Statement_of_Work.pdf
PDF 6 MB Posted
- Attached to
- Window Replacement Federal contract opportunity
- Solicitation number
- 140P6421R0042
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Clause_Package_-_Revised_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Sol_140P6421R0042_Amd_0001.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Wage_Determination.pdf | ||
| Updated_-_COVID-19_Mask_Policy.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Bid_Schedule.xlsx | XLSX spreadsheet | |
| Technical_Questionnaire.pdf | ||
| Past_Performance_Questionnaire.docx | DOCX document | |
| Sol_140P6421R0042.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ice Age National Scenic Trail
Cross Plains, WI
Windows Replacement
PMIS 305688
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
May 26, 2021
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 08 – WOOD WINDOWS
Section 08 52 00 Wood Windows
DRAWINGS and PHOTOGRAPHS
Drawing and photographs of the are included at the end of this Division for reference only.
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: The Wilkie house and farm was purchased by the NPS and acquired in 2008. It was purchased with intention of moving the Ice Age National Scenic Trail (Ice Age NST) Administrative offices to the site and further goal of creating an interpretive center for the Ice Age NST. The Wilkie house was renovated in 2019-2020 and now is the administrative headquarters for the Ice Age NST. The Wilkie house has seen several significant additions to the building. The first was the stone portion of the building in 1864; followed by an addition of the Southeast wing and incorporating the Usonian style elements. The final was the Southwest wing which followed the same theme. Though the building is not eligible for the National Historic Register, it is a classic and elegant building. Moreover, the building is situated adjacent to the Ice Age NST which has over 2 million visitors per annual. The goal of this project is to replace the windows that are failing due to age and lack of upkeep with energy efficient and functional windows. The old windows are single pane french door opening windows with removeable storm or screen french door windows of which many of them are missing. The seals between windows are not tight and in some the entire window frame is leaking air. With central heat and air a combination of casement and picture windows will be the best solution to preserving the character of the building and superlative views while providing emergency egress and natural ventilation at key locations.
1.2 Work Covered by the Contract Documents:
A. Project Location: Ice Age National Scenic Trail, Wilkie House; Ice Age National Scenic Trail, 8075 Old Sauk Pass Road, Cross Plains Wi 53528
B. Work consists of: The work for this project consists of removing and replacing 15 windows with pine/fir fixed or casement type windows as shown on the plans and in the pictures attached. The new wood windows will be finished in the same color and sheen as the existing jamb extensions in each opening or if they are completely changed including the interior jambs they will match the color and sheen of the window adjacent to each individual window. Work will also include installation of all associated trims, flashings, aprons, sealants, paints and or stains as matches the existing interior and exterior colors and sheens.
C. All work will be performed under a single contract.
D. Period of performance: Work shall be completed within 90 days after issuance of the Notice to
Proceed. (POP is inclusive of 3 weather days)
ITEM 2 - EXISTING UTILITIES
2.1 Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
2.2 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
https://www.nps.gov/iatr/learn/management/superintendent-s-compendium.htm
A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public
3.2 On-site work hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer. Submit requests for work outside of the stated normal business hours to the Contracting Officer for approval at least 48 hours in advance of the work.
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to the location of each window replacement. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Limits: Confine construction operations to within 10-feet on either side of each existing opening that is being replaced.
C. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
https://www.nps.gov/iatr/learn/management/superintendent-s-compendium.htm
D. Security and Protection facilities installation:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Tree and Plant Protection: Provide Tree Protection fence at drip line of trees impacted in construction area. Protect any vegetation outside the windows during work. Coordinate with COR if there is any need to remove or damage any vegetation
3. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Substantial Completion.
Perform control operations lawfully, using environmentally safe materials.
3.4 Storage - Staging Areas:
A. There is no material storage space available on site. Contractor will deliver and install windows each day of work. Contractor may make a plan with COR in extreme circumstances related to site storage of materials if necessary.
3.5 Preservation of Natural Features: N/A
3.6 Hauling Restrictions: Match State and County road requirements for all park work/access.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work.
B. Dispose of waste materials legally off NPS property.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a) Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.
b) Maintain existing building in a weather tight condition throughout construction period.
c) Repair damage caused by construction operations.
d) Protect building and its occupants during construction period.
3.9 Photo Documentation:
All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo are needed for both the interior and exterior of each window being replaced. Shall be in JPEG digital form and submitted via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
A. Existing Condition Images: Before starting construction, take color, dated, digital images of project site and adjacent property/areas/etc. that may be impacted by construction activity/traffic.
Include existing items to remain or be salvaged from different vantage points and with context for location identification.
B. Construction Images:
1. Maintain organized index for photos with date, description, etc..
2. Additional images as needed when questions or emergency situations occur. Submit within
24 hours.
3.10 Fire and Life Safety:
As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the Contracting Officer within one day after the meeting.
A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).
B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
The Period of Performance for this project will be 90 days after issuance of Notice to Proceed.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on ground conditions as if they had inspected the job site. No change orders will be approved for work obvious during a site visit.
Please see FAR 52.236-27 - Site Visit (Construction).
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at the below https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.
A. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment in good repair at all times. As a minimum, maintain four hard hats and all other APP required equipment.
7.2 Submittals:
A. Accident Prevention Program: At the preconstruction conference submit for approval a site specific accident prevention program. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures. Provide current certification for first aid/CPR of designated individual.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies.
7. Recognition that work will be performed in remote areas with limited communication or cell phone coverage.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
https://www.nps.gov/orgs/1671/do-business-with-us.htm
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections. The Contractor shall document the “toolbox” meetings through the daily logs.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. .Provide operating instructions for all equipment. .
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer or designee as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide adequate facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary PPE. All PPE will be serviceable at all times
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the Ice Age National Scenic Trail Superintendent, Eric Gabriel, ph: 360-854-8316, email: eric_gabriel@nps.gov or Dan Watson, Safety Officer, ph: 715-441-7717, email:
daniel_watson@nps.gov mailto:eric_gabriel@nps.gov mailto:daniel_watson@nps.gov
ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26
8.1 A pre-construction conference between the awarded contractor, contracting office and COR will be held prior to the notice to proceed being issued. All items needed in order to schedule the pre-construction conference and issue the Notice to Proceed are listed in Item # 9
ITEM 9 - SUBMITTALS
9.1 General Submittal Procedures:
A. General: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submittals are to be sent to the COR for review and approval.
B. Submittal List: The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
C. Preconstruction Conference Submittal: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre- Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule.
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the
Contactor and all subcontractors.
9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.
A. Shop Drawings: Indicate installation design, flashing installation, sealing process used on the interior and the exterior, connection details, anchorage spacing, hardware locations, and installation details.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide brand specific component specifications and detailed dimensions for each opening with manufacturers installation instructions, anchorage method, hardware, etc.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 color samples 4” x 6” in size of actual interior stain finish color selected on the same species of wood with the matching sheen of finish surface for each opening and submit exterior stain samples for approval.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
D. For submittals specified above, forward submittals to Contracting Officer at least 15 days before need for approval.
E. After approving submittals, Contracting Officer will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: Refer to FAR 52.211-6 - If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Progress Schedules: As soon as possible after Notice of Award and before beginning any work, submit Progress Schedule. Contracting Officer will review the Progress Schedule for format and content.
Submit Progress Schedule electronically (normally in bar chart form) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted. The following information must accompany submission of progress schedules prior to processing any pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.
A sample Schedule of Values will be provided by the Contracting Officer.
ITEM 10 – TEMPORARY SERVICES
10 Fire Prevention and Protection:
A. Hazard Control: Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.
11.3 Completion and Final Inspection: Submit written certification that project is complete, and a final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete, following the final inspection, the. Contracting Officer will prepare a Punch List and issue a Letter of Substantial Completion.
B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, documented weather permitting.
D. If Contracting Officer determines that the work is not complete; he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
E. If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of final acceptance of work.
F. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
G. Disposition of any permits and warranties required by the specifications in this section.
11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of Completion and be in full affect for one year from the completion date.
B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall project Substantial Completion.
C. Information shall include operation and maintenance manuals for each warranted material.
Prints:
Photographs: Photo #1, Eastside of the house windows P/WC11 and O/WC10
Photo #2, Northside of the house windows L/WP7 first level; M/WC8 and N/WC9
Photo #3, Westside of the house windows K/WC6 (stone house window on the right)
Photo #4, Southside westwing, windows J/WC5; I/WP4 and H/WC4; G/WC3 and F/WP3; E/1WP1
Photo #5, Southside east wing; windows E/WP1; Q/1WP12 and 2WP/12 (center windows)
Photo #6-7, Windows E/2WP1 and E/1WP1
Photo #8-9, Windows E/2WP1 inside view and inside top hardware
Photo #10-11, Windows G/WC3 and F/WP3; I/WP4 and H/WC4 mullion between windows
Photo #12-13, Windows G/WC3 and F/WP3 upper right; I/WP4 and H/WC4 inside view
Photo #14-15 Example of recently replaced window on westside of house; K/WC6 outside view
Photo #16-17, Windows northside L/WP7 and Eastside O/WC10
Photo #18-19, Southside east wing windows Q/1WP12 and Q/2WP12 with mullion between windows
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
SECTION 085200
WOOD CLAD WOOD WINDOWS
PART 1 - GENERAL
1.1 SCOPE OF WORK
A. Project Location: Ice Age National Scenic Trail, 8075 Old Sauk Pass Road, Cross Plains, WI, 53528
B. Building(s) Name/Identifier: Wilkie Farm House
C. Work consists of the following: The work for this project consists of removing and replacing 15 wood windows with pine/fir fixed or casement type windows as shown on the plans and in the pictures attached. The new wood windows will be finished in the same color and sheen as the existing jamb extensions in each opening or if they are completely changed including the interior jambs they will match the color and sheen of the window adjacent to each individual window.
Work will also include installation of all associated trims, flashings, aprons, sealants, paints and or stains as matches the existing interior and exterior colors and sheens.
D. All measurement provided are approximate. Contractor to field verify all project dimensions.
E. Window Type: Picture (Fixed Unit)
1. WP1 Windows: E side of entry way corridor; two pane gas filled with wood border; low e
a. Window width in inches ___46____.
b. Window height in inches ___66 1/4____.
c. Window depth in inches ____6___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WP1 windows ____1_______.
2. WP2 Windows: W side of the entry way corridor; two pane gas filled with wood border;
low e
a. Window width in inches ___46____.
b. Window height in inches ___66 1/4____.
c. Window depth in inches ____6___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WP2 windows ____1_______.
F. Window Type: Picture (Fixed Unit)
1. WP3 Windows: SE of west wing; two pane gas filled; Mullion between F and G
a. Window width in inches ____37___.
b. Window height in inches ____37 7/8___.
c. Window depth in inches ____6___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WP3 windows ______1_____.
G. Window Type: Casements
1. WC3 Windows: SE of west wing opening to the east; two pane gas filled;
a. Window width in inches ___37____. Mullion between F and G
b. Window height in inches ___37 7/8____.
c. Window depth in inches ___6____.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WC3 windows _____1______.
f. Window screen type: fiberglass or kevlar that keeps out mosquitos, etc._______.
H. Window Type: Casements
1. WC4 Windows: S middle; opens to the east; two pane gas filled; Mullion between H and I
a. Window width in inches ___37____.
b. Window height in inches ___37 7/8____.
c. Window depth in inches ____6___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WC4 windows _____1______.
f. Window screen type _______fiberglass that keeps out mosquitos, etc._______.
I. Window Type: Picture (Fixed Unit)
1. WP4 Windows: S middle; two pane gas filled; Mullion between H and I
a. Window width in inches ____37___.
b. Window height in inches ____37 7/8___.
c. Window depth in inches ___6____.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WP4 windows ______1_____.
J. Window Type: Casements
1. WC5 Windows: Southside SW; opening to the east; fire egress; two pane gas filled
a. Window width in inches ____33 1/4___.
b. Window height in inches _____38__.
c. Window depth in inches ____6___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WC5 windows _____1______.
f. Window screen type ______ fiberglass that keeps out mosquitos, etc ________.
K. Window Type: Casements
1. WC6 Windows: Westside south window; stone building; opening to the north; two pane gas filled;
a. Window width in inches ____33 1/4___.
b. Window height in inches _____38__.
c. Window depth in inches ___18____.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WC6 windows _____1______.
f. Window screen type ______ fiberglass that keeps out mosquitos, etc ________.
L. Window Type: Picture (Fixed Unit)
1. WP7 Windows: Northside east window; stone building; two pane gas filled
a. Window width in inches ____33 1/8___.
b. Window height in inches ____49 5/8___.
c. Window depth in inches ____18___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WP7 windows ______1_____.
M. Window Type: Casements
1. WC8 Windows: Northside second floor west window; stone building; upstairs; open to east; two pane gas filled
a. Window width in inches ____28 1/2___.
b. Window height in inches _____24__.
c. Window depth in inches ____18___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WC8 windows _____1______.
f. Window screen type ______ fiberglass that keeps out mosquitos, etc ________.
N. Window Type: Casements
1. WC9 Windows: Northside second floor east window; stone building; upstairs; open to west; two pane gas filled
a. Window width in inches ____28 1/2___.
b. Window height in inches _____24__.
c. Window depth in inches ____18___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WC9 windows _____1______.
f. Window screen type ______ fiberglass that keeps out mosquitos, etc ________.
O. Window Type: Casements
1. WC10 Windows: Eastside, north window; stone building; opening to the north; fire egress;
two pane gas filled
a. Window width in inches ____33 1/8___.
b. Window height in inches _____49 5/8__.
c. Window depth in inches ___18____.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WC10 windows _____1______.
f. Window screen type ______ fiberglass that keeps out mosquitos, etc ________.
P. Window Type: Casements
1. WC11 Windows: Eastside, south window; stone building; opening to the north; two pane gas filled
a. Window width in inches ____33 1/8___.
b. Window height in inches _____49 5/8__.
c. Window depth in inches ___18____.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WC11 windows _____1______.
f. Window screen type ______ fiberglass that keeps out mosquitos, etc ________.
Q. Window Type: Picture (Fixed Unit)
1. 1WP12 Windows: Southside, east wing, east window; two pane gas filled with wood border; low e mulled to WP 12/2
a. Window width in inches ___37____.
b. Window height in inches ___66 1/2____.
c. Window depth in inches ____6___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WP12 windows ____1_______.
Window Type: Casements
2. WP12 Windows: Southside, east wing, west window; two pane gas filled with wood border; low e mulled to 1WP12
a. Window width in inches ___37____.
b. Window height in inches ___66 1/2____.
c. Window depth in inches ____6___.
d. Contractor to field verify head, jamb, and sill extensions required.
e. Quantity of WP12 windows ____1_______.
f.
1.2 SUMMARY
A. Section includes the following:
1. Selective Demolition.
2. Wood windows.
3. Accessories.
4. Joint Sealant.
5. Paints and Stains.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
2. Review and discuss the finishing of windows that is required to be coordinated with the finishing of other work for color and finish matching.
3. Review, discuss, and coordinate the interrelationship of windows with other exterior wall components. Include provisions for anchoring, flashing, weeping, sealing perimeters, and protecting finishes.
4. Review and discuss the sequence of work required to construct a watertight and weathertight exterior building envelope.
5. Inspect and discuss the condition of substrate and other preparatory work performed by other trades.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. If submitting wood window products as proposed equals to the Name Brand products specified in article 2.2 provide cuts sheets and other data required to show the proposed equals being submitted meet or exceed the criteria required herein for review and approval.
B. Shop Drawings: Include plans, elevations, sections, hardware, accessories, insect screens, operational clearances, attachment to other work and adjacent materials, and details of installation, including anchor, flashing, and sealant installation.
C. Samples: For each exposed product and for each color specified.
D. Paint/Stain Drawdown Samples: Provide stain drawdown samples with formula for each type and color of stain/varnish.
E. Product Schedule: For wood windows. Use same designations indicated on Drawings.
1.5 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Delegated-Design Submittal.
C. Sample warranties.
D. Operation and Maintenance Manuals.
E. Manufacturer Certificate.
1. Warranty Certificate.
1.6 SUBMITTAL COORDINATION
A. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of the submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
1.7 QUALITY ASSURANCE
A. Requirement: Consult local code for IBC [International Building Code] and IRC [International Residential Code] adoption year and pertinent revisions for information on:
1. Window fall prevention and/or window opening control device requirements.
1.8 DELIVERY
A. Deliver in original packaging and protect from weather.
1.9 STORAGE AND HANDLING
A. Prime and seal wood surfaces, including to be concealed by wall construction, if more than thirty
(30) days will expire between delivery and installation.
B. Store windows units in an upright position in a clean and dry storage area above ground to protect from weather.
1.10 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace wood windows that fail in materials or workmanship within specified warranty period.
1. Warranty Period:
a. Window: 10 years from date of Substantial Completion.
b. Glazing Units: 10 years from date of Substantial Completion.
c. Hardware and other non-glass components are warranted to be free from manufacturing defects for ten (10) years from the original date of purchase.
PART 2 - PRODUCTS
All product/materials contained in the below sections are subject FAR Clause 52.211-6 Brand Name or Equal.
Despite a manufacturer and product being listed, it is a suggested product, but all products/materials are brand name or “or equal”.
Brand name or equivalent product must use manufacturer’s instructions and recommendations for product installation/application.
2.1 WINDOW PERFORMANCE REQUIREMENTS
A. Product Standard: Comply with American Architectural Manufacturers Association (AAMA)/Window and Door Manufacturers Association (WDMA)/Canadian Standards Association (CSA) AAMA/WDMA/CSA 101/I.S.2/A440 for definitions and minimum standards of performance, materials, components, accessories, and fabrication unless more stringent requirements are indicated.
1. Window Certification: WDMA certified with label attached to each window.
B. Performance Class and Grade: AAMA/WDMA/CSA 101/I.S.2/A440 as follows:
1. Minimum Performance Class: LC.
a. Except for larger window sizes where the window manufacturer recommends a
Minimum Performance Class: CW.
2. Minimum Performance Grade: 25.
a. Except for larger window sizes where the window manufacturer recommends a
Minimum Performance Class: CW the Minimum Performance Grade will be 30.
C. Thermal Transmittance:
1. National Fenestration Rating Council (NFRC) 100 maximum whole-window U-factor of
0.30 Btu/sq. ft. x h x deg F (1.71 W/sq. m x K).
2. Solar Heat-Gain Coefficient (SHGC): NFRC 200 maximum whole-window SHGC of 0.40.
D. Air Infiltration: Air infiltration (cfm/ft2 of frame @ 1.57 psf wind pressure) 0.05.
E. Water Resistance: Water resistance 7.5 psf.
F. Design Pressure: 50 psf.
G. Sound Transmission Class (STC):
1. Windows with vents minimum STC rating of 28.
2. Fixed windows units minimum STC rating of 30.
H. Wood Types: Pine, or Douglas Fir.
2.2 WOOD WINDOWS
A. Wood Windows:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Marvin Windows and Doors.
b. Pella Corporation.
c. H Window Company, LLC.
d. Other approved equals.
http://www.specagent.com/Lookup?ulid=51 http://www.specagent.com/Lookup?uid=123457121501 http://www.specagent.com/Lookup?uid=123457121498
B. Operating Types:
1. As indicated on Drawings, or in Photographs.
C. Frames and Sashes: Fine-grained wood lumber complying with AAMA/WDMA/CSA 101/I.S.2/A440; kiln dried to a moisture content of not more than 12 percent at time of fabrication; free of visible finger joints, glue stain, knots, pitch pockets, and surface checks larger than 1/32 inch (0.8 mm) deep by 2 inches (51 mm) wide; water-repellent preservative treated.
1. Exterior Finish:
a. Color: As selected by Contracting Office Representative (COR) from draw downs provided that match existing surrounding areas.
2. Interior Finish:
a. Exposed Unfinished Wood Surfaces: Must match the color of the existing extension jambs or match the color of the surrounding windows if the entire jamb is being replaced.
b. Color: As selected by COR from manufacturer's full range.
D. Insulating-Glass Units: American Society of Testing Materials (ASTM) E2190.
1. Glass: ASTM C1036, Type 1, Class 1, q3.
a. Kind: Fully tempered.
2. Lites: Two.
3. Filling: Fill space between glass lites with argon.
4. Low-E Coating: Pyrolytic on second surface.
E. Glazing System: Manufacturer's standard factory-glazing system that produces weathertight seal.
F. Hardware, General: Provide manufacturer's standard corrosion-resistant hardware sized to accommodate sash weight and dimensions.
1. Exposed Hardware Color and Finish: As selected by COR from manufacturer's full range.
G. Projected Window Hardware:
1. Gear-Type Rotary Operators: Complying with AAMA 901 when tested according to ASTM E405, Method A. Provide operators that function without requiring the removal of interior screens or using screen wickets.
a. Type and Style: As selected by COR from manufacturer's full range of types and styles.
2. Hinges: Manufacturer's standard type for sash weight and size indicated.
3. Single-Handle Locking System: Operates positive-acting arms that pull sash into locked position. Provide one arm on sashes up to 29 inches (735 mm) tall and two arms on taller sashes.
H. Weather Stripping: Provide full-perimeter weather stripping for each operable sash unless otherwise indicated.
I. Fasteners: Noncorrosive and compatible with window members, trim, hardware, anchors, and other components.
1. Exposed Fasteners: Do not use exposed fasteners to greatest extent possible. For application of hardware, use fasteners that match finish hardware being fastened.
2.3 ACCESSORIES
A. Head, Jamb, and Sill Extensions: Provide factory installed head, jamb, and sill extensions to match the interior wood species and factory finish fi not using existing extension jambs.
B. Trims: Provide new trim pieces such as exterior brick molds and interior window and sill aprons as required for a complete installation. Match profiles and wood species of existing trims to be removed and replaced to accommodate the new window installation, and match existing finishes.
Carefully remove old window and storm window hardware. Patch or replace wood and finish to match existing finishes. Contractor to submit new trim wood species, profiles, and finish cut as part of shop drawing submittal for approval by COR.
2.4 INSECT SCREENS
A. General: Fabricate insect screens to integrate with window frame. Provide screen for each operable exterior sash. Screen wickets are not permitted.
1. Type and Location:
a. Full, inside for project-out sashes.
B. Aluminum Frames: Complying with Screen Manufacturers Association (SMA) 1004 or
SMA 1201.
1. Finish for Interior Screens: Baked-on organic coating in color selected by COR from manufacturer's full range.
C. Glass-Fiber Mesh Fabric: 18-by-14 (1.1-by-1.4-mm) or 18-by-16 (1.0-by-1.1-mm) mesh of Polyvinyl Chloride (PVC)-coated, glass-fiber threads; woven and fused to form a fabric mesh resistant to corrosion, shrinkage, stretch, impact damage, and weather deterioration. Comply with
ASTM D3656/D3656M.
1. Mesh Color: Manufacturer's standard.
2.5 FABRICATION
A. Fabricate wood windows in sizes indicated and field verified. Include a complete system for installing and anchoring windows.
B. Glaze wood windows in the factory.
C. Weather strip each operable sash to provide weathertight installation.
D. Mullions: Provide mullions and cover plates, matching window units, complete with anchors for support to structure and installation of window units. Allow for erection tolerances and provide for movement of window units due to thermal expansion and building deflections. Provide mullions and cover plates capable of withstanding design wind loads of window units.
E. Complete fabrication, assembly, finishing, hardware application, and other work in the factory to greatest extent possible. Disassemble components only as necessary for shipment and installation.
Allow for scribing, trimming, and fitting at Project site.
2.6 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
4. Dispose of demolished items and materials promptly.
B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.
C. Disposal of Demolished Materials:
1. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain NPS's property, remove demolished materials from Project site.
a. Do not allow demolished materials to accumulate on-site.
b. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
2. Burning: Do not burn demolished materials.
3. Disposal: Transport demolished materials off NPS's property and legally dispose of them.
D. Cleaning:
1. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
2.7 JOINT SEALANTS
A. Sealants:
1. Urethane Sealant (Type S-1): Application for Exterior Joints.
a. W. R. Meadows; Product - Dualthane.
b. Pecora Corp.; Product - Dynatrol II.
c. Sika Corp; Product - Sikaflex 2c NS.
d. Tremco; Product - Dymeric 511.
e. Other approved equals.
2. Acrylic-Emulsion Sealant (Type S-2): Application for Interior Joints.
a. "AC-20," Pecora Corp.
b. "Sonolac," Sonneborn Building Products Div., ChemRex, Inc.
c. "Tremco Acrylic Latex 834," Tremco, Inc.
d. Other approved equals.
3. Joint Sealant Color:
a. As selected by COR from manufacturer's full range of colors.
4. Miscellaneous Materials:
a. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.
b. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials.
c. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.
2.8 PAINTING & STAINING
A. If lead based paint is present lead hazard work will be incidental to demolition (e.g. component removal with lead paint intact). No stripping, scraping or sanding of lead-based paint shall occur.
All existing associated window trims will be removed and replaced with new trims as required as part of this window replacement project.
B. In the event unknown lead based paint is discovered stop work and notify COR immediately. No work is to recommence in that areas until written approval is provided by the COR.
C. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels.
D. All materials, preparation and workmanship shall conform to requirement of the LATEST EDITION of the architectural painting specification manual by the Master Painters Institute (MPI) (hereafter referred to as the MPI Painting Manual).
E. Exterior Paint:
1. Stained Wood/Trim
a. Surface Preparation: Clean and Dry.
b. Finish: Match existing stain grade and color.
F. New Open Grain Woods for Transparent Finish:
1. Stain: MPI Category Semi-transparent for wood (1 Coat)
a. Surface Preparation: Clean and Dry.
b. MPI #90 Sherwin Williams Wood Classics Interior Oil Stain A49 Series (one coat)
c. MPI #90 PPG Paints Deft 400 Wood Finishing Stain (one coat)
d. MPI #90 Benjamin Moore & Co., 1AS12XX Series Lenmar (one coat)
2. Varnish: MPI Category: Varnish, Interior, Polyurethane, Oil Modified, Satin (2 Coats)
a. MPI #57 Sherwin Williams Wood Classics Polyurethane Varnish, Satin A67V1 (1 coat).
b. MPI #130 PPG Paints Deft 259 Polyurethane Varnish (1 coat).
c. MPI #57 Benjamin Moore & Co., 1Y.354 Lenmar (1 coat).
d. Fill nail holes with colored putty to match wood before second coat.
e. Topcoat – MPI #57 Sherwin Williams Wood Classics Polyurethane Varnish, Satin
A67V1 (1 coat).
f. Topcoat – MPI #130 PPG Paints Deft 259 Polyurethane Varnish (1 coat).
g. Topcoat – MPI #57 Benjamin Moore & Co., 1Y.354 Lenmar (1 coat).
PART 3 - EXECUTION
3.1 WINDOW INSTALLATION
A. Comply with manufacturer's written instructions for installing windows, hardware, accessories, and other components. For installation procedures and requirements not addressed in manufacturer's written instructions, comply with installation requirements in ASTM E2112.
B. Install windows level, plumb, square, true to line, without distortion, anchored securely in place to structural support, and in proper relation to wall flashing and other adjacent construction to produce weathertight construction.
C. Adjust operating sashes and hardware for a tight fit at contact points and weather stripping for smooth operation and weathertight closure.
D. Clean exposed surfaces immediately after installing windows. Remove excess sealants, glazing materials, dirt, and other substances.
E. Remove and replace sashes if glass has been broken, chipped, cracked, abraded, or damaged during construction period at no cost to the government.
3.2 JOINT SEALANT INSTALLATION
A. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.
B. Install sealant of kind indicated and install as required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.
1. Do not leave gaps between ends of sealant backings.
2. Remove excess sealant…