Statement of Work.pdf

PDF 211 KB Posted

Attached to
Upgrade Light Switches and Sensors to Motion Detectors
Solicitation number
12805B21Q0659
Issued by

View the file

Other files

File Type Posted
SF-1442 with Clauses and Provisions.pdf PDF
Clauses and Provisions 12805B21Q0659.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

St at em en t o f W or k

Statement of Work for 1

USDA GFHNRC

2420 2nd Ave. North Grand Forks, ND 58203

Statement of Work for the replacement of manual light switches with motion sensing automatic switches and light fixtures.

Date 8/20/21

Scope of Work

Remove the existing manual light switches and lighting fixtures. Replace with motion sensing automatic switches and lights in numerous locations throughout the Grand Forks Human Nutrition Research Center.

Architectural All dimensions, locations, measurements and methods are estimations. On‐site field verification is strongly suggested.

All fixtures and switches must work with the existing voltage and amperage. The GFHNRC does not have a location for the contractor to store inventory indoors or outdoors. GFHNRC will not be responsible for receiving packages for this project.

Statement of Work for Client Name 8/20/21 2

Demo existing switch plates, switches, light fixtures and modify wall or ceiling. Debris and removed devices must be properly discarded according to state and federal guidelines.

All modifications made must be clean and have a proper fit and finish when complete.

All devices, fixtures and processes must meet federal and local codes.

New work to include: (All labor and materials) All voltage and amperage requirements are to be verified by contractor/offeror.

1. Remove qty of 29 existing 4’ dual fluorescent tube light bulb fixture. Furnish and install a qty of 29 Satco NUVO 65-1098 4ft LED lamps in the stairwells.

2. Furnish and install 20 Leviton ODW12-MDW wall/ceiling mount motion sensors to control corridor lighting. This includes the rewiring necessary to assign lighting loads to the sensor controlling the area.

3. Furnish and add 2 Leviton ODC0S-I1 Ceiling mounted occupancy sensor & switching relays.

4. Furnish and install 24 Leviton ODS10-ID Decora wall switch occupancy sensors.

Electrical safety Lock Out Tag Out safety plan must be developed and followed by the contractor. The USDA will not be responsible for circuit tracing. The contractor will be responsible for properly reenergizing the circuits.

USDA Covid 19 Protocol for contractors will be enforced.

File details come from the government source that posted it. Updated .