This is a work statement/performance specification for forklift repair services on a Hyster Model H190FT with 17,350 lbs capacity. The contractor must provide trained personnel and specialized tools to address 13 identified issues including hydraulic cylinder leaks in the main lift, tilt, sideshift, and fork positioner systems; damaged hoses requiring replacement; alternator failure; disconnected battery brackets creating fire hazards; non-functional lighting and backup alarms; and a torn operator seat requiring replacement.
The scope includes comprehensive hydraulic system overhaul with cylinder removal, disassembly, cleaning, polishing, and re-sealing; fabrication and installation of new high-pressure hoses; alternator and belt replacement; battery bracket reinstallation; installation of LED headlights, strobe lights, and backup alarms to meet OSHA requirements; planned maintenance service including oil changes, lubrication, and safety inspection; and seat assembly replacement with control transfer. Required parts include seal/packing kits, hydraulic hoses, electrical components, filters, fluids, and hardware. The contractor must provide pick-up and delivery services and will test the equipment upon completion, advising the client immediately of any additional issues discovered. Performance will be scheduled by the COTR with at least two weeks notice and conducted Monday through Friday, 6:30 AM to 3:00 PM, excluding holidays. Contacts are LT Julia Ferris (305-535-4332) and Mr. Bryan Goltz (305-535-4337).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FP Service Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION/SPECIFICATION/WORK STATEMENT
FOR WEIGHT HANDLING CERTIFICATION
Work Statement
In the performance of this contract, the contractor shall provide the services to perform the following services on our Hyster forklift. The contact person for this contract is LT
Julia Ferris, 305-535-4332, or Mr. Bryan Goltz, 305-535-4337.
Scope of Services
The contractor shall furnish trained, qualified personnel, and any required special tools or equipment necessary to complete the following work:
Hyster Model H190FT Capacity 17350lbs
1. MAIN LH AND RH SIDE LIFT CYLINDERS ARE LEAKING
HYDRAULIC OIL THROUGH SEALS.
2. TILT CYLINDERS LEAKING HYDRAULIC OIL THROUGH
SEALS
3. SIDESHIFT CYLINDER ASSEMBLY LEAKING
HYDRAULIC OIL THROUGH SEALS.
4. FORK POSITIONER CYLINDERS LEAKING HYDRAULIC
OIL THROUGH SEALS.
5. MAIN FORK POSITIONER HOSES ON MAST, SWOLLEN
AND DAMAGED. REPLACEMENT REQUIRED. AND ALSO
SIDESHIFT HOSES ON ATTACHMENT NEED TO BE
REPLACED, DUE TO LEAKING HYDRAULIC OIL ALSO.
6. FORK POSITIONER HOSES ON ATTACHMENT NEED TO
BE REPLACED, BINDING OCCURRING AND HYDRAULIC
LEAK IS PRESENT.
7. ALTERNATOR ASSEMBLY NOT CHARGING. SHORT
OCCURRING.
8. BATTERY HOLD DOWN BRACKET ARE DISCONNECTED.
BATTERY MOVEMENT PRESENT. _* FIRE HA_ZARD
9. HEAD LIGHT ASSEMBLY REAR ILLUMINATION NEEDED
ON UNIT.
10. BACK UP ALARM ON UNIT NOT WORK. NEW CIRCUIT
NEEDED.
11. STROBE LIGHT INSTALLATION REQUIRED.
12. PM - PLANNED MAINTENANCE NEEDED ON UNIT
13. SEAT ASSEMBLY IS TORN REPLACEMENT OF SEAT
RECOMMENDED.
MISSING SECTION ON SEAT ASSEMBLY PRESENT.
OPERATOR WILL BE AFFECTED WITH IMPROPER
CONTOURS THAT PRESENT.
REPALCEMENT OF SEAT ASSEMBLY REQUIRED.
ELECTRIC CONTROLS WILL BE MOVED OVER TO THE
NEW SEAT ASSEMBLY EXPRESSED.
THE FOLLOWING REPAIRS AND SERVICE WILL BE
PERFORMED ONCE ESTIMATE IS APPROVED:
PERFORM REMOVAL OF MAIN LH _& RH SIDE LIFT
CYLINDER ASSEMBLIES.
DIS-ASSEMBLE, CLEAN, POLISH AND RE-SEAL OF MAIN
LH _& RH SIDE LIFT CYLINDER ASSEMBLIES.
PERFORM INSTALLATION OF MAIN LH _& RH SIDE LIFT
CYLINDER ASSEMBLIES.
PERFORM REMOVAL OF LH AND RH SIDE TILT CYLINDER
ASSEMBLIES.
DIS-ASSEMBLE, CLEAN, POLISH, RE-SEAL AND ASSEMBLE
LH AND RH SIDE TILT CYLINDER ASSEMBLIES.
PERFORM RE-INSTALLATION OF LH AND RH SIDE TILT
CYLINDER ASSEMBLIES BACK ONTO UNIT AS PER
SPECIFICATIONS.
PERFORM REMOVAL OF SIDESHIFT CYLINDER
ASSEMBLY.
DIS-ASSEMBLE, CLEAN, POLISH, RE-SEAL AND ASSEMBLE
SIDESHIFT CYLINDER ASSEMBLY.
PERFORM RE-INSTALLATION OF SIDESHIFT CYLINDER
ASSEMBLY.
REMOVAL OF FORK POSITIONER CYLINDER ASSEMBLY.
DIS-ASSEMBLE, CLEAN, POLISH, RE-SEAL AND ASSEMBLE
FORK POSITIONER CYLINDER ASSEMBLY.
RE-INSTALL FORK POSITIONER CYLINDER ASSEMBLY.
PERFORM REMOVAL OF BOTH MAIN HIGH PRESSURE
HOSES LOCATED ON MAST.
FORK POSITIONER CIRCUIT
PERFORM FABRICATION WITH THE INSTALLATION OF
NEW HOSES AS PER SPECS ONTO UNIT WITH PROPER
ADJUSTMENT.
PERFORM REMOVAL OF SIDESHIFT ATTACHMENT HOSES.
PERFORM FABRICATION OF NEW HOSES AS PER SPECS.
PERFORM INSTALLATION WITH PROPER ADJUSTMENT OF
2 SIDESHIFT HOSES AS PER SPECS.
PERFORM REMOVAL AND INSTALLATION OF NEW
ALTERNATOR ASSEMBLY WITH THE INSTALLATION OF
NEW ALTERNATOR BELT ASSEMBLY AS PER SPECS
PERFORM RE-INSTALLATION OF BATTERY HOLD - DOWN
BRACKET BACK ONTO UNIT, TO AVOID MOVEMENT OF
BOTH BATTERIES THAT ARE PRESENTLY INSTALLED AND
ARE LOOSE. MOVEMENT PRESENT - _* FIRE HA_ZARD
PERFORM THE REMOVAL AND INSTALLATION OF BOTH
FRONT HEAD LIGHT ON THE FRONT SECTION OF UNIT.
PERFORM REMOVAL AND INSTALLATION OF REAR
FACING HEADLIGHT ASSEMBLY.
PERFORM REMOVAL AND INSTALLATION OF NEW
STROBE LIGHT ASSEMBLY WITH NEW BRACKET AND
RELATED WIRING AS PER SPECS.
PERFORM REMOVAL AND INSTALLATION OF NEW BACK
UP ALARM ASSEMBLY WITH RELATED WIRING AS PER
SPECS.
_*_*_*OSHA REQUIREMENT THAT ALL THESE COMPONENTS
ARE INSTALLED AND WORKING AT ALL TIMES._*_*_*
PERFORM PM - ( PLANNED MAINTENANCE ) SERVICE.
INCLUDES THE FOLLOWING:
BLOWING OFF AND INSPECTION OF ALL COMPONENTS
WITH COMPRESSED AIR.
REPLACEMENT OF MOTOR OIL AND OIL FILTER.
LUBRICATION OF ALL SECTIONS OF UNIT.
PERFORM FULL SAFETY INSPECTION OF ENTIRE UNIT AS
PER SPECIFICATIONS.
PARTS :
SEAL / PACKING KIT - MAIN LIFT CYLINDER
SEAL / PACKING KIT - TILT CYLINDER
SEAL / PACKING KIT - FORK POSITIONER CYLINDER
SEAL / PACKING KIT - SIDESHIFT CYLINDER
HOSE - MAIN - HIGH PRESSURE - FORK POSITIONER
HOSE - ATTACHMENT - SIDESHIFT
BRAKE CLEANER
GREASE - HI TEMP
ALTERNATOR ASSEMBLY
BELT - ALTERNATOR
HEAD LIGHT - LED
STROBE LIGHT - LED - AMBER - BRACKET INCLUDED
BACK UP ALARM - BRACKET INCLUDED
AIR FILTER - OUTER
OIL FILTER - ENGINE
FILTER - DIESEL - FUEL
MOTOR OIL - DIESEL
GREASE - HI TEMP
LUBRICANT - ANTI-CORROSION / PENETRANT
ANTIFREE_ZE / COOLANT
HARDWARE / SUPPLIES
SEAT ASSEMBLY - CONTOURED WITH NEW
RETRACTABLE SEAT BELT ASSEMBLY
BASE INCLUDED FOR CONTROLS TO BE TRANSFERRED
FROM OLD SEAT ASSEMBLY ONTO NEW SEAT ASSEMBLY
EXPRESSED.
HARDWARE / SUPPLIES
PICK UP AND DELIVERY SERVICES - ROUND TRIP ( 2
TRIPS INVOLVED.)
_*_*_* IMPORTANT NOTICE TO ALL CLIENTS_! PLEASE READ_!
_*_*_*NOTES_*_*_*
UNIT WILL BE OPERATED AND TESTED AS PER SPECS.
IF ANY ADDITIONAL ISSUES AND/OR FINDINGS ARE
FOUND TO BE PRESENT, CLIENT WILL BE ADVISED
IMMEDIATELY.
Contractor Performance Requirements
(1) Testing period of performance will be scheduled as determined by the contractor schedule.
(2) Exact periods of performance will be scheduled by the COTR at least two weeks prior to start and will be performed Monday through Friday excluding holidays, during the following work hours:
6:30 am to 3:00 pm