completed by the contractor and have been fully accepted by FEMA. Delays in this project are not excusable, unless specifically covered in FAR 52.249-14 Excusable Delays, as they may cause potential financial loss and harm to the Government if this project is not completed on time.
6.0 GOVERNMENT TERMS AND DEFINITIONS
DHS – Department of Homeland Security
FEMA – Federal Emergency
Management Agency FRC –
Federal Regional Center
OSHA – Occupational Safety and Health
Administration COR – Contracting
Officer's Representative
CO – Contracting Officer R6 – Region 6
SOW –
Statement of
Work
GOVERNMENT FURNISHED PROPERTY
The Government will not furnish any resources or property to the Contractor in support of this contract.
7.0 GOVERNMENT ACCEPTANCE PERIOD
7.1 SITE CLEARANCE AND CLEAN UP
Before scheduling the final inspection, the Contractor shall accomplish the following items:
• Contractor shall restore or refinish, to original condition, surfaces that are damaged due to the work of this contract.
• The Contractor shall clear away all debris and excess material accumulated at the site and dispose of it away from premises and maintaining a neat site condition.
• On completion of project, Contractor shall remove all tools, equipment and surplus materials and leave the site clean and tidy.
7.2 FINAL INSPECTION
The Contractor’s shall notify the CO and COR, when the project is complete and ready for final inspection.
Upon receipt of request that project is complete FEMA will have five (5) business days to complete the final inspection, and either accept or reject the deliverables. Final inspection shall be conducted by the CO, COR, or designated FEMA representative.
The Contractor will be notified via email, that the deliverables have been inspected and either rejected or accepted.
If the deliverables are rejected, FEMA shall provide a list of areas or tasks that are deficient and require correction. Upon notification of rejection, the Contractor shall have five (5) business days to complete the work requiring correction.
8.0 OTHER TERMS AND CONDITIONS
8.1 INSURANCE REQUIREMENTS