Statement of Work.pdf
PDF 620 KB Posted
- Attached to
- Flooring Repairs
- Solicitation number
- 1232SA26Q1229
About this file
This is a Statement of Work for flooring repair services at the USDA Southern Regional Research Center (SRRC) located at 1100 Allen Toussaint Boulevard, New Orleans, Louisiana 70124.
The contractor is required to replace damaged flooring on the first floor hallway of the Industrial Wing and in two laboratory spaces (Labs 3217 and 3215). The scope of work includes removal of existing damaged flooring, repairs to the sub-flooring, skimming of floors, and installation of new Vinyl Composition Tile (VTC) flooring to match the existing pattern. The document specifies that molding shall be replaced as necessary to match existing conditions. Reference samples provided show the flooring consists of two colors: a light beige/cream colored tile and a darker gray tile in an alternating pattern design. The contractor must match these existing tiles in both color and pattern during installation. Photographs document the current condition of the hallway, which shows visible damage and staining to the flooring, and both laboratory spaces showing the existing tile layout and condition. No specific completion deadline, budget amount, or contract terms are included in this Statement of Work document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 - Amend 01.pdf | ||
| Site Visit 08192026 Sign In.pdf | ||
| RFIs.pdf | ||
| Site Visit 08182026 Sign In.pdf | ||
| Wage Determination.pdf | ||
| SF-1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
USDA/SRRC Repair of flooring Industrial Wing Southern Regional Research Center 1100 Allen Toussaint Blvd New Orleans, LA 70124
The Southern Regional Research Center requires the replacement of damaged floors in the Industrial Wing at the USDA/Southern Regional Research Center, 1100 Allen Toussaint Blvd., New Orleans LA 70124.
This work is to replace the damaged flooring on the 1st floor hallway of the industrial Wing and in Labs 3217 and 3215. The existing flooring shall be removed and repairs made to the sub-flooring. The floors should be skimmed and new Vinyl Composition Tile (VTC) flooring should be installed to match existing. Molding should be replaced as necessary to match existing.
Industrial Wing Hallway 1st Floor from crosswalk
Industrial Wing Hallway 1st Floor Crosswalk
Industrial Wing Lab 3215
Industrial Wing Lab 3217
Matching light tile
Matching dark tile
File details come from the government source that posted it. Updated .